Here’s the shelving unit in the downstairs part of the lean-to, allnicely fitted and made to measure.
It didn’t take long to finish it either, about 3 hours or so. But I was interrupted by a heavy rainstorm so I had to take in the washing, and a phone call from Marianne too.
That did however give me some time to start emptying the verandah a little and move the stuff onto the shelves. There’s a long way to go, but at least I’ve made a decent start and it won’t be long before I can organise myself so much better
Tonight I cooked a mega-aubergine and kidney bean whatsit – and on the woodstove too. I’m definitely improving there.