Tag Archives: first floor

Friday 20th February 2015 – AHHH WELL!

Yes indeed!

door wardrobe bedroom les guis virlet puy de dome franceYesterday I told you of everything that I needed to do on the wardrobe, and how I would be lucky to do half of it. In fact I’ve managed to make the framework for one pair of doors, assemble a pair of doors and hang one of them.

And that’s it.

And I’m not sure why either. It’s not as if I’ve been slacking or been distracted, or spent hours looking for stuff either. I’ve put in a good shift and made good use of the circular saw and the new belt sander (with which I am very impressed – it does exactly what I wanted it to do) too, but for some reason I don’t think that I’ve advanced very much.

I’ll have to work much harder than this if I want to make progress because this isn’t very good at all. if I carry on like this I’m never going to accomplish anything. However, I’m not quite sure how I can work any faster. After all, as I have already said, it isn’t as if I’ve been slacking.

After knocking off, I went into Pionsat. Firstly, for a pile of shopping at the Intermarche of course, and secondly to put a load of washing into the washing machine there. As I have said before … "and you’ll say again" – ed … installing the little launderette at the Intermarche was the best thing that the owners of the supermarket ever did.

I had the clothes hanging outside in the wind, because we’ve been having a lovely windy day today, but when I was outside later doing the stats, it started to rain so I’ve stuck it all in the verandah.

Now I’m all set up for the weekend.

Friday 6th February 2015 – NOW HERE’S YET ANOTHER THING;

Yes, I curtailed my lunch break today.

And there was a good reason to. It was cold today in my attic and I didn’t feel much like hanging around. I reckoned that I may as well go back to work early and then knock off early, and come up here and light a fire.

But it didn’t quite work out like that.

This morning it was comparatively warm up here compared to what it was on the groud floor – 12.8°C here compared to a mere 0.4°C downstairs. And with 3°C in the bedroom, at least the decorators’ door that I fitted yesterday is doing something. Especially when outside, we’d had heavy snow during the night and it was minus 4°C, and that was how it stayed for the day.

I cracked on with the window surround this morning and I made good progress. One side was done and half of the other was done by lunchtime. and I was impressed by that.

But with the curtailed lunch break I attacked the rest of it and despite a few distractions, such as scavenging around for offcuts of the type that I’m using. And even though it got colder and colder, and now I know why old-time carpenters preferred tools with wooden handles after handling metal tools all day in 4°C, I put in a good shift. And even though I was intending to knock off early, it was 18.30 when I knocked off.

window surround bedroom les guis virlet puy de dome franceMind you, it was worth it, because as you can see, the window is now finished – except for the varnishing and the beading, but that’s not going to be done for quite a while. It’s too cold for varnishing and I don’t have any of the correct-sized beading.

But I am impressed with this. It’s certainly better than the first effort, but then fitting the wooden sill instead if tiling it gave it a much better start.

Up here it was 8.9°C – the lowest that it’s been for a couple of years while I’ve actually been here, but the temperature outside is plummeting alarmingly. A nice roaring fire and a plate of vegan sausages and mash however quickly put some heart in me.

And you can tell who is a Government employee and who is self-employed. I’ve seen neither hide nor hair of the postie for a week, yet the boulangère struggled down here, half a mile here and half a mile back through the snow on foot to bring me the weekend’s bread. Hats off to Sophie!

Wednesday 4th February 2015 – LEAVING THE FIRE …

… simmering away through the night did some good. It was 13.4°C in here this morning. Mind you, in the house downstairs it was an impressive 1.9°C. The weather really has gone cold here right now and it’s staying cold too. It had snowed during the night too.

First job was to make a start on the plasterboard walling.

plasterboard stud wall bedroom les guis virlet puy de dome franceThere was quite a bit of studdding that needed to be fitted – I hadn’t done that correctly at all – and then I cut the second piece of plasterboard (the first piece was fitted yesterday). That needed a hole cutting in it for the light switch. That’s much better than trying to cut four out, isn’t it?

You’ll notice the two length of wood screwed into the top of the first piece. Having had years of experience of fitting plasterboard single-handed, those lengths of wood make rails. You slide the plasterbord over the top and down the back, clamp it to an upright (ou can see the clamp at the top of the image) and then once you hve trimmed the board (GRRRRR!) it’s ready to be screwed into position.

Getting to that position took me until lunchtime at 14:00 but I wasn’t going to stop. I carried on fitting the rest of the plasterboard and that took me until 14:40.

After lunch, in view of the fact that there was a little sun, I vacuumed up the landing and then masked off everywhere ready for painting. No point in doing that though in 1.9°C.

To finish off tonight, I mixed up a bowl of filler and put it on the wall. That took me until 18:40 and then I knocked off and fled into my room. I was absolutely freezing. It’s no fun working in 1.9°C – and that’s indoors too.

Tuesday 27th January 2015 – I’M POSSIBLY BEING A LITTLE OPTIMISTIC …

… about finishing the landing by the weekend. It’s been slow going today.

Mind you, it hasn’t helped in that I had a lot of housekeeping to do here this morning. I ran out of both kindling and logs, and the compost bucket needed emptying too. Doing that latter task, I found that the tie that’s holding up the collapsed apple tree had come apart and so that needed sorting out.

Eventually, I managed to start to attack the landing and Shock! Horror! all of the plasterboard is on the wall now. And not only that, the wiring is all tidied up and the light switches are in place.

I’m not going to post a photo of it though, because it’s a mess. What didn’t help the artistic impression was that I had spent an hour carefully carving a piece of plasterboard to fit perfectly and to take the pattress for the light switches, and then I dropped it from a height right onto the edge of the steps upon which I was standing, and knocked a huge lump out. Never mind, I can fill it but it isn’t pretty.

I had to put loads of battens in place too for the plasterboard, and some of the wood took a while to find. My aim to have it all done by lunchtime was thus totally missed. It was 17:00 by the time I had done all of the plasterboarding.

I’ve fitted the rails for the suspended ceiling – and that wasn’t easy either. And even though it was after 18:00 and knocking-off time, I fitted the symbolic first piece of ceiling. It was 18:35 when I finally made it up here. What helps about working late is having really good music to listen to. I’ve made it round to Hawkwind’s Astounding Sounds; Amazing Music, which features, inter alia, two of the most magnificent rock music tracks ever recorded – “Reefer Madness” and “Steppenwolf”.

As well as that, as I have said before … "and you’ll say again" – ed … that Ryobi Plus One percussion screwdriver is immense – it pushes 6×100 screws in like nobody’s business.

Tomorrow I’ll be fitting the rest of the ceiling and putting the first coat of varnish on. And if I have some sun (which isn’t likely, I have to say) I’ll be cutting the end pieces for the plasterboard runs and seeing if I’ll have the time to fit them.

It does however occur to me that in order to fit the end pieces on the stud wall between the landing and the bedroom I’ll need to have the bedroom door in position and the hinge lets cut out. That’s going to take a while and will be the big reason why I’ll miss my target of this weekend for the landing to be completed.

Thursday 22nd January 2015 – FIAT LUX!

12 volt lights bathroom les guis virlet puy de dome franceAnd we aren’t talking about Italian cars and washing … "you’ve said that bedore" – ed

Anyway, we now not only have a varnished and shiny floor (covered in cardboard while it hardens) in the shower room, but we also have lights. To fit these was so straightforward that I can’t uderstand how it is that I haven’t fitted them before this.

And I’ll tell you something else for nothing too – those push-in spring-loaded wire connectors really are the business and I’m glad that I discovered them.

In fact, all in all, what I’ve learnt since I’ve been doing up this house has made me wish that I could go back and do the attic all over again.

12 volt lights bedroom les guis virlet puy de dome franceFitting the lights in the bedroom was not quite so easy.

Regular readers of this rubbish will recall that I’ve not installed one of the cables that needs to connect up the main lightswitch to the pull switch that I wanted to install. It’s not possible to install it no and so I had to rewire it into a single way switch.

All the four lights, bulbs and bulb holders were fitted but wiring it all up was something of a struggle, particularly as I’d forgotten which wire went where (I hadn’t counted on a three-year lay-off from finishing it off) but I eventually worked it all out and wired it into the 12-volt wiring circuit, even though all together it took me most of the day.

The beichstuhl is now temporarily installed in the shower room and then to finished, I sanded down, shaped and installed the skirting board at the head of the stairs.

And if the evidence of the last couple of weeks is anything to go on, my regular working hours have now gone out of the window. I think that having the music certainly helps.

Tuesday 20th January 2015 – I’VE HAD ONE OF THOSE DAYS …

… today. And it all went wrong as early as breakfast time. I was thinking to myself that my breakfast coffee tasted pretty awful, and closer inspection revealed that I was in fact drinking merely hot water in a coffee-flavoured mug. That depressed me for a start.

And then going downstairs I fell through the trap that I had made yesterday, and only quick thinking by grabbing the beam as I fell through it prevented me from plummetting down to the concrete floor about 3 metres below.

I’ve done myself quite a mischief, but while I was hanging there from the beam working out the best way to haul myself back up, I came to the conclusion that maybe the hatch was not such a good idea after all.

I mean, it is an excellent idea but it won’t work here, because there’s not sufficient support around the edges to carry the weight of whatever is going to be walking across it, as I had just demonstrated. Consequently, once I had ccrawled back up onto terra firma, I ripped out the hatch and the surround and spen the rest of the morning refitting both layers of the floor. I’d nearly finished by lunchtime but I carried on regardless until it was finished.

I know that I said that I was going to vacuum out the bathroom and put the first coat of varnigh on the floor, but as you might expect after I’ve talked about such things, we were having a slight snowstorm and there was a hanging cloud here for most of the morning. That put the kybosh on the vacuuming.

After lunch I fetched a pile of wood into the house for the fire, but all of a sudden, the sun put in a bried appearance. Out came the vacuum cleaner and I cleaned out the bathrrom and then did the first coat of varnish.

As for the vacuum cleaner, there will be some who would complain about the lack of efficiency, but these people would have seen the price tag (€29:99 reduced to €14:99) and not seen the power of the machine – 600 watts instead of the more usual 1500 watts. I knew exactly what I was buying and I knew exactly how it was going to work, and so I was not disappointed at all. It did exactly what it said it would and did it quite efficiently too, and I was delighted.

I spent the rest of the working day cutting a board that I need for the head of the stairs – I’d forgotten about that. I’ll fit that next time I’m working here as I’m out all day tomorrow.

I’ve also fitted the handrail for the stairs. Two huge screwed eyes and a length of 14mm hemp rope, and that’s made quite an effective handrail.

It’s not 100% my own idea though. I knew that I had seen something like this before, and the other night, watching the absolutely outstanding Green For Danger, there it was, on the stairs of the Nurses’ Home. It looks as if I’m going back in time.

I was working long after 18:00 but I had a phone call that interrupted me for 10 minutes. Terry had the census people round there and they didn’t speak English, so I was required to interpret.

So tomorrow, I won’t be here as I have things to do. But I’m going to put the second coat of varnish on the bathroom floor before I go, and if I remember, I’ll put the third coat on when I come back and that’s the flooring all done down there.

Monday 19th January 2015 – I HAD A LOVELY EARLY SUMMER’S DAY …

… working outside this morning. And I do mean early summer too because it was glorious.

First job was to empty the beichstuhl – such are the delights of my mode of living – clean it out and recharge it ready for use. Ohh the joys of low-impact living.

Next job, which took me right up to almost lunchtime was dealing with the water butts. You may recall that the tap on the front tank had cracked in the severe cold that we had the other day. Good job that I had fitted a series of isolation valves so that I can separate one tank from the other. I’ve been drawing the water off the front tank as it all slowly leaked away and by the end of last week it was finally empty.

When I was in Montlucon on Saturday, I bought everything that I needed, and so I set about dealing with the tap as well as giving the tank a good clean while I was at it. It’s a testament to the effectiveness of the system that I’ve designed and built here that aftera couple of years, the front tank wasn’t particularly dirty. It didn’t really need a clean but nevertheless I gave it a good going-over.

Then, I dealt with the tap. That was soon fitted, and not only do I have the tap but I now have an overflow as well as a depth gauge. Now I can see how much water there is in the tanks.

The tap has been insulated and I’ll need to insulate the clear plastic pipe that forms part of the depth gauge once I work out how to do this. I’ll have to give the matter some thought.

This afternoon I sanded down the floor in the bathroom, seeing as how we had plenty of sun. Tomorrow morning, I’ll vacuum up the dust, which will give me an opportunity to see how well this dust cleaner will perform, and then put the first layer of varnish on it so that it will go dry while I’m havine lunch. I’m out on Wednesday so I can put the second coat on before I leave, and the third coat as soon as I come back. I want to do this while I’m not doing any work, so that there’s no dust about to stick in the varnish.

So as well as sanding down the floor, I’ve been working on the floor on the landing. The first board is nailed in place, the trapdoor has been cut out, and the second board has been cut to shape and filed down to take the recessed hinges. If I can finish this on Thursday, then I can varnish this at the same time that I’ll be doing the stairs – namely on Saturday, Sunday and Monday.

I’m really crcking on with this place now. If I’m not very careful, it will start to look as if someone is actually living here.

Friday 16th January 2015 – AFTER ALL THAT I SAID LAST NIGHT …

… about having loads of sun so that I could sand down the floor of the shower room, then I woke up this morning to a hanging cloud. I suppose that that was odds-on, wasn’t it?

So having put the kybosh on the sanding, first thing this morning was to put the second coat of wood treatment on the old exposed beams. That didn’t take too long, From there, I attacked the floor on the landing on the first floor.

And cutting the first floorboard took almost all of the morning. It needed three lets cut in it so that it could fit around the verticals, and they had to be cut pretty precisely. Once that had been done, I had to cut a couple of countersinks into it so that the hinges that fit into it will be flush with the surface.

go on table saw bricomarche commentry les guis virlet puy de dome franceI needed to cut some floorboarding planks into 50mm lengths to make a framework for the trapdoor, and so despite the absence of electricity I decided to put the new table saw to use.

As I suspected, it is a cheap rubbishy thing (as I suspected) but it did the job well enough once I’d worked out how to fit the guide rail. But in news that will surprise most people, but not the more cynical amongst us, the built-in measure is reading 4mm short. Good job I measure up after I cut the first one, isn’t it?

After lunch, I filed down the offcuts that I had cut so that they made a neat line, and then went off to look at the painting. My masking isn’t up to much, it seems, as I have plenty of white spaces where the masking tpe prevented the wallpaper from reching, and also some of the wood treatment on the old beams has filtered down behind the tape. I’ll have some touching up to do on Monday.

Last job tonight was to cut the second “long” plant to size. That needed trimming off and a couple of lets cut into it to fit around the verticals. That’s now done and so on Monday, another thing that I can be doing is to cut out the trap door in the lower layer of floorboards. Whnen that’s done, I can fit the last two sheets of plasterboard on the studding on the landing, and then cut out the trap on the upper layer of floorboards.

Thursday 15th January 2014 – I’VE FINISHED …

… the painting of the walls in the stairwell today. And I’m glad that I put a second coat of paint on the walls as they certainly needed it – when it was dry, the first coat didn’t look as well as it had looked when I was doing it.

As the colour dried out, it went darker. Consequently I tipped another litre of white paint into the 3 litres of blue paint that was left over and the paint mixer attachment that I fit into the Ryobi Plus One drill mixed it all up quite a treat. I shall be doing a little more of this paint mixing now that I know that it works.

This afternoon I started to strip off the superfluous masking and I must admit that it looks quite nice, especially the contrast between the blue paint and the wooden ceiling and window surrounds. Mind you, the removal of the masking took longer tha I expected.

Once I’d done that, I had to remask around the roof beams that are visible, and I put the first coat of dark brown wood treatment on there. The second coat will go on tomorrow morning first thing.

Finally, I cut down to size the piece of wood that I’ll be using as the end stop of the shower room floor that fits under the door. That is now fitted into place now, ready for me to start tomorrow on fitting the floor on the landing (unless we have plenty of sun in which wase I’ll be sanding down the shower room floor ready for varnishing.

Tuesday 6th January 2015 – ANOTHER MILESTONE …

… has been reached today.

Remember in the Spring when I bought that 500-watt ash sucker that I reckoned that I could convert quite easily into a vacuum cleaner? Well, without any conversion at all, I used it today to vacuum all of the dust that had collected on the stairs over the last year or so. And I was ever so impressed with this, almost as much as I wam with my galvanised steel dustbin. Even though it’s only 500 watts, it did a terrific job – much better than I was expecting. Once that had been done, I set to and masked off everywhere in the stairwell that I could reach.

The small ladder that I used when I fitted out the stairwell is now being used in the inspection pit and so I had to spend most of the day being an acrobat trying to reach the far-flung corners, and it wasn’t until I’d knocked off that I asked myself how come I hadn’t thought about the small ladder on the roof of Caliburn.

It took ages to mask off the stairwell and so that left me only about an hour or so to start to fill in the screw heads and the plasterboard joints. It’s going to take much more than that to do all that needs doing, and so I’ll be spending most of the day on Caliburn’s ladder, assuming that I remember to fetch it.

WHat else I’ll be doing is to try to hang the door for the cupboard at the back of the stairs. I put the final coat of varnish on that this morning and so tomorrow morning I can fit the hinges on the door and measure up to fit the hinges on the doorframe.

Monday 5th January 2015 – I CRACKED ON …

… with the work today, but not necessarily in the direction in which I was intending to go.

I started off by cutting down some floorboarding planks to the correct size to make the end pieces for the plasterboard runs and the doorway into the cupboard at the back of the stairs and at the end of the wall by the stairs. The latter one involved some quite intricate shaping but it was soon done and doesn’t look to bad.

And I do have to say, if I haven’t already … "yes you have" – ed … that this Ryobi Plus One percussion screw driver is a tremendous piece of kit and I’m thoroughly impressed with this – almost as much as with my galvanised steel dustbin.

Next job was to clean off the stairs and mask off everything ready to start the filling of the plasterboard joins and screw holes, but then I had another idea.

If I sand down the filler (and for the moment, I can’t find the sander) the dust will go everywhere, including into the cupboard at the back of the stairs, so the cupboard will need to be masked off. And that gave me an idea. If I have to mask off the cupboard, why don’t I simply make the door for the cupboard instead? Killing two birds with one stone as it were.

door made of floorboards for cupboard at back of stairs first floor les guis virlet puy de dome franceAs it happened, I had a pack of the cheap floorboarding left over, and that was exactly what I needed for the job.

I assembled the four lengths, battened them and reinforced the battens, cut the door to size (four cuts with the circular saw – just as well we had another Alpine day today) and then cut the lets for the hinges. The first coat of varnish went on too before knocking-off time and that was that for today.

This evening, the temperature in here reached almost 30°C as I cranked up the fire to cook some tea. I brought up some fresh wood and that burned fine, and then I put in some of that old damp stuff and it seemed to dry out as the fire became hotter. It was all quite impressive.

Tomorrow I’ll be putting the other two coats of varnish on the door and tidying up ready to start on finishing off the stairway.

Wednesday 31st December 2014 – NOW HERE’S A THING.

While I was having (a rather late) breakfast this morning, I started to empty out the woodstove and clean the glass window. But much to my surprise, the big log that I put in there last think last night was still smouldering away.

It didn’t fire up however when I opened the foor, but it was still something of note to see it.

After breakfast, Iwent out to look at this idea of fitting the wood to the ends of the runs of plasterboard as I mentioned yesterday. However, I was thwarted right at the start, because it was one of these jobs where you needed to do several other things before I could start.

I had to fit a few lengths of tongue and grroving as a false ceiling, but before that I had to fit the plasterboard onto part of the stud walling. And before I could do that, I had to move some wiring around.

Anyway, you get the picture.

However, we have made a little bit of history because we now have, for the first time, plasterboard on both sides of part of the stud walling. That’s history in the making of course, and it means that whatever is between the two layers of plasterboard is there for good now, in exactly the same place as it’s going to be.

tongue and groove ceiling wooden plasterboard ends les guis virlet puy de dome franceThere’s 5 lengths of tongue and grooving in the ceiling as well, enough to clear the stairway.

And while I was doing all of this, I had another idea. I don’t have too much of this wood that I was talking about yesterday, so seeing that it’s good, heavy stuff I’m going to save it for where I’m putting the hinges for the doors. For the rest, I’ve been experimenting with floorboarding. I cut one to size, trimmed off the tongue and then with the circular saw I cut the width to size.

I had to file and sandpaper the edge where I cut the width to size, and it didn’t turn out to be as bad as I was fearing. A power plane or a belt sander would finish them off quite nicely but I don’t have them so I’ll have to do without.

So while it might not look as if I’ve done much today, it is in fact an enormous amount of progress both physically and psychologically too. Just one piece of wood to be fitted and then I can start to fill and then sand down the stairwell ready for wallpapering and painting

Monday 29th December 2014 – OUCH!!!

Yes, I fell down the stairs today.

I was at the top of the stairs fixing in a piece of wood into the corner at the back of the upper stairs and I had to reach right across the stairwell to screw it in. And then I forgot that I was reaching right across a void and put my foot down again. And that was that.

But that’s not the worst of the problem. I’m going to be having water issues here when the thaw sets in. It’s not so bad at minus 10.5°C such as we had during the night, but the severe temperature has cracked one of the taps on the water butt. The other two taps that control the flow into the front water butt are frozen solid so I can’t cut off the supply. That means that if the front water butt defrosts before the rear one, then I’ll lose all of the water in the containers.

That’s not the only issue that I’ve had with water either. I keep a 5-litre container of water in the bedroom for all kinds of different purposes, and I’ve managed to kick that all over the floor.

And that’s not all either. After varnishing the stair treads and risers that I cut the other day, I went to emulsion the wallpaper that I’d fitted in the stairwell. The first tub of white paint that I found had varnish in it. The secpnd one had lime mortar in it. And that was that.

Luckily I had some crepi left over from when I did the walls in the cupboard under the stairs, so I applied that to the wallpaper. And when I checked the job an hour or so later, the weight of the crepi had pulled the paper off the wall. In the end, I pulled the paper off the wall and put the crepi directly on the plasterboard. And if I had done that first instead of last, this job would have been finished three days ago.

I forgot to ention that Brico Depot on Saturday was having a sale of LED light bulbs – 4.2 watts at €3:99 each which is a bargain in anyone’s money. I bought all 14 that were left and this will complete the bilbs that I need for the barn with a couple left over.I tried a couple in the barn and I wasn’t half impressed.

As you know, I’m working in the bedroom and on the ground floor at the moment so I took out the 1.2 watt LED light bulbs in each room and put the extra 4.2 light bulbs in there. And the difference is phenomenal. I can actually see what I’m doing now in there at night and that makes a change.

This was something else that I should have done ages ago.

Monday 22nd December 2014 – NO WONDER …

blocked chimney les guis virlet puy de dome france … that the fire wasn’t working properly last night. Just have a look at this little lot!

Yes, the chimney was totally blocked and the smoke had no possible way of reaching the outside, except via the door and the air vents of the stove.

I consequently dismantled all of the tubing and spent over an hour cleaning everything out. And it certainly needed it too. In places it was solidly blocked.

The upshot of this all is that the small fire that I had this evening was burnt up in half an hour and the temperature had risen from 14.2°C to … errr … 34°C, and all in half an hour too. The food tonight was cooked in seconds instead of the usual couple of hours.

All in all, it was a very worthwhile exercise, cleaning the chimney. And I’m glad that I did too, because during the night we had a severe frost, the first of the year and the temperature had dropped to minus 2°C outside (lucky that I had plenty of residual heat in here). That also meant that we had one of these Alpine winter days today – not a single cloud in the sky all day. The first day like this for ages and the batteries are now fully charged at last.

fitting stairs les guis virlet puy de dome franceI spent the rest of the working day on the floor. Not horizontally of course, although I did have my moments. I recut some of the horizontals for the stairs on the lower part of the staircase so that they are flush with the uprights of the stud walls. And I am well-impressed with the Ryobi plus one percussion screwdriver. That drove the big long screws home in no time – much better that with the normal screwdriver.

For lunch, I made some hummus again. This time with olives and tomatoes, and a bit more water and oil so that it was a little more damp than before. And it did taste good too.

After that, I fitted the riser for the lowest stair on the staircase, and then fitted the second layer of flooring behind it. Finally, I fitted the two pieces of plasterboard that go there.

Tomorrow, I’ll fill the screwheads in the plasterboards that I fitted today, sand them off and then fit the treads for the stairs. Once they are done, I can varnish the flooring in there and then I’ll have a couple of shelves for storage.

Friday 19th December 2014 – NOW, HERE’S A THING!

Yes, two projects completed in a week, and two goals achieved. That’s something of a record for me, isn’t it?

floor board landing first floor les guis virlet puy de dome franceAt knocking-off time at 18:00 this evening, I was just fastening down the last piece of boarding for the floor of the landing. Bang on cue, in fact.

it’s only the first layer, of course. There will be another layer on top of this, a layer that will run through into the bedroom through the doorway that you can see to the left. But to do that, I need to go round to Cecile’s to rescue the floorboarding that we stocked there when we were trying to make some room here.

It wasn’t particularly easy to do this part of the flooring, what with the stud wall being built on top of the old floorboarding. To remove thet, it’s necessary to drill a line of holes along the base of the stud wall, rather like perforations, chisel down as much a spossible, and then using a huge crowbar, prise up the flooring and hope that it breaks off along the perforations. Finally, chisel off the rough edges to make sure that it’s something like a neat line.

But I’m glad it’s done anyway. It’s not often that I reach my targets.

Mind you, I managed it despite a few interruptions. Sophie the boulangere was late coming round with the bread and that interrupted my work, waiting for her. To pass the time, I took all of the food out of Caliburn and stored it away. And then, somewhat later, we had an avalanche in the European Cardboard Box Mountain, and I had to refill one or two of the boxes and restack the Mountain. One or two of the items that fell out of one of the boxes were things that would have come in handy over the past few days – but that’s what usually happens, isn’t it?

After knocking off work, I went round to the Intermarche for the weekly shopping. And this turned out to be rather expensive, due to the fact that I bought a few other bits and pieces to nibble on for Christmas

i was on my travels during the night too. I was running ly taxi business again, and it seemed tht some of the things that I needed – the books about tourist sites all over the world that I had been making up, had “disappeared”. I spent ages climbing over the roof of some old Ford and Bedford Lorries during the pouring rain and the soaking cardboard boxes and old mattresses, but they were nowhere to be found. Being fed up of all of this, I ordered all of my staff to assemble on the Common at the back of the allotments. My intention was to give every last one of them the statutory notice to leave my employment.

I walked up there and on the way, I fell in with a girl with whom I went to school from age 5 to age 18. Strangely enough, this is a girl about whom I haven’t given even one moment of thought, whether at school or subsequently, so I don’t have a clue how it was that she put in an appearance.

This led on to a recurring dream that I have every now and again, one that is so real and vivid that I often wonder whether or not it ever did take place, but subsequently to my selling my business in 1989, and after the purchasers died, I ended up with a couple of Mzrk III cortinas and I started running the taxi business on the side again, everything totally unlicensed. I abandoned that after a few months, but a short while later, restarted yet again. Of course I know that this never happened, but it’s such a real dream, I’ve had it so often and it’s left such an impression on me that I do have to convince myself.