Friday 6th March 2015 – I DIDN’T GET …

… as much done today as I was hoping for – but then again, isn’t this the story of this blasted wardrobe?

Mind you, I have an excuse for at least part of it. Round about 14:30 I noticed that the temperature in the verandah was 26°C. Not only that, the water in the home-made 12-volt immersion heater that I use as a dump load for the excess solar energy had gone up to more than 70°C but there was no room in the tank to put some cold water to cool it down, so I needed to take some out.

This can only mean one thing. And yes, the shower that I had was gorgeous.

Standing in the verandah pouring water all over me out of a jug might not seem like very much to you, but it’s the first shower of the year here so it’s significant in that respect and, of course, it’s all my own work.

And it’s the earliest shower of the year since I’ve been here (that was 2007 when I came to live here) and it’s a sure sign that the warm weather is here. In the height of summer I can have showers every day, and how I look forward to that.

In fact, today we had 207 amp-hours of surplus solar energy. That gives you some idea of how good the weather has been. What I’ve done therefore is to plug the fridge into the permanent circuit so that it runs through the night. Normally the fridge runs on the overcharge circuit so that it only runs when the batteries are fully charged (except in summer when I run it 24 hours per day) but I need to put a little bit of strain on the batteries. This is the earliest that I’ve had the fridge going through the night.

wardrobe door bedroom les guis virlet puy de dome franceReturning to our moutons, first job in the bedroom this morning was to trim off all of the doors on the upper row. I’d marked them off yesterday so it didn’t take all that long, but I ended up doing the bottom of one of the doors as well because the rest of it ended up looking so good.

I’ve started on the upper fascia panel too – making it out of the cut-off ends of floorboards mounted vertically, so I had to go a-scavenging around the bedroom for the offcuts. The chop saw is excellent though for the cutting.

However, here’s a design fault or two with the machine. A built-in measure would help enormously, as well as an end-stop which you can set in order to cut constanr lengths. I had to invent something for this.

I’m not very happy with this though. Each piece has to be shaped individually once it’s been cut, and some of these shapes around the exposed beams are quite complicated. For one section, I had to cut three different pieces before I was satisfied.

But that’s half-done now and it might take another half-day to finish. And I’ll be glad when it’s done too. I can then crack on with the rest of the bedroom

I finished off tonight by going down to Pionsat and the Intermarche for the shopping. THis means that I have Saturday free. And I’m pleased that I don’t have to go to Montlucon tomorrow for bits and pieces.

Give me your opinion of this post
  • Excellent 
  • Useful 
  • Interesting 
  • Weird 
  • Surprising 
  • Boring