Friday 6th March 2015 – I DIDN’T GET …

… as much done today as I was hoping for – but then again, isn’t this the story of this blasted wardrobe?

Mind you, I have an excuse for at least part of it. Round about 14:30 I noticed that the temperature in the verandah was 26°C. Not only that, the water in the home-made 12-volt immersion heater that I use as a dump load for the excess solar energy had gone up to more than 70°C but there was no room in the tank to put some cold water to cool it down, so I needed to take some out.

This can only mean one thing. And yes, the shower that I had was gorgeous.

Standing in the verandah pouring water all over me out of a jug might not seem like very much to you, but it’s the first shower of the year here so it’s significant in that respect and, of course, it’s all my own work.

And it’s the earliest shower of the year since I’ve been here (that was 2007 when I came to live here) and it’s a sure sign that the warm weather is here. In the height of summer I can have showers every day, and how I look forward to that.

In fact, today we had 207 amp-hours of surplus solar energy. That gives you some idea of how good the weather has been. What I’ve done therefore is to plug the fridge into the permanent circuit so that it runs through the night. Normally the fridge runs on the overcharge circuit so that it only runs when the batteries are fully charged (except in summer when I run it 24 hours per day) but I need to put a little bit of strain on the batteries. This is the earliest that I’ve had the fridge going through the night.

wardrobe door bedroom les guis virlet puy de dome franceReturning to our moutons, first job in the bedroom this morning was to trim off all of the doors on the upper row. I’d marked them off yesterday so it didn’t take all that long, but I ended up doing the bottom of one of the doors as well because the rest of it ended up looking so good.

I’ve started on the upper fascia panel too – making it out of the cut-off ends of floorboards mounted vertically, so I had to go a-scavenging around the bedroom for the offcuts. The chop saw is excellent though for the cutting.

However, here’s a design fault or two with the machine. A built-in measure would help enormously, as well as an end-stop which you can set in order to cut constanr lengths. I had to invent something for this.

I’m not very happy with this though. Each piece has to be shaped individually once it’s been cut, and some of these shapes around the exposed beams are quite complicated. For one section, I had to cut three different pieces before I was satisfied.

But that’s half-done now and it might take another half-day to finish. And I’ll be glad when it’s done too. I can then crack on with the rest of the bedroom

I finished off tonight by going down to Pionsat and the Intermarche for the shopping. THis means that I have Saturday free. And I’m pleased that I don’t have to go to Montlucon tomorrow for bits and pieces.

Thursday 5th March 2015 – I DIDN’T QUITE MANAGE …

… to complete as much as I intended to do on the wardrobe today. I had the usual issues of working hard but making not much progress.

It took all morning to hang the two doors that I had made yesterday. Mind you, I spent some of the time having a good search around looking to see if I had any hinges lying around anywhere. I eventually found three in the barn. I must have bought those for some long-forgotten project, but they weren’t much good as they were left-hand hinges and too big in any case.

However I did find half a hinge in the house and this made a pair (or at least it will do when I find the other half) with a hinge that I had already, so I could at least do that. It also means that I don’t have to go on a shopping expedition to Montlucon on Saturday.

final door for wardrobe bedroom les guis virlet puy de dome franceAfter lunch, I made the final door and for a change, I had a play with the cheap chop-saw that I bought agesa couple of years ago in the sales at Cheze in St Eloy-les-Mines. This did an excellent job, although it needs two cuts to cut the width of a floorboard (which is annoying) but never mind. I’ll be doing the floorboards with this.

While I was on my travels around, I tried to see if I could find the Ryobi portable router that I bought in the USA in 2012 but I’ve no idea where that might be. Not a trace.

The final door needed trimming down but once I’d done that it was quite a good fit and it’s all come out quite well.

all of the doors need trimming off of course, so I measured everything up ready to cut them down tomorrow. That ook me nicely up to 18:30 when I called it a day

During the night I was on my travels again, back in Crewe. We were living back in Davenport Avenue and there was quite a crowd of us there. We all had cars and the place was totally cluttered up with vehicles. Anyway, I went on the bus up Gresty Road and South Street and the bus turned right into Nantwich Road, towards the station. I realised that I should have alighted at the corner so I urgently rang the bell. The driver went to stop but of course there’s nowhere along there to stop (the bus was clearly driving on the right-hand side of the road) so the driver said that he would swing round into Pedley Street and come back round into Nantwich Road to drop me off. I told him not to bother as I was going to Pedley Street anyway, so I alighted then and there and went to a house where I cooked my pizza and chips. I somehow managed to burn my chips although my pizza wasn’t anything like nearly cooked. So I abandoned my tea that and went outside where I bumped into my friend Mandy, and we had quite a chat about the good old days.

Wednesday 4th March 2015 – I WAS ON MY TRAVELS …

… during the night. At the wheel of a holiday coach going somewhere with a load of passengers. And to my surprise, there was a family (mum, dad and girl) from around here on board coming with me. Small world, isn’t it? I wonder why they were there.

And when I woke up it was dark. Not that it was early, but it was snowing like crazy. And throughout the day we had a mixture of sunlight followed by heavy snow flurries and back to sunshine again. And this was how it kept up. The temperature plummeted too and by teatime we were at freezing point. So much for the beautiful Spring weather of yesterday.

wardrobe doors bedroom les guis virlet puy de dome franceI spent most of the working day in the bedroom, as you might expect. And by the time lunchtime came round, I’d done the bracing for the two doors that I had cut yesterday, cut the lets in the doors and the framework for the hinges, hung the doors, fitted the handles and then the magnetic catches.

That took me nicely up to lunchtime so I cleared off for my buttied and coffee, and some more work on the website

Back at work this afternoon, I cut town the rest of the planking that I had made yesterday so that I had a strip for the doors on the other side of the wardrobe. I cut the two doors out of that and then cut them to size, and then cut the lets in the framework for hinges for the the right-hand door.

Thats as far as I reached today, as this was about 18:40 when I reached this point so I called it a day.

Up here, the temperature had fallen to 14.8°C – not all that cold but I may as well light a fire to cook my tea rather than use the gas.

So tomorrow, I’ll be hanging the two doors that I have cut and then cutting the final door. If I can do that, then I can apply the first coat of varnish on the inside before I knock off. THat will mean that it will dry through the night and won’t pick up any dust.

And won’t that be progress?

Tuesday 3rd March 2015 – I HAD A GOOD DAY …

… at work today, for a change. Although, as usual, you wouldn’t really notice.

I was up early enough and after breakfast had a good crack on at the laptop. As well as the Radio Anglais programmes, I’ve restarted work on my website again. I’ve done almost nothing on it during the winter but now Spring is here and it’s time to come out of hibernation and get a wiggle on

upper doors fitted wardrobe bedroom les guis virlet puy de dome franceIn the bedroom I spent some of the morning finishing off the second door on the upper part of the wardrobe, cutting out the lets for the hinges and fitting them, and then fitting the door handle and the magnetic catch. Once I’d done all of that, I could hang the door.

And then take the door off, file down part of the edges so that it would fit better and then rehang it.

Off to Caliburn next, to fetch another pack of floorboarding and bring that upstairs. Then I could make up a board out of seven planks, ready to cut down to make doors 3,4,5 and 6.

After lunch, I cut two strips 770mm wide out of the board that I had made. 770mm is the height of the upper doors (give or take a millimetre or two) and these two strips will form the four doors that I mentioned just now.

One of the strips I cut down to make two doors of exactly the right width for doors 3 and 4, and then fitted the reinforcing battens. I had to cut down some wood for the battens, and the table saw that I bought in Commentry a couple of months ago did the job expertly. In fact, I was running the electricity and power tools today (the circular saw, the belt sander and the table saw) until 18:40 today without significantly draining the batteries and I’m well pleased with that.

So now the two doors are ready to be hung tomorrow morning, and then I can crack on with cutting down doors 5 and 6. When they are done, there will be just door 7 to fit, and then the upper fascia panels and then I can varnish the wardrobe.

Tonight, I didn’t light a fire. 17.8°C in the attic it was, which was impressive for this time of year. I cooked tea on the single burner camping stove that I use for making coffee and as well as working perfectly (a good plan making these huge curries and packing them into individual portions – they don’t take much heating) it warmed up the place by 1°C.

On the subject of electricity, I noticed that at one stage we were having 42 amp-hours of surplus electricity. It didn’t last long but it pumped uop the heat in the home-made 12-volt immersion heater that I use as a dump load.

Monday 2nd March 2015 – I DIDN’T GET …

… as much done as I wanted to today – but then I had quite an interruption round about lunchtime.

I struggled to get out of bed this morning, but nevertheless I cracked on with my stuff about Algeria and managed to finish that, at least, even though I was late going down to work.

I managed to fit all of the framework for the upper doors, although one piece had to be recut after it split while I was malleting it into position. All of that took much longer than I anticipated, due mainly to my having to cut a couple more fascia pieces as the ones that I had set aside were not strong enough.

Once that had been done, I went out to fetch a pile of floorboards from Caliburn and then made the first of the upper doors.

But this was when I noticed the smell of burning.

We had a brief patch of sun today and I ended up with 45 amp-hours of power going down the cables to the home-made 12-volt immersion heater. It seems that the connector on the positive cable wasn’t up to that and the connection was arcing out. I ended up having to cut it off, fit a new connector, cut off the insulation and then solder it using the new gas soldering gun that Terry bought me for Christmas.

My soldering is total rubbish as you know, but it has to be better than my crimping, so it seems. and it was then that I noticed that the thread appears to be stripped in the heater element. I had to remove the screw and do my best with a nut and bolt, but that’s not looking so good and I’m going to have to deal with this.

All in all, I ended up having lunch at about 16:30.

Back at work I carried on until 19:00. All of the hinges are in place but the door needs trimming down. That’s not the kind of thing that you can do when you are tired and so I’ll be dealing with that first thing tomorrow.

Thursday 26th February 2015 – I WAS UP …

… early this morning. However this was not due to any urgent desire to get to work. I knew that I shouldn’t have finished off that bottle of pop before I went to bed.

That gave me an hour or so before starting work and so I made a start on the next month’s issue of radio programmes. I might as well put this time to good use. I made quite a bit of progress too but like anything else, there’s never enough time to do anything.

I had a good day at work today. First job was to take that sheet of floorboarding that I had made up yesterday and cut off one of the doors for the wardrobe.

Once that had been done, it needed the diagonal bracing and the door handle fitting, and then I had to organise the hinges on the door and on the frame. With that done, I could hang the door. And while it needs a little sanding where it’s tight on the frame , it’s quite a good fit.

Next task was to cut down the remaider of the sheet of floorboarding to make the second door. And then to repeat all of the above procedure as on the first door and hang that.

That was a good fit too except once more, a little tight on the frame (but sanding will take care of that of course).

However, the width was about 2mm out but I was able to deal with that by undoing the bracing, using a large sash clamp to pull the floor boards closer together and then te-attaching the bracing. That way, I recovered the 2mm that I needed and the widths are perfect, which is certainly impressing me.

two pairs of doors on wardrobe bedroom les guis virlet puy de dome franceOnce the bolt had been fitted on one of the door and the lock and magnetic catch fitted to the second door, then we now have two pairs of doors on the wardrobe and this is starting to look serious.

Knocking off for lunch 15 minutes late and knocking off for the evening 45 minutes late – you can see just how much time and effort that I’m putting into this bedroom. I don’t understand why it’s not progressing much quicker than it is. That’s something of a complete mystery to me.

Tomorrow, I’ll be fitting the shelving brackets and then cutting the shelves to fit. That is, provided that we have some sun. Today, we were bathed in a hanging cloud all day, solar energy was nominal and the batteries didn’t half creak when I was running the circular saw. We need a good day pretty soon.

Wednesday 25th February 2015 – BACK TO WORK TODAY

And I didn’t feel much like it either. A late night last night and the battery going flat in the mobile phone that I use as an alarm clock meant that I wasn’t awake as early as I would have liked, and I crashed out for half an hour at lunchtime too.

Once I actually started work (about 20 minutes late) I cracked on – or so it seemed – but despite working consciensciously throughout the day, I haven’t made all that much progress and I don’t know why.

The story of my life just recently, I’m afraid.

door hanging wardrobe bedroom les guis virlet puy de dome franceI cut the second door of the wardrobe down to size (and much to my surprise, the width is millimetre-perfect), sanded off the edges with the new belt sander, did the lets in the door and the frame for the hinges and fastened them, and then hung the door.

Once it was in place, I fitted the handle, fitted the door lock and drilled out the hole for the key, and fitted the magnetic catch.

That took me nicely up to something of a late lunch and I went off upstairs for a little doze

After lunch, I rooted out another couple of packets of floorboarding (and also found the strips for the shelving supports for the inside of the wardrobe – I knew that I had them somewhere) and then made the sheet of planks from which I’ll be cutting out the doors for the other half of the wardrobe.

I also made the framework for the doors and that took me to 18:30, so having more-than-recovered the time lost due to my late start, I called it a day.

For tea, I cooked a mega-pepper-and-lentil curry that’s now divided up for another three meals, and now I’m off to bed.

I’ll be carrying on with my doors tomorrow – I wonder how far I will get.

Wednesday 7th January 2015 – NOW THIS IS REAL PROGRESS.

door cupboard behind stairs les guis virlet puy de dome franceYou’ll notice that the cupboard at the back of the stairs has now grown a door. It’s amazing justwhat you can do with four floorboard planks, a handful of screws, two hinges and a tin of clear varnish.

And I do have to say that I am so impressed with this door -almost as much as I am with my galvanised steel dustbin.

It’s not perfect – for a start the hinges are not perfectly vertical so the door opens under its own weight when the bolt is undone, but bearing in mind that I knew nothing about carpentry before I started on this house

It took me all morning to hang the door, mainly beczuse I had to chisel out the lets in the doorframe in order to fit the hinges. I had also to go rooting around in the barn to find some laths to use as backing on the doorframe, and to cut down the panel over the door, so I’m not surprised about the time that it took;

After lunch I cracked on woth filling in the plasterboard. There was still a great deal that I could reach without the ladder, but tomorrow I’ll definitely be needing to use that. I’ll have to remember to unbolt it from Caliburn’s roof;