varnishing landing floor les guis virlet puy de dome franceFirst job was to varnish the floor and the stairs with the third coat of varnish. I gave it a good wallop and it was all over by 10:30. All it needed to do was to dry and set thoroughly – that’s usually about 48 hours. And then I can fit the skirting.

While that was drying, I went outside and had a look around at what jobs that I can be doing. First job was to start on the compost bin. But I didn’t last long on that as I remembered something else quite important to do.

new wheels summer tyres ford transit caliburn les guis virlet puy de dome franceAnd doesn’t Caliburn look nice with his new clean wheels?

Yes, I needed to change his winter tyres and fit the summer tyres. Of course, I have two sets of wheels so I really just change the wheels. And because they have been outside for 4 months, they were pretty grubby and so I gave them a really good clean and polish.

One or two of them have come up really well too, but I’m thinking that I might give all of the wheels a good clean, scrub and coat of paint over the summer. I’ll add that to the thousand other jobs.

Another job that I wanted to do was to fix the guttering on the house. This involved assembling the ladder now that I’ve recovered both the parts, but on my way up to the scaffolding I noticed that I hadn’t painted part of the fascia board where I couldn’t reach off the scaffolding. This meant that I had to reposition the ladder, and then I could deal with that.

While I was waiting for that to dry, I started to cut the lengths of wood that I needed to start to make the compost bin (which was where I started) but in a search for something or other, I started to tidy up the downhill lean-to. And I made some progress too, much to my surprise.

fascia board guttering les guis virlet puy de dome france After lunch, I put the second coat on the fascia board and then started to reassemble the guttering.

I’ve repositioned it slightly because in the past, it drained down to the roof of the verandah and into the water tanks there. Now, I’m having drop onto the roof of the lean-to at the other side, because it’s there that i’ll be digging the hole for the subterranean water tank.

It took a while to do that because I had to work out the levels and cut a few lengths to size. I did as much as I could (I need to check it in the rain and make sure that it works like it should before I glue it together) but when I went to move the ladder round to the side of the house to fix the downpipe, I noticed that it was already 19:20

Doesn’t time fly quickly when you are enjoying yourelf? That was enough for me and I called it a day. I’d earned my rest.

Give me your opinion of this post
  • Excellent 
  • Useful 
  • Interesting 
  • Weird 
  • Surprising 
  • Boring