Thursday 19th July 2012 – I DIDN’T QUITE MANAGE …

… an early start this morning.

I was awake for much of the night with had another bad attack of cramp and that wore me out. So it was 09:00 when I finally rose out of my pit.

We did the usual bit working on the website and then for the rest of the day I was outside.

We had a few minutes on the wall with the SDS drill but the day wasn’t really bright enough to run that for any length of time and so I fixed the solar water heater instead. You may remember me saying that the tank fell down on my head yesterday afternoon while I was having a shower.

lean to repairing stone wall les guis virlet puy de dome franceThis afternoon I was working on the wall again.

Long-term readers of this rubbish will remember that the other two walls that I built, I erected stones in the vertical position at the outside and inside, and filled in between with a very lightweight concrete – a kind-of concrete wall with stone cladding.

Anyway, that’s what I’m doing here with this wall now.

Part of the wall had been built with very light breeze blocks – real cinder blocks even – so I’m smashing those one-by-one to use as the infill and then pouring concrete over the pieces to hold them in.

It will be a lightweight wall, but it won’t ‘arf have some strength.

I’ve made quite a lot of progress and I reckon that given a good day on there tomorrow I shall have about half of the wall finished.

All I’ll have to do then is to point it, of course.

Give me your opinion of this post
  • Excellent 
  • Useful 
  • Interesting 
  • Weird 
  • Surprising 
  • Boring