Saturday 12th September 2009 – GRRRRRRRRRRRRRRRRRRR

fcpsh football club de foot pionsat st hilaire equipe 3 neuf eglise puy de dome franceThe footy season commenced this evening and Pionsat’s 3rd XI (who were in action aganst Neuf-Eglise’s 2nd team) started where they left off at the end of last season. Damian in goal with his teflon gloves and a 3-0 defeat.

The 1st XI are in action at Miremont and the 2nd XI are in action at Pontaumur tomorrow afternoon. Both away from home and I haven’t been to either ground before so I’m rather spoilt for choice. I can go to Pontaumur again as their 3rd XI are in the same division as Pionsat’s 3rd XI but seeing as it’s the 2nd XI’s 1st game in Division 2 following their promotion, I reckon I’ll be wandering off there to give them my (im)moral support.

Meanwhile, back at the ranch, I went into Montlucon today and spent a record low 200 Euros at Brico Depot.

And there is a good reason for that. Most sheets of construction material are of a standard size – 2.40 metres long. And short wheelbase Ford Transits are 2.42 metres long in the load bed to take this into account. So I have absolutely no idea why sheets of insulation-backed plasterboard weigh in at 2.50. It’s totally illogical.

I need about 20 for my attic but of course they won’t go inside Caliburn with the door shut and you can’t drive 30 kms with both the back doors wide open, and you can’t leave them in the back of the van until you need them. So if you stand them sideways upright with just one door half-open you can get 13 in which is enough to be going on with, particularly as you have to unload them and put them somewhere (like standing upright outside the house covered by a tarpaulin).

And they are big and awkward to manoeuvre. There’s no way I’ll be getting these up the ladder into the attic in one piece. I’m going to have to cut them to shape outside and then get them up into the attic. And where I could in theory fit a whole one, it’s still going to have to be cut in at least half so I’ll be able to handle it safely.

Mind you, the spending spree continued as I ordered my bed-settee (340 Euros) and my occasional table (I don’t know yet what it is for the rest of the time) and I had to pay a 25% deposit. It’ll all be ready for early October which is my deadline for doing the attic out. A lot of money for a bed-settee you might think, but I’ll be spending a lot of time on it and so I may as well be comfortable.

They also had a really comfortable office chair (like the old one in Brussels that I have curled up and slept in on numerous occasions) and a really dinky miniature gas cooker which has caught my eye for the future.

And as luck would have it they were having a sale of bed linen at the Auchan and I now have 2 quilt covers, 4 pillow cases and 2 fitted sheets for a grand total of 25 Euros. And all in matching colours too! All I need now is a room to put it all in.

Give me your opinion of this post
  • Excellent 
  • Useful 
  • Interesting 
  • Weird 
  • Surprising 
  • Boring 

2 thoughts on “Saturday 12th September 2009 – GRRRRRRRRRRRRRRRRRRR

  1. Krys

    Well, looking at your last picture, your attic is showing definite signs of turning into a room. You’ve seemed a bit frustrated lately at the slow pace and delays, but honest Eric, it gets done when it gets done and better done right than rushing, making a mistake and wasting time having to redo bits later on. You’ll have a home to be really proud of eventually.

  2. Epic Hall

    That’s my way of thinking. A few days here or there isn’t going to make much difference and after all, I’ve lived in my little cupboard for two winters now. What I’m doing is for the rest of my life and I only want to do it once – I don’t want to have to do it all over again.

Comments are closed.