Tag Archives: frozen tap

Monday 19th January 2015 – I HAD A LOVELY EARLY SUMMER’S DAY …

… working outside this morning. And I do mean early summer too because it was glorious.

First job was to empty the beichstuhl – such are the delights of my mode of living – clean it out and recharge it ready for use. Ohh the joys of low-impact living.

Next job, which took me right up to almost lunchtime was dealing with the water butts. You may recall that the tap on the front tank had cracked in the severe cold that we had the other day. Good job that I had fitted a series of isolation valves so that I can separate one tank from the other. I’ve been drawing the water off the front tank as it all slowly leaked away and by the end of last week it was finally empty.

When I was in Montlucon on Saturday, I bought everything that I needed, and so I set about dealing with the tap as well as giving the tank a good clean while I was at it. It’s a testament to the effectiveness of the system that I’ve designed and built here that aftera couple of years, the front tank wasn’t particularly dirty. It didn’t really need a clean but nevertheless I gave it a good going-over.

Then, I dealt with the tap. That was soon fitted, and not only do I have the tap but I now have an overflow as well as a depth gauge. Now I can see how much water there is in the tanks.

The tap has been insulated and I’ll need to insulate the clear plastic pipe that forms part of the depth gauge once I work out how to do this. I’ll have to give the matter some thought.

This afternoon I sanded down the floor in the bathroom, seeing as how we had plenty of sun. Tomorrow morning, I’ll vacuum up the dust, which will give me an opportunity to see how well this dust cleaner will perform, and then put the first layer of varnish on it so that it will go dry while I’m havine lunch. I’m out on Wednesday so I can put the second coat on before I leave, and the third coat as soon as I come back. I want to do this while I’m not doing any work, so that there’s no dust about to stick in the varnish.

So as well as sanding down the floor, I’ve been working on the floor on the landing. The first board is nailed in place, the trapdoor has been cut out, and the second board has been cut to shape and filed down to take the recessed hinges. If I can finish this on Thursday, then I can varnish this at the same time that I’ll be doing the stairs – namely on Saturday, Sunday and Monday.

I’m really crcking on with this place now. If I’m not very careful, it will start to look as if someone is actually living here.

Tuesday 13th January 2015 – D’OHHHH!

It’s mystified me for quite a while – the subject of the wind turbine on the side of the house.

You may recall that just before I went to Canada in August I was up on the scaffolding at the front of the house tidying up all of the wiring and one of the things that I tidied up was the wiring to the Wind Turbine. I also fitted a charge controller, a timer and a data panel.

Returning from Canada after 7 weeks away, I was expecting to see a significant reading on the data panel and the timer, and no-one was more astonished than I was to see not a thing. That really confused me greatly.

I didn’t give it much thought after that, being preoccupied with other things, but I did notice while I was up on the scaffolding getting some tools the other day that there were two wires danging down from underneath the junction box. The thought immediately went through my mind that I must have forgotten to connect them up, and that was the explanation for nothing happening.

Today, with 20 minutes to spare before lunch and having promised to deal with a few odd jobs today, and especially with the I went up onto the scaffolding to connect up the wires.

Prising off the top of the junction box, I noticed that these two loose wites were supposed to be loose – they are the wires that will be connecting the third bank of solar panels in due course, and the wires connecting the wind turbine were properly connected up. At least, that’s what I thought at first, but closer inspection revealed nothing of the kind.

Don’t ask me what goes through my mind at certain moments, or whatever I must have been doing at the time, but somehow, despite the clearest indications and a great deal of effort being put into colour coding and all that kind of thing, I somehow managed to connect up the positive lead to the negative feed, and vice versa.

I stood and stared at this for about 10 minutes open-mouthed, and then disconnected everything and reconnected everything correctly. And almost immediately, the green power light that I had fixed into the junction box came on. Since then, I’ve had the old familiar sound of the wind turbine murmuring away in the background.

I really don’t understand what goes on in my mind sometimes, but it’s worrying.

During the night I’d been on my travels around the Holmes Chapel area of Cheshire, in XCL, my red Ford Cortina Mark 5 estate that lives in a lock-up in Montaigut, and I was up comparatively early this morning.

After breakfast I came across another “d’ohhhh!” moment too. It seems that I was premature in declaring that the wallpapering had finished. I’d missed a bit and so I had to deal with that first. Once that was done I had to vacuum up the dust on the stairs (I’m enjoying this soot sucker that I’ve converted into a vacuum cleaner) and then mask everywhere off. That took most of the rest of the morning.

After lunch I collected up a pile of wood, did some tidying up and tool collecting, and then in the last hour or so started work on the shower room floor. THat’s now all cut to size and ready for nailing down, sanding off and varnishing now.

Remember what I said yesterday about knocking off? Well, here I was at 18:00 with the floor only half-done, but regardless, I carried on working until it was finished off.

And in the water butt, following on the fractured tap there, the front water butt is now empty and ready for cleaning and a new tap fitting. But of course I don’t have a new tap (I should have bought one on Saturday, shouldn’t I?) so it’s a good job that I drew off those couple of buckets of water for a reserve supply

Tuesday 30th December 2014 – WELL, THAT WAS A WASTE OF TIME.

Remember yesterday when I was busy putting that piece of wood in to fill that unexplained gap in the woodwork and ended up falling down the stairs?

This morning I started to fit the plasterboard into position, and after a good hour or so at the cutting, measuring and fitting, and also fitting in some bracing which was unaccountably absent, the light suddenly went on in my head. Yes, where is the insulation in the wall?

Off came all of the plasterboard that I had cut and shaped, and off came the bracing that I had fitted, and on went 40mm of polystyrene insulation. And now I can see why there was that unexplained gap – it was for passing the insulation through and out behind the stairs. Still, it’s too late to do much about that now.

Before I had started on the plasterboard, I had taken the masking off the floor under the stairs on the landing, and put the first coating of varnish on there. I’d put the second coat on and fitted the stairs too. So that’s another job out of the way.

I’ve even had a bit of good luck too. Aeons ago, when I lived in Brussels, I bought a pack of 100mm wide 25mm thick planed wood planks to make some shelves, but I never used it. I discovered two of the planks and tried them as end-stops for the plasterboard stud walls. They seem to be perfect for this job and so tomorrow I’ll have a go at fitting tham.

I’ve also rerouted a pile of wiring so that it will run under the false ceiling on the landing and then down with all of the other wiring between the stud wall that has the shower room on one side and the head of the stairs on the other side, and I can’t think why I didn’t do this ages ago.

As for the water issues, the front tap thawed out slightly today and the leak isn’t anything like serious. It’s losing about half a litre every hour, but more when the tap is open. The rear tap is still frozen up so I can’t isolate the front tank.

Mind you, the frozen tap is doing that so it’s the same thing really, and as for the leak, the front tank needs to be emptied anyway so that I can change the tap so it’s neither here nor there. I’ve emptied 40 litres out of it today into various containers and I’ll keep on doing that for now until the weather warms up and I can isolate the front tank.

Monday 29th December 2014 – OUCH!!!

Yes, I fell down the stairs today.

I was at the top of the stairs fixing in a piece of wood into the corner at the back of the upper stairs and I had to reach right across the stairwell to screw it in. And then I forgot that I was reaching right across a void and put my foot down again. And that was that.

But that’s not the worst of the problem. I’m going to be having water issues here when the thaw sets in. It’s not so bad at minus 10.5°C such as we had during the night, but the severe temperature has cracked one of the taps on the water butt. The other two taps that control the flow into the front water butt are frozen solid so I can’t cut off the supply. That means that if the front water butt defrosts before the rear one, then I’ll lose all of the water in the containers.

That’s not the only issue that I’ve had with water either. I keep a 5-litre container of water in the bedroom for all kinds of different purposes, and I’ve managed to kick that all over the floor.

And that’s not all either. After varnishing the stair treads and risers that I cut the other day, I went to emulsion the wallpaper that I’d fitted in the stairwell. The first tub of white paint that I found had varnish in it. The secpnd one had lime mortar in it. And that was that.

Luckily I had some crepi left over from when I did the walls in the cupboard under the stairs, so I applied that to the wallpaper. And when I checked the job an hour or so later, the weight of the crepi had pulled the paper off the wall. In the end, I pulled the paper off the wall and put the crepi directly on the plasterboard. And if I had done that first instead of last, this job would have been finished three days ago.

I forgot to ention that Brico Depot on Saturday was having a sale of LED light bulbs – 4.2 watts at €3:99 each which is a bargain in anyone’s money. I bought all 14 that were left and this will complete the bilbs that I need for the barn with a couple left over.I tried a couple in the barn and I wasn’t half impressed.

As you know, I’m working in the bedroom and on the ground floor at the moment so I took out the 1.2 watt LED light bulbs in each room and put the extra 4.2 light bulbs in there. And the difference is phenomenal. I can actually see what I’m doing now in there at night and that makes a change.

This was something else that I should have done ages ago.