Thursday 12th February 2015 – I HAD A LATE START …

… today. I had about 10 minutes spare before I needed to start work qo I started on something really quick – and it was 11:10 by the time I finished.

But never mind – I still managed to accomplish everything that I had planned for today, and even found time to draw up a list of tasks to do before the bedroom can be called finished. There’s 15 on the list (and I’ve just thought of one more too) but I’ve already completed one of them so it’s not too bad.

First thing today was to sand off all of the remaining filler in the joints of the plasterboard. And now, of course, I look like a snowman … "snowPERSON" – ed. Once that had been done, I could put the second coat of paint on the landing wall. I still don’t like the colour but it went on good and thick and at 20:00 it was still wet.It’s going to take a while today.

This afternoon I had to fetch in a pile of wood as I’ve run out, and then I set to work on the second layer of filler on the plasterboard joints on the wall in the bedroom. It ddin’t take too much either – I must be getting good at this. Finally, I took off all of the masking on the landing and now I can get into the cupboard there and start putting stuff away.

I didn’t know what to make for tea tonight but just messing around aimlessly with a few bits and pieces here and rhere and I ended up with another mega-meal – this time of potato and lentil. It was nice, but it would have been even nicer had I had some onions handy, and there’s enough for four meals. So that’s problem solved until next week.

Tomorrow, I’ll be sanding down the second lot of filler, but then nothing’s going to happen to that for a while so I can leave it at that. I’ll also be emptying the wardrobe and painting that with crepi, ready to start fitting the shelves. I’m intrigued to see how far I can reach tomorrow.

Wednesday 11th February 2015 – THIS MUST BE SOMETHING OF A RECORD

Today, I had a massive 169 amp-hours of excess solar energy and the water temperature in the home-made 12-volt immersion heater that I use as a dump load went off the scale (ie more than 70°C). There has never been that much surplus solar energy in the month of February – in fact we would not find too many days in July and August where we would have more than that.

That gives you some idea of what today wad like. The temperature outside reached 15.1°C and this was the first day for I don’t know how long when the temperature in my attic rose during the day rather than fell.

The increase in temperature prompted me into action and first job that I tackled was to paint the landing. But that wasn’t how it panned out, as I dropped my pliers into the 8 litres of white paint. They will be nice and pretty when I finally get down to the bottom of the tub and can fish them out. But that’s not going to be for a while yet.

landing painted yellow les guis virlet puy de dome franceSo here we are. You can’t really see things very well in the landing, but here’s the first coat of yellow paint on the wall. This is basically 8 litres of white emulsion and a tube of yellow paint pigment.

It’s not brilliant, but it will look much better tomorrow after I have done the second coat. And I don’t really like the colour – it’s come out much darker than I was expecting and much darker than what I wanted.

But never mind. it’s on and it’s staying on.

osb wall wardrobe s les guis virlet puy de dome franceAfter lunch, I started on the second piece of OSB for the end wall of the wardrobe. That eventually went into place with a little bit of manoeuvring and fine adjustment, and it won’t be coming out again.

It’s a different colour than the rest, due to the fact that I didn’t have enough OSB in the house and had to go outside and scrounge a piece that I had been using as part of the false floor in Caliburn. But as it’s being coated in crepi, it won’t make much of a difference.

This afternoon, after a few other bits and pieces that I had to do, I made use of the surplus solar energy and started to sand down the plasterboard. That took ages and I’ve only done about half of it, but the sandpaper on the sander split itself, at exactly 18:05, and I took that as being the signal to knock off for the day.

And those falafel balls and oven chips for tea were delicious again.