Saturday 25th July 2015 – AND IF YOU THOUGHT …

… that working late on a Friday night was exceptional, how about working on a Saturday morning too? Yes, I reckon that I didn’t even have 12 hours off.

shelob shower room les guis virlet puy de dome franceAnd I wasn’t alone while I was working either. I had company – or, rather, an interested spectator.

I don’t know where Shelob came from, or where she went back to, but she was certainly there while I was sweating away. And to be honest, I don’t think that I’ve ever seen a spider quite like this one before. The photo makes it look huge, but nevertheless …

suspended ceiling fitted varnished recessed lights fitted les guis virlet puy de dome franceAnd I was there for a good couple of hours too this morning.

But now we have all three coats of varnish on the doors and on the shelves and it does look good in there. And all of the wiring is finished and the recessed LED lights are in place. And wasn’t it a good plan to buy that pile of recessed light fittings at Brico Depot? That works in spades, doesn’t it?

And you’ll see the LED striplight on the far wall. The bathroom mirror will be going under there when the tiling is finished. And that’s the next job, starting on Monday when I’ve done this car that I have to do.

Just as I was settling down, Lieneke came round for a chat and she stayed here for a good few hours. She was really impressed with the work on the house too – and so am I, it has to be said. It’s looking quite good so far.

But that diverted my attention and I’ve not done anything after that – just relaxed. Tomorrow, I need to press on with the radio programmes.

Friday 24th July 2015 – WHEN WAS THE LAST TIME …

… that you heard of me working at 21:10 in the evening? I might have done at one time, I think, but I didn’t make a note of it, so this time might well be the first official occasion.

And not only that, I’d been to do my shopping at St Eloy in between too, so that’s something of a rarity too.

This morning I managed to tie with the alarm going off and then after breakfast I had a nice uninterrupted morning on the laptop sorting out another pile of previous blog entries. If I crack on doing four or five each day, I can finish the Canada 2010 and do Canada 2011 before I go away – at least, that’s my aim.

After lunch, I finished off all of the masking, dismantled everything that needed dismantling and then put on the first coat of varnish. It was then 18:00 and the drying time for a second coat is 2 hours. Thus I leapt into Caliburn and headed off to St Eloy in order to do my shopping.

Back here by 19:30 and I had to wait for another 45 minutes or so, and then I put the second coat of clear varnish on the wood. And when I’d finally finished that, I could knock off and have tea.

Tomorrow after breakfast, I’ll do the third and final coat and while that’s drying I can carry on with the blog. And when the varnish is finally dry, I can fit the recessed lights and reassemble the ironmongery.

That will mean that, in between dealing with this car that’s coming here on Monday, I can make a start on the tiling.

Wednesday 28th January 2015 – THIS LANDING DEFINITELY …

… won’t be finished by the weekend now, that’s for sure.

I didn’t realise this at the time, but now I do, that the “drop-in” hinges that are quite common here and that I like to use are “handed”. I need three right-handed ones for the bedroom door and three right-handed ones for the shower room door, but I seem to have acquired six left-handed hinges.

I can’t believe this, because I’ve fitted three doors here, some right-handed and some left-handed, and I’ve always managed to find the xorrect hinges without even knowing about it. Talk about beginners’ luck. But now I’ll have to wait until I can go either to Montlucon or Commentry.

This morning though, I fitted the ceiling in the landing and cut out the hole for the recessed light that I’ll be fitting. All of this took a while but it’s finished now and doesn’t look too bad at all.

We had a flash of sunlight too for half an hour, so I sanded down and vacuumed the shelves over the stairs, and then put the first coat of varnish on them and also on the landing celling. That all took me until 14:20 – a good 20 minutes after my normal lunchtime pause,but I’m less interested in pausing than I am in doing the work on the place.

After lunch I went into the barn to find the doors for the bedroom and the shower room and then cut down one of the planks that I’ll be using for an end-piece for the stud wall. And it was here that I discovered the issue with the hinges.

Never mind though, there’s still plenty to do. I ended up finishing off the routing for the wiring on the first floor (although I’ve since remembered two things that I’ve missed) and then put the second coat of varnish on the shelves and ceiling.

Tomorrow I have to nip to Marcillat and record the Radio Tartasse radio sessions, and when I come back I’ll be putting the third coat of varnish on the shelves and fitting the recessed light on the landing.

And until I can sort out some hinges for the doors, I’ll be fitting as many end pieces as I can and then starting on the bedroom. No reason to stop working just because I’ve messed up these hinges.