Tag Archives: varnishing stairs

Wednesday 8th April 2015 – GUESS WHO HAS BEEN A BUSY BOY THEN?

Yes, I’ve accomplished a lot today. It’s really been keeping me out of mischief.

I was up early too for a change. When the alarm went off, I was eating my breakfast. I must have been keen.

varnishing landing floor les guis virlet puy de dome franceFirst job was to varnish the floor and the stairs with the third coat of varnish. I gave it a good wallop and it was all over by 10:30. All it needed to do was to dry and set thoroughly – that’s usually about 48 hours. And then I can fit the skirting.

While that was drying, I went outside and had a look around at what jobs that I can be doing. First job was to start on the compost bin. But I didn’t last long on that as I remembered something else quite important to do.

new wheels summer tyres ford transit caliburn les guis virlet puy de dome franceAnd doesn’t Caliburn look nice with his new clean wheels?

Yes, I needed to change his winter tyres and fit the summer tyres. Of course, I have two sets of wheels so I really just change the wheels. And because they have been outside for 4 months, they were pretty grubby and so I gave them a really good clean and polish.

One or two of them have come up really well too, but I’m thinking that I might give all of the wheels a good clean, scrub and coat of paint over the summer. I’ll add that to the thousand other jobs.

Another job that I wanted to do was to fix the guttering on the house. This involved assembling the ladder now that I’ve recovered both the parts, but on my way up to the scaffolding I noticed that I hadn’t painted part of the fascia board where I couldn’t reach off the scaffolding. This meant that I had to reposition the ladder, and then I could deal with that.

While I was waiting for that to dry, I started to cut the lengths of wood that I needed to start to make the compost bin (which was where I started) but in a search for something or other, I started to tidy up the downhill lean-to. And I made some progress too, much to my surprise.

fascia board guttering les guis virlet puy de dome france After lunch, I put the second coat on the fascia board and then started to reassemble the guttering.

I’ve repositioned it slightly because in the past, it drained down to the roof of the verandah and into the water tanks there. Now, I’m having drop onto the roof of the lean-to at the other side, because it’s there that i’ll be digging the hole for the subterranean water tank.

It took a while to do that because I had to work out the levels and cut a few lengths to size. I did as much as I could (I need to check it in the rain and make sure that it works like it should before I glue it together) but when I went to move the ladder round to the side of the house to fix the downpipe, I noticed that it was already 19:20

Doesn’t time fly quickly when you are enjoying yourelf? That was enough for me and I called it a day. I’d earned my rest.

Tuesday 7th April 2015 – THE WIND FINALLY DROPPED THIS EVENING.

That made quite a change as we’ve had non-stop wind for the last three days or so.

All kinds of records have been broken too with the wind. For example, of all the wind energy created by the big AIR 403 wibd turbine since I reset the meter in December, 40% of it came today. And with the small wind turbine, today has doubled the previous record of wind generated.

It really was impressive but now it’s blown out and we are all quiet.

This morning, I took decisive action and ripped out all of the masking and protection on the stairs and on the landing downstairs. I gave the stairs and landing a thorough clean, sanded all of the imperfections, vacuumed it thoroughly and then gave it all a really good coat of varnish.

That took about an hour and a half in total, and so for the rest of the morning I went outside. First job was to sort out a huge pile of old cardboard that I had put on one side when I tidied the barn out the other day.

cardboard cover raised beds les guis virlet puy de dome franceWith all of that, I went down to the raised beds in the garden where I grow my crops of vegetables. Nothing is going to be done there this year, so I’ve covered over all of the beds with cardboard. I did 6 this morning, and then this afternoon I dismantled the bean frames and did the rest.

I’ve only weeded two of them, the rest can take their chance. BUt it’s not going to be a problem for as soon as it rains and the cardboard becomes waterlogged, it’ll fold down flat onto the soil in the raised beds, suffocate the weeds and then slowly disintegrate into the soil over the period of the coming year.

Immediately after lunch, I put the second coat of varnish on, and I’ll do the third coat first thing in the morning.

For tea tonight I made a mega-mushroom and potato curry. Mushrooms were cheap at the weekend and I had some potatoes left over from winter.

And there was so much surplus energy today that the water in the dump load (the home-made 12-volt immersion heater) went off the scale – ie over 70°C. I had some lovely hot wahing-up water this evening.

Wednesday 14th January 2015 – WELL, HERE YOU ARE THEN.

painted stairwell attic les guis virlet puy de dome franceThe stairwell, all painted a nice blue.

It wasn’t going to be as nice as this though, because the paint was a lot darker than indicated on the tin and I didn’t fancy that idea too much. So into the can went a litre of white paint and that lightened it up a little.

And it was a good job that I did that too, because there wouldn’t otherwise be enough to do a second coat, which is what I’m going to be doing tomorrow. And it needs it too because I’ve been doing it with a brush and it doesn’t go on particularly thoroughly.

painted stairwell attic les guis virlet puy de dome franceIt took ages to do too, and it was long after 14:00 when I knocked off for lunch – more like 15:00 in fact, but I wasn’t going to stop work until I had finished the painting.

After my very late lunch I tidied up again and then carried on with the floor in the shower room. That is now all down and fitted in position, apart from the end block which will go under where the door will be.

For tea, I found an old tin of curried mixed beans and so I fried some onions, garlic and potatoes in olive oil and spices, and then added the tin of curried beans and a large tin of vegetables. Now there’s enough there for a good few days and that suits me fine.

For tomorrow after the second coat of paint, I’ll be cleaning up the exposed woodwork of the beams and rafters and painting it in the dark brown wood preservative. Once that is done, I’m going to go for it and start on fitting the door for the shower room. At least if I can do the door frame that will be a great advance.

I’ve worked out that I need three clear days to varnish the stairs and leave each coat to dry before I walk on it. If I go to the shops in Montlucon a week on Saturday, we’re rehearsing the radio programmes on the Sunday and then recording on Monday, then it looks like I have almost a week and a half to do as much of the flooring and woodwork that I can and sand everything down ready to start the varnishing on the Saturday before I head off to Montlucon.

That sounds like a good plan.

Tuesday 30th December 2014 – WELL, THAT WAS A WASTE OF TIME.

Remember yesterday when I was busy putting that piece of wood in to fill that unexplained gap in the woodwork and ended up falling down the stairs?

This morning I started to fit the plasterboard into position, and after a good hour or so at the cutting, measuring and fitting, and also fitting in some bracing which was unaccountably absent, the light suddenly went on in my head. Yes, where is the insulation in the wall?

Off came all of the plasterboard that I had cut and shaped, and off came the bracing that I had fitted, and on went 40mm of polystyrene insulation. And now I can see why there was that unexplained gap – it was for passing the insulation through and out behind the stairs. Still, it’s too late to do much about that now.

Before I had started on the plasterboard, I had taken the masking off the floor under the stairs on the landing, and put the first coating of varnish on there. I’d put the second coat on and fitted the stairs too. So that’s another job out of the way.

I’ve even had a bit of good luck too. Aeons ago, when I lived in Brussels, I bought a pack of 100mm wide 25mm thick planed wood planks to make some shelves, but I never used it. I discovered two of the planks and tried them as end-stops for the plasterboard stud walls. They seem to be perfect for this job and so tomorrow I’ll have a go at fitting tham.

I’ve also rerouted a pile of wiring so that it will run under the false ceiling on the landing and then down with all of the other wiring between the stud wall that has the shower room on one side and the head of the stairs on the other side, and I can’t think why I didn’t do this ages ago.

As for the water issues, the front tap thawed out slightly today and the leak isn’t anything like serious. It’s losing about half a litre every hour, but more when the tap is open. The rear tap is still frozen up so I can’t isolate the front tank.

Mind you, the frozen tap is doing that so it’s the same thing really, and as for the leak, the front tank needs to be emptied anyway so that I can change the tap so it’s neither here nor there. I’ve emptied 40 litres out of it today into various containers and I’ll keep on doing that for now until the weather warms up and I can isolate the front tank.

Monday 29th December 2014 – OUCH!!!

Yes, I fell down the stairs today.

I was at the top of the stairs fixing in a piece of wood into the corner at the back of the upper stairs and I had to reach right across the stairwell to screw it in. And then I forgot that I was reaching right across a void and put my foot down again. And that was that.

But that’s not the worst of the problem. I’m going to be having water issues here when the thaw sets in. It’s not so bad at minus 10.5°C such as we had during the night, but the severe temperature has cracked one of the taps on the water butt. The other two taps that control the flow into the front water butt are frozen solid so I can’t cut off the supply. That means that if the front water butt defrosts before the rear one, then I’ll lose all of the water in the containers.

That’s not the only issue that I’ve had with water either. I keep a 5-litre container of water in the bedroom for all kinds of different purposes, and I’ve managed to kick that all over the floor.

And that’s not all either. After varnishing the stair treads and risers that I cut the other day, I went to emulsion the wallpaper that I’d fitted in the stairwell. The first tub of white paint that I found had varnish in it. The secpnd one had lime mortar in it. And that was that.

Luckily I had some crepi left over from when I did the walls in the cupboard under the stairs, so I applied that to the wallpaper. And when I checked the job an hour or so later, the weight of the crepi had pulled the paper off the wall. In the end, I pulled the paper off the wall and put the crepi directly on the plasterboard. And if I had done that first instead of last, this job would have been finished three days ago.

I forgot to ention that Brico Depot on Saturday was having a sale of LED light bulbs – 4.2 watts at €3:99 each which is a bargain in anyone’s money. I bought all 14 that were left and this will complete the bilbs that I need for the barn with a couple left over.I tried a couple in the barn and I wasn’t half impressed.

As you know, I’m working in the bedroom and on the ground floor at the moment so I took out the 1.2 watt LED light bulbs in each room and put the extra 4.2 light bulbs in there. And the difference is phenomenal. I can actually see what I’m doing now in there at night and that makes a change.

This was something else that I should have done ages ago.