… about having loads of sun so that I could sand down the floor of the shower room, then I woke up this morning to a hanging cloud. I suppose that that was odds-on, wasn’t it?

So having put the kybosh on the sanding, first thing this morning was to put the second coat of wood treatment on the old exposed beams. That didn’t take too long, From there, I attacked the floor on the landing on the first floor.

And cutting the first floorboard took almost all of the morning. It needed three lets cut in it so that it could fit around the verticals, and they had to be cut pretty precisely. Once that had been done, I had to cut a couple of countersinks into it so that the hinges that fit into it will be flush with the surface.

go on table saw bricomarche commentry les guis virlet puy de dome franceI needed to cut some floorboarding planks into 50mm lengths to make a framework for the trapdoor, and so despite the absence of electricity I decided to put the new table saw to use.

As I suspected, it is a cheap rubbishy thing (as I suspected) but it did the job well enough once I’d worked out how to fit the guide rail. But in news that will surprise most people, but not the more cynical amongst us, the built-in measure is reading 4mm short. Good job I measure up after I cut the first one, isn’t it?

After lunch, I filed down the offcuts that I had cut so that they made a neat line, and then went off to look at the painting. My masking isn’t up to much, it seems, as I have plenty of white spaces where the masking tpe prevented the wallpaper from reching, and also some of the wood treatment on the old beams has filtered down behind the tape. I’ll have some touching up to do on Monday.

Last job tonight was to cut the second “long” plant to size. That needed trimming off and a couple of lets cut into it to fit around the verticals. That’s now done and so on Monday, another thing that I can be doing is to cut out the trap door in the lower layer of floorboards. Whnen that’s done, I can fit the last two sheets of plasterboard on the studding on the landing, and then cut out the trap on the upper layer of floorboards.