Monday 19th January 2015 – I HAD A LOVELY EARLY SUMMER’S DAY …

… working outside this morning. And I do mean early summer too because it was glorious.

First job was to empty the beichstuhl – such are the delights of my mode of living – clean it out and recharge it ready for use. Ohh the joys of low-impact living.

Next job, which took me right up to almost lunchtime was dealing with the water butts. You may recall that the tap on the front tank had cracked in the severe cold that we had the other day. Good job that I had fitted a series of isolation valves so that I can separate one tank from the other. I’ve been drawing the water off the front tank as it all slowly leaked away and by the end of last week it was finally empty.

When I was in Montlucon on Saturday, I bought everything that I needed, and so I set about dealing with the tap as well as giving the tank a good clean while I was at it. It’s a testament to the effectiveness of the system that I’ve designed and built here that aftera couple of years, the front tank wasn’t particularly dirty. It didn’t really need a clean but nevertheless I gave it a good going-over.

Then, I dealt with the tap. That was soon fitted, and not only do I have the tap but I now have an overflow as well as a depth gauge. Now I can see how much water there is in the tanks.

The tap has been insulated and I’ll need to insulate the clear plastic pipe that forms part of the depth gauge once I work out how to do this. I’ll have to give the matter some thought.

This afternoon I sanded down the floor in the bathroom, seeing as how we had plenty of sun. Tomorrow morning, I’ll vacuum up the dust, which will give me an opportunity to see how well this dust cleaner will perform, and then put the first layer of varnish on it so that it will go dry while I’m havine lunch. I’m out on Wednesday so I can put the second coat on before I leave, and the third coat as soon as I come back. I want to do this while I’m not doing any work, so that there’s no dust about to stick in the varnish.

So as well as sanding down the floor, I’ve been working on the floor on the landing. The first board is nailed in place, the trapdoor has been cut out, and the second board has been cut to shape and filed down to take the recessed hinges. If I can finish this on Thursday, then I can varnish this at the same time that I’ll be doing the stairs – namely on Saturday, Sunday and Monday.

I’m really crcking on with this place now. If I’m not very careful, it will start to look as if someone is actually living here.

Give me your opinion of this post
  • Excellent 
  • Useful 
  • Interesting 
  • Weird 
  • Surprising 
  • Boring