… still isn’t resolved, despite my best efforts this morning.
This morning, I was up quite early and I’d finished my breakfast by 08:30. Se seeing as I had to be in Marcillat for 10:30, a sudden idea entered into my head given the time available, and I shot straight off to Commentry and Bricomarche.
There are indeed right-handed and left-handed hinges, and all of the hinges were totally muddled up. I very carefully sorted out three right-handed hinges (as well as a hosepipe connection for the overflow on the water tank). However, the boxes were more mixed up than I thought, and I’ve ended up with 2 x 110×55 and 1 x 90×45.
Ahh well.
But at least I have the shape to use to cut the lets into the door and the doorframe.
At the radio, we recorded our Radio Anglais programmes for Radio Tartasse and then went for a coffee and a chat.
Back here, first job that I did even before I took off my coat was to put the third and final coat of varnish onto the shelves in the stairwell up to the attic.
These shelves are now finished and that is really the first completed task of this phase of the work. These shelves mean that I can now start to empty the attic of all of the cooking stuff, the pots and pans and so on, and put them on the shelves outside, as soon as the varnish had hardened off.
This is definitely progress.
Second job that I did, likewise before taking off my coat, was to fit the crown onto the LED light bulb and recess it into the hole in the false ceiling on the landing.
You can see the varnished ceiling and the plasterboard on both the walls but the light hasn’t come out well enough. I’ll take another photo of the ceiling when we have some daylight, but that wasn’t going to be today as so far we’ve had 35mm of rain and it’s still teeming down.
I’ve also cut the three lets into the hinge side of the doorframe so that I can fit the recessed hinges in due course and I’ve also cut down a floorboard to make the latch side of the doorframe.
Tomorrow I’ll finish off cutting down the floorboards for the rest of the door frame and for the head of the stairs, and if I’m lucky, I might even be able to put the first coat of filler on the screwheads and joins in the plasterboard.