Tag Archives: aubergine kidney bean

Monday 15th December 2014 – I’VE FINISHED …

solar energy control panel les guis virlet puy de dome france… the control panel in the barn. At least – it’s never ever going to be finished, as I know from bitter experience, but I’m happy with what I’ve done to date. Just one or two things missing – a timer and a charge controller for the wind turbine (although that’s not something that I’m planning on in the near future) and an electricity meter for the mains electricity, but I’ll have to wait until I go to the UK in order to find one of those as they are big, heavy things and cost a fortune to post.

Mind you, even the simplest thinhgs today were complicated. The hook and eye that I bought from Brico depot were the usual Brico Depot rubbish and I had to put the hook into the vice and compress it in order to stop it flying out of the eye. That was the top panel. The bottom panel is held up by a hasp and staple and the front panel is held up by a length of threaded rod through to the rear, and fastened by a wing nut.

Now I need to make the clock work, and to find the instruction book to find out how to configure the new data recorder.

I also made a start on tidying up, and found the Ryobi Plus One flourescent light that I had mislaid, and I’ve finally after much binding in the marsh managed to undo the giant hole cutter from the long spindle – that which jammed up when I was drilling that hole yhrough the wall 18 months ago.

I had a late night last night – about 03:45 and it was difficult to crawl out of bed at 08:00. I went to Marcillat and Radio Tartasse to record another series of rock programmes and then Liz and I did another month of the usual programmes.

And herein lies a problem. We had time to go for a coffee afterwards, but if you remember last time we were there when we heard that the hotel was closing down – well, it’s now closed. And there’s not another cafe open in the town. It seems that that which I had foretold last year, when Pionsat’s mayor announced his grand plans for that town, has truly come to pass and Marcillat is starting to wither on the vine.

This is sad.

Back here, I passed the rest of the morning working on another rock programme – trying to get myself well in advance, and being inerrupted by the postie who brought me the lights that I had ordered for the trailer. And then, after my butty, I went out and attacked the control panel.

Tonight I made myself another giant aubergine and kidney bean casserole thingy, with enough to keep me going for four days. I enjoy doing this as cooking for the next three days is simply a matter of warming things up. Much as I like cooking, I don’t want to spend too much time over it.

Tuesday 2nd December 2014 – REMEMBER THE OTHER DAY …

… when i said that I reckoned that winter was just around the corner?

1st snow winter 2014 les guis virlet puy de dome franceWell, I wasn’t wrong. At about midday today it started to snow – the 1st snow of winter 2014/15.

It might not look like much, but it snowed steadily throughout the afternoon and when I knocked off at 18:00 there was a think layer that was doing its best to stick. And had it been light, I would have taken a better photo of it.

I wonder what it’s going to be like tomorrow morning.

portable power board les guis virlet puy de dome franceI finished off the portable power board this morning. Well, it’s almost finished because it needs a backing on it to keep the cables and the backs of the sockets covered up.

There’s the inverter on there of course, a 600 watt one, together with an electric meter and a timer. Then we have three types of socket – a pair of 12-volt sockets, a single European 230 volt socket, and a pair of UK 230 volt sockets.

Regular readers of this rubbish will recall that I use British plugs and sockets on my 230 volt system because the plugs are fused, and that’s a useful thing to have.

This afternoon, I started on the new power board in the barn down at the southern end.

The bad news is that I dropped my Ryobi Plus One handlamp and broke it. That’s a tragedy because it’s the best light that I’ve ever had and I shall miss it very much.

The good news is that the power board is up and in position. The Xantrex charge controller that works the bank of solar panels is installed, and that wasn’t as easy as it might have been. I forgot how rigid the ware was and it took me ages to bend it into position and thread it through the series of holes through which it needs to pass.

Threading the wires through for the wind turbine was easier, and that’s in place together with the meter that reads the voltage and the amount of charge.

There was an hour left and so I settled down to connect up the new batteries to the system.

And here’s a thing.

Which company sells batteries that take a certain size of bolt that is supplied, so you can look at it and know which size of battery cable to order – and then sells you a meter that works off a shunt connected to the negative lead between the battery and the grounding circuit – and which takes a larger bolt?

Of course, you can’t buy battery leads with different-sized terminals on each end, so tomorrow I’m going to have to cut one lead in half and solder larger terminals onto the cut end. And my soldering is rubbish too.

I have to say that I’m not at all impressed with this company

With the snow, I lit the fire again tonight and made a mega-aubergine-and-kidney-bean whatsit. There’s enough in there for four days as usual and tonight’s helping tasted really nice. Somehow, cooking in the oven tastes so much better.

Monday 3rd November 2014 – LOOK AT THIS!

It’s a 2008 Ford Ranger 4×4 Sport pick-up fitted with a 4.0 litre V6 engine. And furthermore, it’s mine. All mine.

Long-term readers of this rubbish will recall that I am thoroughly fed up with the price that I’m having to pay in North America to hire a vehicle every time that I go over. And not only that, what laughingly passes for “customer service” with Avis Car Hire is appalling. Every time I go there, they try to chisel extra cash out of me for all kinds of excuses and reasons and it’s gone beyond the point of embarrassment.

So to cut a long story short … "hooray" – ed … I’d asked a couple of garage proprietors in New Brunswick to keep me informed about any suitable 4×4 pickup taken as a trade-in, and one of them has come up with the goods.

Bearing in mind how much I’m paying for car hire, this pick-up will pay for itself in one-and-a-half visits to Canada. and if I can find a lightweight slide-in camper back for it, I will be really in business.

Consequently, I spent most of the morning on the phone to a couple of people in Canada – the garage proprietor and my bank – and now the deal is done.

Apzrt from that, I’ve finished the verandah today. Totally stripped out, cleaned and tidied and you can actually see the worktops now. I’ve also cleaned and refurbished the chemical toilet now that you can reach it, because that will be useful for visitors.

Finally, I tidied up a little more on the ground floor and that’s showing a great improvement too.

Tonight, I cooked one of my famous augergine and kidney bean whatsits, accompanied by one of the most wicked rainstorms that i’ve seen for a while. The weather really has changed now.

Thursday 16th October 2014 – THIS WAS ANOTHER MORNING …

… when it was difficult to haul myself out of the stinking pit. I’m not doing too well at this.

After breakfast, I started on some work for the radio programmes and prepared a live concert for the rock programmes for Radio Anglais. This concert is not so easy to prepare as it consists of live recordings from a variety of different concerts and I’ve had to edit them together to mke a seamless performance. We ended up being a good few minutes short and I found a studio track to fill the gap so I had to edit in some applause and links. The lengths that I have to go through for my listeners, but it’s worth it because it’s made quite a good concert and I’m impressed with the editing.

After lunch I attacked a huge pile of errant papers and most of them have ended up in the bin. I there was, however, some good stuff that would do quite nicely for the radio programmes so I’ve cut them out to save for later.

I’ve also been editing the kitchen equipment that is up here too. I can’t think why I have half of it up here as I don’t need anything like this much.

This evening I crashed out again for another half hour or so and then I had another go at the aubergine and kidney bean casserole. It’s nice not having to cook much when I have a pile of that.

Wednesday 15th October 2014 – I WAS SOMEWHAT DISTRACTED …

…today and didn’t accomplish anything like what I intended to do.

It’s difficult to raise myself out of bed at the moment, particularly as it was another 04:00 night (or early morning) last night by the time that I had finished what I was doing. But after breakfast I made a start (or, rather, carried on) with some work that had been backing up for quite some time on the computer.

Rosemary rang me up during the afternoon – she wants to take a rain-check on our shopping trip as she has the roofers round. Her roof was badly damaged in that hailstorm last year and she’s had an emergency tarpaulin over it since then. The insurance company’s roofers have been executing their clients in strict rotation, and they’ve now appeared at Rosemary’s. Naturally, after all this time, she doesn’t want to slow them up now that they’ve finally arrived.

I stopped work at about 19:00 (yes, I was rather carried away by what I was doing) when the battery went flat again in the laptop (there’ no doubt that this little Acer Aspire notebook and its 5 or 6 hours of battery life was a magnificent purchase) to watch a DVD, but crashed out in the middle and I’ve no idea why because it wasn’t as if I had been doing anything exhausting.

I made one of my huge aubergine and kidney-bean casseroles for tea – and as usual there’s enough left over for another three meals and that saves me having to cook for the next few days, which is always a useful idea.

After tea, it was back on the laptop again to carry on all of this sorting out of files. I’m not sure where all of this will finish but so far I’ve liberated about 10GB of space on the hard drive and many of the files are much easier to find now. If I carry on like this, I shan’t know myself.

Tuesday 12th August 2014 – YET ANOTHER TOW JOB

caliburn tow in Frod Transit A frame les guis virlet puy de dome franceThis time, we used the A frame.

For a change, I was up early and went down to Pionsat to pick up Simon. Then we set off for Riom. I dunno if anyone else has had issues at the Ford garage there but they aren’t half miserable. They weren’t able to fix Simon’s Transit and instead of being embarrassed about it, I found them to be nothing but surly and uncooperative. I struck them off my list of local garages ages ago, and I reckon that Simon has done now.

It took ages for me to work out how to use the A frame – it’s been something like 15 years since I last used it, and of course Simon’s Transit is a big, heavy vehicle – right on the legal limit of 2.5 tonnes on the A frame.

Anyway, eventually we sorted it out and off we set for Montlucon. I would have been much happier with the trailer or even the towing dolly but Simon’s van is far to heavy for both of them and well over the gross weight for Caliburn.

It was quite an interesting drive to Montlucon. It’s all up mountain and down gorge and along canyon, not like anywhere normal, and of course Caliburn only has a small engine so we didn’t get up to anything faster than 70kph, and then not very often at all.

With the weight, going up the steep hill was a struggle but coming downhill was even more exciting, with Simon’s Transit threatening to overrun Caliburn in places.

Not only that, it’s a busy main road and we had to pull over every couple of miles to let everyone past. So it took hours to do the journey.

But anyway, we made it safely (after a fashion) to Montlucon, to find that Barratts, the Ford main agent, was closed for lunch. Luckily, they had left the gate open to the yrd so we could get in there and drop off the van. I had to reverse the whole train right across the carpark so as to put Simon’s van into a parking space, and much to my surprise, it went straight in. That was astonishing, considering that with the A frame pivoting in all directions and no driver in Simon’s van of course, it usually goes off anywhere excpet where you need it to go when you are reversing it all.

Simon bought lunch, for which I was grateful, and then we went back to the garage to negotiate. I know the service manager there and we soon sorted things out, and then we went back to Pionsat.

Simon made a coffee and then I came home and made tea – another aubergine and kidney-bean whatsit.

I’m glad that it all went okay – I was having all kinds of ideas running aeound my head about the million and one ways that this could all go pear-shaped. Still, it’s all in a day’s work, isn’t it?

Tuesday 15th July 2014 – BACK AT WORK TODAY.

This morning I was up and about fairly early and after breakfast I had the usual couple of hours on the website.

When I went outside I started to rebuild the 12-volt immersion heater. I had a couple of attempts at fitting the element before I was satisfied, and then I made up some electric cables out of a jump lead (the red one) and a starter cable (the black one). Once I’d done that, i added another pile of insulation to it and sealed it all in. It’s now all fitted, wired in and working properly.

As an added attraction, I’ve removed the warning light and that’s now fitted into the fascia panel of the socket that’s wired into the excess charge circuit.

This afternoon I was up on the scaffolding ripping off the ivy from the back wall of the house, and it’s all gone now, which is just as well as there was quite a lot and it was stuck fast.

I cleaned off under the eaves too and then spent a pleasant hour looking for tools. Once I had found everything that I was seeking, I charged up the cement mixer with some sand and lime mortar, enough to make two buckets full.

Up on the scaffolding, I started to spread this about over the rubble with which we had infilled between the chevrons. There were some enormous gaps in there which are all infilled now – at least, most of them because I ran out of mortar. Mind you, it was 19:20 and so I’ll mix up another bucket or two and finish it off tomorrow.

This evening I made one of my kidney bean and aubergine whatsits – enough to last me three or four days. I don’t want to spend the rest of the week cooking.

Tuesday 1st April 2014 – IT WAS A LITTLE BETTER …

… getting up this morning, which was just as well as I had a lot to do today. So I was sitting eating breakfast before the 08:00 alarm reminder went off. I can’t remember when (or if) that has ever happened before.

And at 08:55 I was at the bank at Pionsat ready to withdraw some cash, only to find that the Credit Agricole plays right along with this Poisson d’Avril lark by having expired my bank card yesterday. And, according to the guy behind the counter who has tken over since Madame de St Rémy retired, “we posted your enw one to you three weeks ago”. So now I’ll have to sift through this enormous mountain of post that accumulated while I was in the Pyrenees.

Off to do this furniture removal and either I’m becoming much less tolerant as I grow older or else people are just losing all sense of proportion and priorities, in that the place wasn’t even packed up – even down to last night’s leftover food still in the saucepan on the cooker.

Everything should have been packed up and the furniture dismantled … "disPERSONtled" – ed … a long while ago and we could then have slung it into the van and cleared off. As it was, we didn’t even have the first load (because we ended up having to do two trips) into Caliburn until long after 11:00.

On the way into Montlucon we had to make a diversion as the mother of the guy who was helping us had had a power failure and Yours Truly was asked to take a look. But I tell you what – I am never going to complain about the standard of my wiring ever again. The fuse box of this house had been assembled on a wooden frame and whoever assembled it had trapped a wire in the framework and then driven a screw right into it, missing the wooden support completely.

So we just dumped the stuff into the garage and went back for the second load, by which time we were having the hottest day of the year so far. There was tons of stuff left over, but none of it packed and so they can pack it themselves and move it in a car.

Then of course we had to take it all upstairs. And by that, I mean three and a half storeys without a lift. And no hot water here – I spent about an hour trying to make the gas water heater work, but with no luck.

We’d done about three quarters of the work but they decided to knock off for lunch (it was about 15:30 by this time) so I left them to it and went to Neris-les-Bains. Yes, an absolutely gorgeous day and so I sat in the park and read a book until 17:00 when the swimming baths opened. First time for ages, and I was feeling all hot and sticky and sweaty.

Feeling much better, I came back here and had a coffee and then crashed out. Finally I managed to make one of my legendary aubergine and kidney bean casseroles, and that will keep mein business for three or four days.

And now that I’m clean, I’m going to have clean bedding tonight. Definitely pushing the boat out here.

Wednesday 22nd January 2014 – HERE YOU ARE THEN

shelving lean to les guis virlet puy de dome franceHere’s the shelving unit in the downstairs part of the lean-to, allnicely fitted and made to measure.

It didn’t take long to finish it either, about 3 hours or so. But I was interrupted by a heavy rainstorm so I had to take in the washing, and a phone call from Marianne too.

That did however give me some time to start emptying the verandah a little and move the stuff onto the shelves. There’s a long way to go, but at least I’ve made a decent start and it won’t be long before I can organise myself so much better

Tonight I cooked a mega-aubergine and kidney bean whatsit – and on the woodstove too. I’m definitely improving there.

Monday 6th January 2014 – GOD IT WAS HARD THIS MORNING …

… to get out of bed. Even though I had had an early night and was wide awake when the alarm went off, it was still a struggle.

And the first thing that I noticed was that in my haste I had forgotten to do the washing up last night, and there is very little that I hate more than waking up to a pile of dirty washing-up.

First job this morning was to empty the composting toilet. Such lovely jobs that I have to do here of course. And after that I had to sort out some wood. I’m running low on kindling but there’s a big bin of it that was thoroughly soaked in a downpour. I had to drain that out and, seeing as it was (for a change) a fine day, I laid it all out to dry.

To get there though I had to attack my pile of old windows – some that I had picked up from the dechetterie for the glass, the fittings and, of course, the wood to burn. So while I was there, I dismantled a few of those.

This then led to the woodshed. I hadn’t quite finished it off as there was a curtain, made from a tarpaulin, to hang across the front. While I was busy adding wood to the woodshed I took 20 minutes to sort that out, and now that’s finished.

Next job was to start moving the stones. And some of them were flaming heavy too – I’ve no idea how I got them into there in the first place. Most of them I could lift out but a few I had to roll.

This afternoon when the big stones were out of the way I started to tidy up some of the rubbish. And there was a pile of that too, but once that was out of the way I could look at the rest of the rubble.

To move that, I needed to clear the space where I had been tipping the rubble before. A year or two’s worth of weeds, nettles and brambles needed cutting down and removing so that took a while, and before I knew it, we were in the dark.

Still, with all of the donkey work having been done, the rest should be straightforward tomorrow.

No fire up here tonight and it’s 16.8°C up here. This weather is astonishing. I even ended up cooking downstairs tonight – far too warm here for a fire.

But guess who put a tin of lentils instead of a tin of kidney beans into his aubergine and kidney bean casserole?

Wednesday 20th November 2013 – THE SNOW DIDN’T LAST LONG …

… this morning. It was mostly all gone by 10:00 and we were back in the dreary marshland again. It’s like to good old days, with mud up to my ears.

This morning I carried on in the barn and finally reached the far wall. That’s an achievement – there’s stuff there that I haven’t seen for probably 15 years, and when I get around to it, there will be a lot of stuff going down to the dechetterie.

After lunch, it was the turn of Rosemary to ring up for a chat. She has a courtesy car at the moment as hers is in at the garage, and she couldn’t work out how to put it into reverse. Having sorted that out, we had a good 20 minute natter on the phone.

A then had a couple of hours in the lean-to. I found a shelf unit when I was tidying in the barn, and it will just go nicely in the lean-to by the door, but I need to make some space of course. The best way to do that is to chop a pile of wood and while that didn’t seem to make any room at all in the lean-to, it certainly filled up the woodshed. I suppose that i’ll have to keep on chopping. But if I can get the shelf unit into there I can put all of the gardening stuff there so it’s out of the way where it should be.

This evening I made another aubergine and kidney been casserole without the kidney beans because i forgot them, and it’s snowing again outside. And the snow looks much more determined than it did yesterday evening, that’s for sure.

Friday 1st November 2013 – IT’S A BANK HOLIDAY HERE TODAY.

But not for me – I have work to do.

Now that the cleaner has finished, I can review the packing situation, especially as, on my travels yesterday to buy my bread, I liberated a pile of wooden boxes.

Everything was unpacked from the cardboard boxes and repacked in the wooden or plastic ones. There are two types of boxes – those that are wanted as soon as I get home, and those that can wait for whenever. The idea is that the least urgent stuff will be crammed right down at the far end of Caliburn and the more urgent stuff put closer to the doors. That way it will all be to hand.

You’ve no idea how long it took to do all of this – much longer than I thought – and then of course I had to dismantle the empty cardboard boxes. But at least now there’s plenty of space available in the apartment and it looks more like a furniture removal job.

For tea I had the last of the aubergine casserole that I had made earlier. Then, having washed the pot and the plates, they all went into a box. Tomorrow I’m out and Sunday I’ll have a pizza that I can eat out of a box with my fingers. I’ve officially finished cooking.

Wednesday 24th July 2013 – I HAD A(NOTHER) DREAM

And no floozies in it either, which was a little disappointing given the last effort. I was working in the building trade in London and, having worked out a swimming baths that I could use as my headquarters in North London, I was looking for a similar in South London and was going over some possibilities in my head. I was even out in the south-west of London travelling over a road that I had travelled in an earlier dream a good while ago – a short cut from the noth-west side of the city down to the west side, past a cricket or sports groud, when I was on my way walking past the House of Commons (on the south side of the city) and off to Edmonton (which was also on the south side of the city last night too).
Meanwhile, back at the ranch, I was attending a lecture for a whole afternoon and when I went outside I found that I had parked Caliburn (which was now, mysteriously, right-hand drive) roughly on the kerb with his engine running for about 4 hours. In a rush to get away and lacking in patience, I tried to force my way past a lorry that was badly parked, and put a scratch all down Caliburn’s right-hand-side.

So enough of that – awake at 06:00 in the pouring rain, and a desultory tidying up until 09:00, when I nipped out to pay the internet (I was confised about which company deals with what and we had been cut off) and do some shopping as there was no food in the house.

And then, I started to throw stuff away in here and it’s starting to look a little better.

Tea tonight was one of my aubergine-and-kidney-bean whatsits (enough for a week, I suspect) and now off for an early night. I’m getting old and I can’t last the pace.

And Friday, I have an appointment with my solicitor at 10:30. Mustn’t forget.

Wednesday 14th November 2012 – I DIDN’T MANAGE …

… to rip up the bathroom floor today.

In fact, I was considerably sidetracked.

This morning though was pretty much more of the same. 11 pages of writing about the French laws of slander and libel for Radio Anglais – important for ex-pats due to a couple of high-profile court cases just recently concerning postings on social network sites;

And you wouldn’t believe just how different is the law over here compared to the UK.

Yesterday however when Rosemary was on the phone, she told me that the swimming baths at St Eloy-les-Mines had reopened after maintenance, and that one of the few times that they are open is Wednesdays at 13:30.

And seeing as it’s been a good while since I’ve had a decent soaking, we agreed to meet up this afternoon and go for a swim.

And so we did. 

Flaming cold in there it was (although not as cold as that swimming baths in Québec last May), but at just €1:88 a ticket, it was value for money and I had a really good scrub in the shower afterwards.

I look almost human now.

We went for a coffee and a chat afterwards, and then for a wander around a couple of the DiY places.

That wasn’t all though.

I’m nice and clean now, but my clothes weren’t. In fact my bedding walks off into the cupboard every morning under its own steam. Consequently, off I went to the laundrette and washed everything that I could lay my hands on.

Yes, a nice clean me, nice clean clothes and nice clean bedding tonight. I won’t know myself, will I?

But we did have a culinary disaster tonight. I made one of my mega-aubergine-and-kidney-bean-chili things tonight, to last me for three days, only to realise that I had forgotten to add the kidney beans.

And then I dropped tonight’s portion on the floor in the verandah. Luckily that I had a few more helpings left over.

But what a waste of food, hey?

Tuesday 21st August 2012 – I HAD ONE …

… of those days where I couldn’t get myself started.

At least I had a good night’s sleep with the fan going through the night – so much so that I dreamt that I was back working at a job that I hated in a place that I hated with people who I hated.

Surprising isn’t it, what goes through people’s minds.

So this morning in the heat I stirred a few papers around – but I’ve managed 14kb of notes so far for the radio programmes and that should see us through the next recording session if I can’t summon up the enthusiasm to do any more.

collapsed lean to repairing stone wall les guis virlet puy de dome france>Outside this afternoon another 6 buckets went into the wall but it’s slow work despite me standing on the ground today doing the work.

I’ve been filling in two of the vertical cracks, and that has been time-consuming, and also it’s not been easy to move some of the old cement pointing that needs to come out.

The old metal screwdriver that I use as a chisel is giving up the ghost, I think. I shall have to buy a new one … “this heat really is getting to you” – ed.

Anyway, I reckon that if I can keep up this schedule, another 5 days will see this wall finished – and then it will be time to start on the long wall and point that.

But that should be easier … “famous last words” – ed … as I’ll be working off the scaffolding and you saw how quickly I did the house wall once I had a scaffolding up there.

Nevertheless, I’m impressed with what I’ve done so far. I shan’t know the place when it’s finished, whenever that might be.

Two phone calls too – one from Marianne telling me that our walk tomorrow at St Hilaire is cancelled as there’s a funeral at the church, and secondly from Rosemary who wanted a chat.

And I cooked a mega-aubergine-and-kidney-bean doodah to last for the next 3 days and just as I finished, the gas ran out. That’s over 10 months (8th October – I mark the bottles with the date when I connect them) that that bottle has lasted.

It just shows you the benefits of having the electric steamer and also the new woodstove. A far cry from when I needed to buy a new bottle every three weeks, isn’t it?