Saturday 4th August 2012 – NEVER MIND A PERSONAL BEST …

… this must be something of a new world record.

Believe it or not, I was up and about this morning at the stupid time of 05:50 and I’ve absolutely no idea why. It’s not as if I’d wet the bed or a mouse in the attic had been doing a clog dance or something like that.

Anyway, I had a really leisurely start to the morning and spent a load of time working on the website. I’m currently discussing the Battle of Québec, as it happens.

13:30 I nipped off into St Eloy-les-Mines to do some shopping and also to buy some bricks.

Cheze had them in stock – but at €0:94 a piece which is ridiculous if you ask me. Anyway, I bought just enough to do the surround for the second window that I’ll be fitting in the lean-to. It wasn’t until much, much later that I remembered that I had bought the original lot from Point P.

Just by way of a change, I did some work this afternoon – putting back into position the stones that I knocked off the wall the other day, cementing them into position and then concreting them in place.

But now I’ve run out of gravel, would you believe? It’s clearly not my destiny to finish this wall.

But no gravel means that I can use up the pile of scrunched-up brick that used to be two internal walls in the house until I knocked them down.

They were just lying where they fell all over the floor and so this means that I’m clearing them out of the way, which is A Good Thing. They make nice lightweight concrete too.

Tomorrow is a day off – no village Open Day to attend. I’ll have a lie-in and maybe go to Pionsat for a prowl around the brocante and see how Marianne is doing with her stall for the Amis du Chateau de Pionsat.

Friday 3rd August 2012 – I DIDN’T DO …

… anything at all on the wall today.

At about 09:30 while I was working on my website Liz rang to say that the brake parts had come for her car.

So after working on the website until lunchtime I made myself a few butties and then had lunch in Caliburn on the way down the road.

Of course, when there is a choice of 4 or 5 types of rear brake shoe it’s easy to choose the wrong one, isn’t it? That’s what we found out after we had dismantled one side of the car.

But at least it gave us an opportunity to look at how it all worked and to give it all a really good clean.

The front brakes were another matter. We had the right disc pads and after the retaining pins had been freed off, we set to work. Or at least, we tried to. The outer right-hand pad was seized in the caliper and looked for all the world as if it had never been used.

That took quite some freeing off but eventually I managed.

Then after spending a while freeing off the piston and cleaning everything off, a little copper grease lubricated everything and it re-assembled quite nicely.

As for the left-hand side, I removed the retaining pins, and as soon as I did that, the friction lining off the outer pad fell off the car, leaving the backing plate behind.

No wonder the car was making strange noises and doing weird things when Liz applied the brakes.

All of that needed a really good clean and the piston in the caliper freeing off, and then it all went back together quite easily

Anyway, now it all works fine, stops like it’s supposed to, and all the strange noises have gone. I’m glad I did all that.

Liz cooked a nice tea and made me some spicy tomato chutney to bring home as a reward. That was really nice.

But seeing what passes for garage mechanics around here, I can see me turning the clock back to where I was in the late 1980s.

What I need first of all is a little workshop.

I shall have to do something about that. I may well be on to something here. 

Thursday 2nd August 2012 – I DIDN’T TAKE …

… a photo of the work that I did on the wall today. There’s a good reason for this, and I’m as malade as a perroquet as they might say around here.

I put a lot of work into what I was doing too. I removed all of the breeze blocks that I don’t want in the wall, hung the window framework, and then built up a fair few rows of stones both inside and outside, filling the space in between with lightweight concrete.

It was all looking quite impressive too and so you can imagine just how totally depressed I was when with just a few minutes to go before I planned to knock off, I dropped a rather large stone right onto the wall and knocked off about 2 rows of what I had built so far today.

One very unhappy bunny, especially as I was out working until 19:30.

Had I knocked off at 19:00 – the usual time for finishing when I’m on summer hours,, none of this would have happened.

Anyway, apart from that, I had the usual couple of hours on the internet, and a chat with Rosemary on the phone.

Later on, I even had a visit from Bill and the Hound of the Baskervilles. I seem to be in demand again.

Anyway tomorrow I’ll have another go on the wall and try not to knock anything off it again.

With all of this cement that I’m mixing, I’m starting to notice a lack of water in the water butts now. A storm is forecast for Saturday night – I hope so!

Friday 27th July 2012 – WELL, SO NO-ONE …

… rang me and so I had a full day at home, for the first time since I don’t know when.

This morning it was more of the usual on the website, but I knocked off at 12:30 in order to make a good start on the wall.

And you can tell how much I was enjoying myself by the fact that when I happened to notice the time, it was 19:20 – way past my knocking-off time.

3LEAN6TOBut I’m glad that I did because the results speak for themselves.

The windowsill (a row or bricks) and the brick surround on one side – they are now properly fitted and to the outside, the wall is now finished up to the window.

On the inside, there’s about one-and-a-half rows to finish off and then to pour the concrete in between the outer and the inner face.

In fact I worked really hard today and didn’t really want to stop – not like me at all, is it?

But the hot (and I DO mean hot) solar shower that I had afterwards set the seal on Friday night

Tomorrow, if I’m up early, I may well go to Montlucon for the shopping. I’m getting low on tons of stuff.

Thursday 19th July 2012 – I DIDN’T QUITE MANAGE …

… an early start this morning.

I was awake for much of the night with had another bad attack of cramp and that wore me out. So it was 09:00 when I finally rose out of my pit.

We did the usual bit working on the website and then for the rest of the day I was outside.

We had a few minutes on the wall with the SDS drill but the day wasn’t really bright enough to run that for any length of time and so I fixed the solar water heater instead. You may remember me saying that the tank fell down on my head yesterday afternoon while I was having a shower.

lean to repairing stone wall les guis virlet puy de dome franceThis afternoon I was working on the wall again.

Long-term readers of this rubbish will remember that the other two walls that I built, I erected stones in the vertical position at the outside and inside, and filled in between with a very lightweight concrete – a kind-of concrete wall with stone cladding.

Anyway, that’s what I’m doing here with this wall now.

Part of the wall had been built with very light breeze blocks – real cinder blocks even – so I’m smashing those one-by-one to use as the infill and then pouring concrete over the pieces to hold them in.

It will be a lightweight wall, but it won’t ‘arf have some strength.

I’ve made quite a lot of progress and I reckon that given a good day on there tomorrow I shall have about half of the wall finished.

All I’ll have to do then is to point it, of course.

Monday 16th July 2012 – BLIMMIN’ ‘ECK!

Yes, and for many reasons too. Probably the most important was that it didn’t rain today and we had bright blue skies, with just a few clouds passing by – the first time since I can’t remember when.

It didn’t take long for the batteries to be fully-charged, and then the excess solar charge was diverted into the dump load.

home made 12 volt immersion heater solar energy dump load overcharge les guis virlet puy de dome franceAnd with the data panel that I installed on the overcharge controller, I could see how it was doing.

28 amps – or 382 watts – currently going into the home-made 12 volt immersion heater. Already, 23.4 amp-hours have gone in and by the time that I took the statistics before going to bed, we’d have a grand total of 122.2 surplus amp-hours – over 1.5KwH.

By the time I was starting to slow down – at 18:00 – the water in the dump load was up to 58°C and still rising. And so cue a load of washing. That’s all hanging out on the line now.

I even changed the bed linen, having to peel the pillow cases off the pillows and the quilt cover off the quilt.

It won’t only be clean bedding tonight – it will be a clean me too, for the temperature in the solar shower reached 33°C and a couple of litres out of the 12-volt immersion heater pushed that up to a respectable temperature and so I had a nice warm shower – and how I enjoyed that!

Pure bliss!

That’s made me feel like a new man – although where I might find one around here is anyone’s guess.

But that’s not all.

The benefits of going to bed early saw me up and about and breakfasting at 07:40 and that was really astonishing. That meant that I had a good 4 hours on the website and I was still all done by midday.

So I mixed a load of mortar and made a start on rebuilding the stone wall on the lean-to. That kept me busy for a few hours.

Rob came round to borrow my 100mm hole-cutter so we had a chat for 15 minutes, and then I had another task to attend to.

Hardly any water seems to be entering the water butts so I also stripped down the home-made water filters. And as I suspected, bunged up to the eyeballs, they were. and cleaned out the water filters. No wonder there wasn’t much water reaching the water butts.

Anyway, they are all ready for the next torrential rainstorm.

And me? I’m ready to snuggle up into my nice clean bed. I’ve been looking forward to this for ages

Saturday 14th July 2012 – IT’S ONLY 23:15 …

… and I’m thoroughly whacked.

I’m also extremely tired, but that’s another story. Anyone would think that I’ve had a really hard day, but in fact I’ve done probably not much more than nothing.

I didn’t even have an early start either – it was 09:30 when I crawled out of Quatermass’s Pit.

And on that subject, I wish that the weather would improve so that I could do some washing. We’ve had more torrential rain again to day and if it carries on I’ll be uprooting my vegetables and planting rice instead.

After a leisurely morning’s breakfast I started on the radio programmes but it wasn’t long before I was sidetracked.

The Music folders on my external hard drive are in a mess and having sorted out the photos last weekend, I decided to organise the music. Strangely enough, that freed off a couple of gigabytes of space on my hard drive and there’s room to move about now.

And that wasn’t all either.

In 2002 I was in Utah and spent a very pleasant half a day prowling around the Escalante (or Escalente) Desert in Utah. Today though, it’s in the news.

All over the American newspapers today though was an article about someone else who had been prowling around the Escalante (or Escalente) Desert for three weeks totally lost and being found in the nick of time by some searchers.

I had a look at my web page, and realised that it was one that had only received the briefest of updating when I did a major update of my website in February 2007.

Sensing that the page would receive a few hits today (and I wasn’t wrong either) I spent the afternoon rewriting it and bringing it right up to date.

So much for the radio.

Anyway, I’m off to bed. I’m out with Marianne tomorrow and I need to be on form. I’ve no idea why I’m so tired right now.

Friday 13th July 2012 – IF A THING …

… is too good to be true, that’s because it usually is.

And when you see a thing that is too good to be true taking place on Friday 13th, then you can bet your life that it will be too.

And for that reason I didn’t hold out much hope of my little trip to Montlucon bringing home the bacon, but nevertheless you have to go through the motions and do all that you can, because you never know.

And so, up at 06:00, down the end of the lane by 06:25 to meet Terry as he drove past instead of him coming down here, going to Montlucon as quickly as possible, and all to no avail.

Brico Depot had a sale on this morning, and they had some prefabricated car ports at just €199 each. I wanted two, to put on my hard standing to cover up Caliburn and the Minerva, but even though we weren’t there anything like late, they had all been sold.

Or so they said.

At that price, it really was a giveaway anyway so it wasn’t really a surprise. Still, never mind. I did all that I could do, and it would have been a stunning coup had we really pulled it off.

I bought a few more bits and pieces and on the way back we called at the quarry at Montaigut en Combraille. I wanted some sand but we ended up with a huge load of dry mix for concreting – Terry is concreting a patio at his house next week.

And that has given me a little idea too – more of which anon.

So breakfast at 11:00, an event that occurs quite often regularly around here, but never ever AFTER a full morning’s work, including a trip to Montlucon and to the quarry though.

Wrapping my mitt around a warm cup of coffee I went off to do some work on the website but was interrupted by a phone call from Cheze in St Eloy les Mines. Our water butts have finally arrived.

And so I wandered off to St Eloy les Mines to do the shopping (it’s a Bank Holiday here tomorrow) and then off to Rosemary’s to give her her water butt and her guttering that had been lingering around in the back of Caliburn.

I was there until 19:30 as well – gossiping away like a right bunch of old women, we were.

Tomorrow is a Bank Holiday as I said, and it’s my custom to have a day off work on a Bank Holiday. But due to circumstances beyond my control, I’ve yet to have a Bank Holiday off this year, and tomorrow is no exception as I have a few radio scripts to write for next weekend.

It’s all go here. Really, I don’t know how on earth I used to find the time to go to work.

Tuesday 10th July 2012 – YOU KNOW WHO …

… your real friends are when you ring them up and as if they fancy a trip to Montlucon on Friday morning – arriving there (45 mins from here) at … errr … 07:00.

“What’s the score?” asked Terry
“Brico Depot has some interesting stuff in the arrivages that has caught my eye but it’s big and bulky, and we need to be there early”
“I’ll bring the trailer then”.

I hate to tempt fate by making announcements about things that are outside my control but if this comes off it won’t ‘arf be a stunning development for round here.

So where was I? Ahh yes.

rendering concrete lean to les guis virlet puy de dome franceAfter the usual couple of hours on the web pages I went outside and spent a good deal of the afternoon putting the second coat of paint on the rendering of the lean-to.

You can see what the rendering was like prior to the painting if you look at the bottom left-hand corner where I couldn’t reach. I know which one I like better.

That took me until 17:00 when I went off and attacked the garden.

Clotilde gave me some of her lettuce thinnings yesterday and so I weeded and hoed a few spaces in a couple of the raised beds and planted them in … note to self – when I thin out the leeks, send some round to Clotilde in exchange … and then gave them a really good watering – not that they need it of course in this weather.

After that I checked on the carrots and beetroot that I planted a couple of weeks ago. They seem to be doing fine and so I planted another row of each. Certainly covering the sowings over with old caravan windows seems to be the way to go here

That took me until 19:00 when I knocked off. Thoroughly exhausted – you’ve no idea how much like hard work all of this is.

Monday 9th July 2012 – THIS IS WHAT …

… I was doing today.

RENDERING CONCRETE lean-to les guis virlet puy de dome franceI’ve painted the end wall of the lean-to that I’ve been rebuilding.

And even looking carefully, you can’t really see the join between the original rendering and the rendering that I did.

You can however see the original colour of the rendering if you look between the ground floor window and the 1st floor window – a horrible manky dirty grey paint. This cement-based paint that I’ve been using to paint the house – a pale yellow colour, makes it look so much nicer.

And it will look nicer still when I do the second coat.

You’ll notice the door of the lean-to. That was one that I made back in 2000 and as I was leaving, and not due back for 6 months,

I painted it in used engine oil to preserve it. It’s the best treatment that you can ever do to wood and when I’m preparing wood to be buried in the ground, like fence posts and so on, I always soak the ends in used engine oil, even today.

This morning though I was as usual on the computer doing my web pages. And quite early too – I was awake long before the alarms went off. A couple of consecutive early nights are what I have to thank for that.

But I had a weird dream again – I was a-wandering down West Street in Crewe and met up with an old school-friend, and we chatted for ages about one or two people we knew and the cars that they owned. We all – a large group of us in the end – ended up back at a hotel. Bizarre!

This evening, with the hotel in St Gervais d’Auvergne closed for holidays, the Anglo-French group went round to Clotilde’s and spent a very pleasant evening there. Clotilde made loads of stuff to eat, which was really nice of her, and she gave me a doggy bag, the contents of which I have just this minute demolished.

It’s nice to meet up with good friends and chat away for ages. I really should do it more often.

Wednesday 4th July 2012 – This was another day …

… where I didn’t really do all that much. An early start, though, and plenty of time on the computer even though I wasn’t feeling myself … “quite right too – disgusting habit” – ed … but at 12:00 Terry came round for a chat – he’d been working at Lieneke’s this morning.

One thing that we did was to look at that hole that I’ve been trying to drill for about 6 months. We came to the conclusion that I had grounded out on of all things a piece of granite which had somehow contrived itself to be in the wall. You wouldn’t believe that! Anyway, we took a gamble and hammered away at it for an age with a SDS drill and we managed eventually to shatter it. Drilling became a lot easier after that.

However I didn’t manage to do any more because Lieneke came round for a chat and it’s always nice to see her. She’s staying for 3 weeks, she says, and that’s good news.

After this I went to Marianne’s to erect one of these IKEA-type wardrobes for her. She’d been struggling for a while to do it but the Ryobi drill and the IKEA drill-bit soon solved that problem.

church st maurice pres pionsat puy de dome franceOnce we had organised that, we went off to St Maurice for her walk. We had 5 clients and we spent most of the time in the church there.

It’s really interesting as churches go because the original part is a tiny 12th-Century church that has been considerably expanded over the years in several different architectural periods, as you can tell.

12th century church st maurice pres pionsat tribune balcony puy de dome franceAnd yet the original bit, now largely abandoned, is still pretty much intact and original although it does have I suppose what in a theatre would be the circle – an upper floor balcony-type seating arangement dating from the 16th Century as a first attempt to increase the capacity.

I’m not quite sure that I’d want to go and sit up there, close as I might be to my maker. It’s not the soudest structure that I’ve ever seen.

church st maurice pres pionsat puy de dome franceAstonishingly, when an architectural survey of the church was undertaken by the bishop in 1842 he called it “worthless” and recommended its demolition. The congregation did move out into a temporary place of worship.

However that place deteriorated even quicker than the church did and so when that was condemmed they moved back into the church and instead of demolishing it, they planned its enlargement.

It just goes to show that Bishops and all these kinds of people can’t recognise a religious treasure when they see one, as I have said on a previous occasion. It really is a magnificent church and to think that the bishop wanted to demolish it.

Some people have no taste.

Monday 2nd July 2012 – What do you think …

creeping plant growing up kwikstage scaffolding puy de dome france… about my nice environmentally-friendly scaffolding? I’ve no idea what that plant is that has decided to grow up it, but it has heart-shaped leaves and small green berries and it’s growing like crazy.

Yes, you’ll notice that I’ve lowered the scaffolding. The roof is finished and, seeing as how I finished the rendering off around the front this afternoon, I’ve started to paint the woodwork with the LIDL wood treatment. That means that I have to lower the scaffolding. I’m only doing the outside now – the inside can wait until the weather is bad.

Once the woodwork is painted, then I need to paint the rendering off around the front of the lean-to so that it matches the house. For that, I need to move a pile of stuff that’s around the front, although I’ve not worked out where I’m going to put it yet. Still, It’ll All Work Out in Boomland, so they say.

Once all that is done, then I can start on my secret project, to put Krys out of her misery, or else I can carry on rebuilding the wall that you can see in the photo and then put the guttering on. Probably guttering is a good idea as Thursday I’m hoping to have the water butts for there. That’ll mean that Krys will still be in suspense for another couple of weeks.

So that was this afternoon. This morning I was on the website again, and then I was outside in the garden. Apart from tbe usual weeding, I planted another row of carrots and some more beetroot and then spent a pleasant hour thinning the cabbage and cauliflower. The sprouts need thinning too but I’m not sure where to put the ones that I pull out.

But this is all progress, isn’t it? I’ve never ever reached the thinning stage with the brassica. Usually this time of year I’m hunting for the survivors but there aren’t half some impressive plants – and all grown from seed too. 

Friday 29th June 2012 – IT AIN’T ‘ARF ‘OT, MUM!

Well, maybe not quite this evening, but last night it was 31°C up here in my attic and that is going beyond ridiculous.

In fact, things reached such a pitch that I almost went and slept in Caliburn. I’m sure that it would have been cooler in there.

But by 09:00 I was up and about, and by 09:30 I was working.

I was doing some work on a few web pages and then one thing led to another, and pretty soon you begin to find out just how many other things there are.

So much so that I’ve ended up doing a slight redesign of my web pages and I wish that I knew enough to do more.

I really must learn how to do embedded menus and so on. My web design techniques seem to have stuck in a time warp.

I’ve also been dealing with the European Paper Mountain today and a load of that was filed away. There’s still about 20 times that much that needs to be dealt with but every little helps.

Rosemary and I went to Montlucon this afternoon and had a rummage around the shops.

I didn’t buy any wood because the wood at Brico Depot is appalling so I’ll have to go to the sawmill for that like I should have done in the first place. But I have the stirrups, some of the plumbing bits, the corrugated plastic sheets, the hinges, the strengthenign rod and all of the concrete post rings – 20 of them in fact.

Rosemary was disappointed too with Brico Depot. She had wanted some zinc guttering for her barn but the stuff that they had was all bent, knocked about and not fit for use.

In the end, on the way back we went to Bricomarché in Commentry. It was dearer there but it was in perfect condition. You pay for what you get.

I bet that you are all dying to know what I’ll be doing with them – I know that Krys is. But you’ll have to wait until I buy the wood and start to build it – I won’t be giving a clue away.

Aren’t I a meanie? 

Wednesday 27th June 2012 – 28 DEGREES CELSIUS …

… it was this evening at 19:15. So you can see what the weather has been like all day.

After having several days of mediocre weather, cool, wet and windy, too. So you can tell that there was something afoot.

chateau sur cher puy de dome franceAs indeed there was. We had another one of our walks. Bound to be a heatwave (or a torrential downpour) today.

You may remember from a couple of weeks ago that Marianne and I went off to do a recce of Chateau-sur-Cher. In her capacity as approved tourist guide for the area she is doing a programme of walks around rhe various villages.

It’s the kind of thing that interests me deeply as you know, so I’ve gone along as Minder. And here we are today in Chateau-sur-Cher

church chateau sur cher river cher allier creuse puy de dome franceI have said, on many occasions and at great length too, that here in rural France, the situation of many old churches gives reason to believe that they are sited on old historic fortress sites.

The mounds and the sometimes stunning defensive positions of the buildings underlines this – for example, look at the view that you have from the site where the church at Chateau-sur-Cher is situated.

Any nobleman bent on maintaining his power in the region (and many were as bent as they come) would have had a fortress up here in a flash as soon as he were to see the excellent position

church chateau sur cher river cher allier creuse puy de dome franceAnything passing on the road down there would be under his immediate surveillance and he would soon pounce in a twinkling of an eye to launch an attack or to exact a toll.

The valley in the middle is the River Cher, to the left is the département of the Creuse and to the right is the département of the Allier. We ourselves ae in the département of the Puy-de-Dôme.

In the days before the unification of France, these were all independent Provinces and with the only bridge over the River Cher for miles being situated just down there at the foot of the hill, he would be in a magnificent position to control the trade, and his fortress would have been pretty-much impregnible to a surprise attack from another province

church chateau sur cher puy de dome franceHow this would have all come to pass would have been that the nobleman back in the days prior to the arrival of the Romans would have stuck his oppidum up here straight away.

Christianity slowly came to the area and when it took hold, he would have himself been amongst the first to be converted, and he would have provided a little place somewhere in his oppidum for worship to be held.

During the passage of time as the region settled into more peaceful ways (remember we are long before the period of the 100 Years War which devastated this region) the need for a fort grew less and the population expanded.

church chateau sur cher puy de dome franceHence the need for a bigger church, and much less need for a fort. And in the end, the fort would fall into decay.

And that’s exactly what has happened here in Chateau-sur-Cher because during some archaeological excavations in the past, they did actually find some evidence to suggest this was indeed a fortified oppidum occupied by the Gauls.

chateau sur cher puy de dome franceBut the key to the village was the fort. And why the fort was there was because of the key position that the promontory held – over looking the only practical crossing of the River Cher for many miles either upstream or downstream.

A packhorse train of goods or a herd of cattle crossing over the bridge from the Creuse into the Allier or the Puy-de-Dôme and our noble could swoop on it like a hawk and exact an appropriate amount of tribute.

chateau sur cher puy de dome franceThat estaminet there would have been an exciting lively place 150 years ago in the days of pack horses, drovers and horse-drawn waggons, everyone stopping for refreshment after a long arduous travel through the mountains

Today though, the estaminet is long-since closed and the village is pretty-much abandoned. From a heyday of well-over 700 people living here 150 years ago, the number of inhabitants now totals a miserable 78.

The sites of many abandoned buildings that have crumbled away into nothing are quite evident, and many other buildings are lying abandoned, likewise to suffer a similar fate.

The exodus to the urban regions of France from little communities like this is tragic. As you know, on my own property I have the remains of half a dozen houses.

machinery moulin de chambon chateau sur cher puy de dome franceWe ended up going for a walk along the bank of the river heading northwards, because there was something important to see here, at least from my point of view.

There’s a mill – the Moulin de Chambon – down here and although it’s long-since ceased to function and its machinery is all dismantled today, it’s nevertheless quite an interesting place to be

moulin de chambon chateau sur cher puy de dome franceInteresting for several reasons too.

  • the water arrives via a system of weirs and locks, rather than the more usual millrace.
  • it’s a hybrid mill, in that the water powers a system of pulleys and that other machinery – not just a corn-grinding wheel – was operated here. There was even talk of a sawmill in one of the sheds.
  • it’s an undershot wheel ie where the water passes underneath, not an overshot wheel where the water passes over the top

. It’s such a shame that I couldn’t have a better view of it.

moulin de chambon river cher chateau sur cher puy de dome franceIt was a shame that there were so few of us out for our walk today. It was a really beautiful afternoon and this was, from my own point of view, probably the most interesting walk that we have undertaken since we started doing them.

We were ready for a drink after all of this and so Marianne and I headed back to Pionsat and refreshment. Nothing of course available here.

And this was when I noticed the temperature.

I nipped back home quickly where the water in the solar shower was still 36°C, and had a nice warm shower. I needed it too.

This evening, while watching one of the most boring football matches that I have ever seen, I sorted out a pile of paperwork. That’s not like me. I must be feeling the heat.

You’re probably thinking “what an exciting day” but I’ve not told you the half of it yet.

This morning I was up and about long before the alarm went off. Before 08:00 in fact, and that’s not something that happens every day.

I worked for a few hours on my web pages and then went outside for some more tidying up and throwing of stuff down at the dechetterie. That’s all gone now and I can move about comfortably in the barn where the Ebro is.

And it’s been a few years since I’ve been able to do that.

>Tomorrow I need to measure up for the stuff that I need for the next stage of renovations, and to do some washing if the weather stays fine.

I’m also planning some more shelves in the barn now that I have the space to stick them up.

Watch this space.

Tuesday 26th June 2012 – THIS PHOTO …

TIDY GARDEN LES GUIS VIRLET puy de dome france… probably won’t be all that significant to most of you but it certainly will be to Liz and Rosemary because they have seen the front of the house since I came back.

You have seen it too, in a general sort of way, and you would have seen how you couldn’t move out there, the weeds having grown so tall and so thick.

But anyway, there you are. I finished the weeding in front of the house this evening and I can actually see the pathway that I laid out all those years ago.

You can see the table and chair too, on the terrace thingy made of old pallets with an old tarpaulin underneath it. And wasn’t it lovely sitting on there to eat my butty at lunchtime, and even to eat my potato and lentil curry tonight?

All of the weeds, by the way, were pulled up by hand. Huge handfuls of the stuff. That was the hard bit

And can you see the herbs in their pots in front of the verandah? They really are going berserk and if I can have three or four days of dry weather I’ll cut them back and bring them up here to dry like I did last time.

That’s not all I’ve done either. I weeded the path that led down to the greenhouse and I’ve also weeded in front of the barn by the entrance to where the Ebro is stored.

I can now open and close the garage door.

As well as that, I’ve filled a few more bags of rubbish ready to go to the dechetterie at Pionsat tomorrow and while doing that I found the vertical-axis wind turbine that I bought a year ago and promptly forgot all about.

It’s currently stuck on the roof of Caliburn, held on by its magnetic mounting, but I will have to think of a more permanent way to attach it.

But it’s lovely being able to walk around in the garage part of the barn now, and I’ve not finished in there yet either. I’ve not found a roll of wire netting though, and I know that there’s one in there somewhere that I bought on my travels.

This morning I was up and about before the alarm and I spent 4 hours on the computer. I’m cracking on with these web pages but I’m only a couple of days from Québec and that’s something that will slow me down a little.