Monday 2nd March 2015 – I DIDN’T GET …

… as much done as I wanted to today – but then I had quite an interruption round about lunchtime.

I struggled to get out of bed this morning, but nevertheless I cracked on with my stuff about Algeria and managed to finish that, at least, even though I was late going down to work.

I managed to fit all of the framework for the upper doors, although one piece had to be recut after it split while I was malleting it into position. All of that took much longer than I anticipated, due mainly to my having to cut a couple more fascia pieces as the ones that I had set aside were not strong enough.

Once that had been done, I went out to fetch a pile of floorboards from Caliburn and then made the first of the upper doors.

But this was when I noticed the smell of burning.

We had a brief patch of sun today and I ended up with 45 amp-hours of power going down the cables to the home-made 12-volt immersion heater. It seems that the connector on the positive cable wasn’t up to that and the connection was arcing out. I ended up having to cut it off, fit a new connector, cut off the insulation and then solder it using the new gas soldering gun that Terry bought me for Christmas.

My soldering is total rubbish as you know, but it has to be better than my crimping, so it seems. and it was then that I noticed that the thread appears to be stripped in the heater element. I had to remove the screw and do my best with a nut and bolt, but that’s not looking so good and I’m going to have to deal with this.

All in all, I ended up having lunch at about 16:30.

Back at work I carried on until 19:00. All of the hinges are in place but the door needs trimming down. That’s not the kind of thing that you can do when you are tired and so I’ll be dealing with that first thing tomorrow.