Tag Archives: painting stairwell

Friday 30th January 2015 – NOW HERE’S A THING!

I was still working until after 20:00 this evening. And if that isn’t surprising enough, I’d already knocked off once and been down to Pionsat to do my shopping in the Intermarche, and then come back to carry pn working.

Mind you, this morning I thought that my muck was in. I was up quite early this morning and the sky was looking quite nice and blue. “At long last” I reckoned, “this would be the day where I could sand down the stairs, vacuum then and then varnish them”.

But it wasn’t to be.

I’d finished breakfast by 08:30 and so I set about doing a radio programme. By 10:00 I’d done the next month’s rock programme, including editing an hour-long live show. I must have been in a good mood.

However by this time, the weather had changed dramatically, and for the worse too. It was snowing quite heavily and all of the light had gone.

First thing that I did was to touch up the painting around the shelves. A bit of varnish had splashed here and there and I may as well have the place looking all shipshape.

recessed 12 volt LED light landing false ceiling les guis virlet puy de dome franceOnce I’d finished that, I set to on the end pieces for the plasterboard runs. And by 17:00 this evening every single piece was properly shaped, in position and nailed in place.

I’d even made the door frame for the bedroom, as you can see, and you’ll also notice the recessed light in the false ceiling on the landing.

Even though I say it myself, I’m really impressed with all of this, and no-one will ever notice that most of the end pieces and most of the door frame have been made from cut-down floorboard planks. It’s amazing what you can conjure up when you are driven by necessity.

There was still the filling to be done and so seeing that I was in such a good mood I pressed on. It was in the middle of all of this that I knocked off and went down to the Intermarché.

It’s now finished – or at least the first layer is, and i’ll sand it down at the first opportunity ready for the second layer.

For tea tonight I pushed the boat out and had oven chips, real baked beans and a veggie burger, all doused in proper malt vinegar.

And it was beautiful too.

Thursday 15th January 2014 – I’VE FINISHED …

… the painting of the walls in the stairwell today. And I’m glad that I put a second coat of paint on the walls as they certainly needed it – when it was dry, the first coat didn’t look as well as it had looked when I was doing it.

As the colour dried out, it went darker. Consequently I tipped another litre of white paint into the 3 litres of blue paint that was left over and the paint mixer attachment that I fit into the Ryobi Plus One drill mixed it all up quite a treat. I shall be doing a little more of this paint mixing now that I know that it works.

This afternoon I started to strip off the superfluous masking and I must admit that it looks quite nice, especially the contrast between the blue paint and the wooden ceiling and window surrounds. Mind you, the removal of the masking took longer tha I expected.

Once I’d done that, I had to remask around the roof beams that are visible, and I put the first coat of dark brown wood treatment on there. The second coat will go on tomorrow morning first thing.

Finally, I cut down to size the piece of wood that I’ll be using as the end stop of the shower room floor that fits under the door. That is now fitted into place now, ready for me to start tomorrow on fitting the floor on the landing (unless we have plenty of sun in which wase I’ll be sanding down the shower room floor ready for varnishing.

Wednesday 14th January 2015 – WELL, HERE YOU ARE THEN.

painted stairwell attic les guis virlet puy de dome franceThe stairwell, all painted a nice blue.

It wasn’t going to be as nice as this though, because the paint was a lot darker than indicated on the tin and I didn’t fancy that idea too much. So into the can went a litre of white paint and that lightened it up a little.

And it was a good job that I did that too, because there wouldn’t otherwise be enough to do a second coat, which is what I’m going to be doing tomorrow. And it needs it too because I’ve been doing it with a brush and it doesn’t go on particularly thoroughly.

painted stairwell attic les guis virlet puy de dome franceIt took ages to do too, and it was long after 14:00 when I knocked off for lunch – more like 15:00 in fact, but I wasn’t going to stop work until I had finished the painting.

After my very late lunch I tidied up again and then carried on with the floor in the shower room. That is now all down and fitted in position, apart from the end block which will go under where the door will be.

For tea, I found an old tin of curried mixed beans and so I fried some onions, garlic and potatoes in olive oil and spices, and then added the tin of curried beans and a large tin of vegetables. Now there’s enough there for a good few days and that suits me fine.

For tomorrow after the second coat of paint, I’ll be cleaning up the exposed woodwork of the beams and rafters and painting it in the dark brown wood preservative. Once that is done, I’m going to go for it and start on fitting the door for the shower room. At least if I can do the door frame that will be a great advance.

I’ve worked out that I need three clear days to varnish the stairs and leave each coat to dry before I walk on it. If I go to the shops in Montlucon a week on Saturday, we’re rehearsing the radio programmes on the Sunday and then recording on Monday, then it looks like I have almost a week and a half to do as much of the flooring and woodwork that I can and sand everything down ready to start the varnishing on the Saturday before I head off to Montlucon.

That sounds like a good plan.