Monday 24th October 2011 – AND JUST WHAT ON EARTH …

…is happening here?

Yes, it’s absolutely ages before midnight and here I am blogging already.

What on earth is going on?

The fact is that I’m absolutely whacked. Three nights without much sleep have finished me off and I shall be in the arms of Morpheus before much longer.

But I dunno why I’m having these sleep issues. I know that I habitually keep late hours but what has been going on just recently is absurd.

moving cattle trough lean to les guis virlet puy de dome franceThis afternoon I carried on with moving the cattle trough in the lean-to. Here is a photo of how it looked after I’d been bashing away at it for an hour or two the other week.

What it looks like now is something else completely thanks to Terry lending me a concrete cutting disk and a huge sledgehammer yesterday.

They made quite short work of the bit that I can get to, and the rest of it will have to be done when I can get to it.

I did say that once I’d done that I would be starting on the pointing of the wall. However we’ve had a howling gale here today with winds gusting up to 20mph. I know that that isn’t particularly fast but if anyone thinks that I’ll be standing on top of a ladder 10 metres or so above ground in a wind like that then they are mistaken.

According to one of the litttle-used functions on the anemometer, we had 20:42 hours of wind in the last 24 hours and that is quite phenomenal. The wind turbines have been earning their keep today.

What I did do instead was to make a start on the framework that I’ll be using to make the dividing wall in there. That involved cutting up a few chevrons and shaping them,and cutting lets into the rafters of the ceiling in the lean-to.

And while I was doing that, the wind dramatically dropped. “Time for me to go and get the ladder out and make a start on the wall” you are probably thinking. But “not bloody likely”, as Eliza Doolittle once famously said, because we had a torrential downpour and it’s still raining now.

Instead, I did some tidying up and sorting out until knocking off time at 19:00 (I’m still on summer hours).

Seeing as I’m still on summer hours, this morning I was working on the website and I’ve put on line the reports for the 1st XI and 2nd XI matches from this weekend.

But Saturday night’s photos haven’t worked at all and I’m going to have to spend money on a decent lens to take better photos in the dark.

Tomorrow Liz and I are radioing, at Radio Tartasse. I wonder if I will have woken up by then.

Good night, everybody.

Sunday 23rd October 2011 – TODAY I HAVE SEEN ….

fcpsh fc pionsat st hilaire us menetrol football club puy de dome france… what is probably the worst game of football that I have ever seen in my life. US Menetrol were such a poor side that they could only manage to score four goals against the disorganised rabble that was supposed to be the FC Pionsat St Hilaire 2nd XI.

There were three types of player on the field for Pionsat this afternoon. We had those with inclination and no skill (but nevertheless, hats off to them for turning out because clubs need willing players like this), quite a few with neither skill nor inclination, and far too many of those with skill but no inclination.

fcpsh fc pionsat st hilaire football club us menetrol puy de dome franceIt was such a dismal showing that had I been in charge of the team, I would have gone home with the bus and left them to walk home.

But I’m not. And that was the root of the problem – there didn’t seem to be anyone in charge. And whoever it was who was supposed to be giving the orders was giving some pretty strange ones, that’s for sure. It really was an absolute shambles.

I shan’t say any more about it as it will be just gratuitous.

On the way down to Menetrol, I had the misfortune to be behind heaps of those kinds of drivers who think that 90kph is 70, 70 kph is 50, and 50 kph means that you get out and push. That started me off on the wrong foot anyway so it’s hardly a surprise that I was in a bad mood.

Afterwards, I went round to Liz and Terry’s to discuss the radio programmes, but we seemed to have spent most of the time dealing with lost hunting dogs.

Terry has very kindly lent me a concrete-cutting disc and a huge sledgehammer to remove this cattle trough, and Liz, apart from cooking a gorgeous tea, has made me up a food parcel. That is really lovely.

So tomorrow, I shall be removing cattle troughs and then carrying on with the pointing of the house wall. We are told that the fine weather will last until Wednesday.

Saturday 22nd October 2011 – AND THIS MUST BE …

… something of a new record.

I went to St Eloy les Mines this afternoon, rather late as it happened, and put my washing in the launderette seeing as there was quite a pile that had built up.

Anyway, once the machine had set off, it announced that the cycle would take 40 minutes to do.

And by the time the 40 minutes was up, I’d been to LIDL and Carrefour and I was back in the launderette. And for what I had spent on the week’s shopping, I had change back from €9:00 as well. Now, as I say, this must be a new record.

But my new plan is that seeing as I have quite a lot of work to do these days, I’m going to be doing the radio programmes on Saturday morning and then shopping in St Eloy les Mines when I’ve finished. And that seems to be working anyway because in 3 hours of work I’d done all four programmes.

Yes, I reckon that if I don’t go shopping until I’ve finished, it’s a good spur.

This evening the 3rd XI match at Pionsat St Hilaire was cancelled as the opposition couldn’t raise a team. Instead,I went and watched the 1st half of the match at Marcillat. Although the AS Marcillat team play at what is nominally 1 level higher in the pyramid (they are in a different region) Pionsat’s Ist XI wouldn’t have too much trouble in dispatching them on a good day.

fcpsh fc pionsat st hilaire football club puy de dome franceAnd talking of good days, Pionsat’s 1st XI played one of the numerous teams from Clermont this evening with a 20:30 kick-off, so I was back down there for the start.

They weren’t under too much pressure except down the left side of defence as usual and that was where they conceded a goal. But a substitution in the second half with a new player in the team shored that side up.

The central defence played splendidly with Alex and Julien in there – and Julien has improved immeasurably this season.

fcpsh fc pionsat st hilaire football club puy de dome francebut with Cedric scoring early in the game and this new left-sided player scoring a second, following up a loose ball (and if he can play like this every week he’ll prove to be an excellent signing), as well as two or three goals disallowed, Pionsat were never really in difficulty. They won the match with plenty to spare. in the tank.

But the end of the game was rather ugly as the opposition lost their cool and we had a brawl near the end and another one after the final whistle and it was all unnecessary.

And then afterwards we had the draw for the league cup quarter-final.

And Pionsat drew …. the team that had just played this evening.

This should be quite some match.   

Friday 21st October 2011 – TODAY WAS ….

… a quiet day or at least it should have been. But Terry and Rob came round to fix Lieneke’s barn and no-one can sleep through the kind of racket that those two are capable of producing.

But what about last night,hey? Temperature plummeted to -1.9°C. A minus temperature – winter is flaming well here, right enough. I’m even contemplating lighting a fire shortly if we don’t have an improvement

However, never mind that for a moment – three hours and more on the computer and my visit to Trois Rivieres is well-advanced.

Trois-Rivieres is on the north bank of the St Lawrence between Montreal and Quebec. It’s the oldest industrial site in North America and the newsprint capital of the world. In fact all of my visits to the area have been overwhelmed by the smell of wet paper from the pulp mills so I’ve always kept well clear. 

This year though I found myself in the town and my opinions of the place rapidly changed. The town seeps history from almost every pore and I’ve completely changed my opinion about the place.

This afternoon though I had to wait for Terry to move his van before I could get out to the post office and post that parcel. And I fell through the floor when I found out the price. I bet that it’s cheaper to fly to Canada and deliver it by hand. It makes excess baggage charges look a bargain

To the bank after that to sort out a few financial details, and then to Bill’s to fix his computer again.

This evening it’s POETS day of course and so I finished early – spending half an hour or so sorting some papers that date back to 2004. And there’s so many of them that it’s going to take a while.

Tomorrow it’s shopping and as I have so much to do it’s going to be a St Eloy les Mines quick half hour-type of shopping. And the washing is building up here and so I might visit the local launderette and sort it out.

>But I’m not really looking forward to tomorrow. I’ve finished all of my stock of Canadian vegan cheese slices and that is a catastrophe.

Thursday 20th October 2011 – I THOUGHT …

repairing stone wall collapsed lean to les guis virlet puy de dome france… that you might like to see like to see a photo of inside the lean-to now that the wall is finished for now. As I have said before,I’m quite impressed with it.

The part that I have built up is the part that has been pointed. The unpointed part is what remained after it fell down, and that will be pointed in early course. It depends how the weather holds out after I finish the house wall (yes, that’s the next task).

In fact, it occurs to me that the best way to judge how much work that I’ve done on the wall is to look at this photo to see what it looked like last year before I started in earnest.

So this morning I started on the web site again but not for long as Terry came round. He’d been working at Lieneke’s. It’s nice to see good friends and have a good chat about this and that, for a change.

This afternoon, I packed up an export order of bits and pieces – yes folks, my first export order. How about that? We are making progress all the time, which is very nice to see, and very welcome too. and once that was dealt with, seeing as how the weather wasn’t so good, I’ve started breaking the concrete food trough in the ground floor of the lean-to, as that’s where the wall that will support the steps will be.

Mind you, the steps won’t be there for long as I have a cunning plan about that.

But the concrete is tough there – it’s reinforced and armour-plated by the looks of things. I’ve broken the shafts on two sledgehammers, flattened two batteries on the SDS drill, and chipped about a hatful off with the pick-axe. I’m on the lookout for some dynamite now.

As for the frog that I told you about the other night, well thanks to Krys (and how nice it is to see you again), the frog now has steps in and out of the plant trough. He’ll probably fall in somewhere else now. 

And the temperature? 1.8°C at the moment. Winter is acumen in. Lhude sing Rudolph

Wednesday 19th October 2011 – THERE’S SOMETHING …

repairing stone wall collapsed lean to les guis virlet puy de dome france… really so satisfying about finishing a job that you started. And seeing as I started on this back in 2002 (well, sort-of, although I didn’t really get going until last summer), it’s high time as well.

Yes, I’ve finally topped out the wall at the end of the lean-to, as you can see in the pic. It took about three buckets full of stones,2 buckets full of gravel and about 4 buckets full of lime mortar, as well as about 3 hours of work.

Mind you, I’ve picked up an enormous lime burn on my left thumb and it isn’t half painful. I’ve tried soaking it in water but it still hurts.

So when I finished the cementing I tidied up in there and that’s a first isn’t it? And then I went down the garden and found one of the sheets of corrugated iron and put that on over where I’ve been working, to keep the rain off because we’ve had 15.5mm of that today.

And I have to say it – I spent 10 minutes just looking at the wall. I’m really impressed with how it came out and, of course, we’ll have an earthquake tomorrow so it will all fall down again – you just wait and see.

As for the weather, well it’s rained on and off for most of the day and the temperature has plummeted. It’s just 3.7 °C outside right now.

Apparently it’s snowing in Germany and snow has also been seen in Scotland and on high ground in the North of England. This is early and I don’t quite like the sound of it at all.  

Tuesday 18th October 2011 – It’s been progress on all fronts today.

This morning I had a good go on the website. For the last couple of days I’ve been making a start on the pages for the month I’ve just spent in Canada, and I’m actually on Day 4.

You might therefore be thinking that in another 10 days or so at this rate I’ll be finished, but I bet it will be nothing like. The first three days were pretty uneventful – it was on the fourth day that everything started to happen. I can see this being more like 10 months before it’s done.

stone wall repairing collapsed lean to les guis virlet puy de dome franceThis afternoon I’ve been up the wall again. Not as much progress as I would have liked, but the chevrons at each side of the wall that I have been doing – they are now nailed down to the beam and the outer and inner faces to the wall are now completed.

I’ve been infilling with crushed breeze block and a weak concrete mix and I’m about halfway up the centre of the final part of the wall. It won’t be long now until that’s done too.

It’s a shame that I couldn’t finish it this evening although I was doing my best. I was beaten by the dark (and I really DO mean dark) because it was 19:25 when I finally knocked off.

We also had some excitement elsewhere around the premises. I have a pile of dustbins, buckets and so on all around here in crucial places catching the rainwater to be used in the garden or in concreting and the like. A few days ago, the friendly frog who lives around here hopped into one and couldn’t get out. Luckily I noticed him and was able to liberate him.

This afternoon he had managed to do exactly the same thing. I saw him there when I went to wash my hands, and so I fished him out.

But badger me if, this evening when I went to fetch some water for washing up, he hadn’t gone and done exactly the same thing again.

That’s three times I’ve rescued him – if he ends up in there again tonight, well I’m afraid he’s on his own.

And we had some wind today – and serious wind as well, gusting up to 26kph which is not far short of a record for here since I’ve had the anemometer installed. All I need now is to fit the wind turbine up there and I’ll be happy. It’s high time it was in the place where it ought to be and doing the business  

Monday 17th October 2011 – THERE’S A LOT …

… to be said for being up at 08:00 in the morning at the first tinkling of the alarm clock. It  means that by the time you have breakfasted and done your 3 hours on the laptop, there’s still two hours before lunch.

And it’s just as well because it took me a while to empty Caliburn ready for this furniture removal, and then there was still some time to do another little job that I’m thinking of.

You might recall that the 12-volt immersion heater has stopped working and had something of a meltdown. I had a good look at it and what has happened was that the heater element has folded downwards and shorted out against the metal sides. This has

  1. produced a short-circuit that has melted all of the plastic causing the wires to short out (and why the fuse didn’t blow is a mystery to me)
  2. the arc that was created has burnt a hole in the bottom of the drum.

Despite the catastrophe (and it could have been 10 times worse if the insulation had caught fire) I was still impressed with the heat that must have been generated from just 500 watts and my surplus energy.

But at least now I know why the heater elements are fitted vertically and not horizontally – it stops them shorting out like this. The issue with that though is that you need running water into the tank to make sure that when you drain the tank it refills instantly so that the element is never exposed to the air.

That won’t work for me because of course I don’t have running water. My solution would be to go for a non-conductive material like plastic, it I would find a plastic tank that would take water up to 70°C.

Anyway, the result of this is that I have no dump load for my surplus energy and so I had a cunning plan.

>When I was in Canada last year I found some black sockets formy 12-volt circuit and I bought a dozen with the idea that they would be so different in appearance to the usual white ones that it would evidently have some significance.

12 volt fridge dump load les guis virlet puy de dome franceI cut out the wire from the dump load controller and put the black socket into the line. You can see it at the top right of this photo.

As winter approaches and the solar energy begins to die down, I’ve unplugged the fridge from the main circuit because I no longer have the charge to run it 24 hours. That will have to wait for next Spring.

What I’ve done is to move the fridge into where the water heater was and plugged it into the black socket. That way, from now on it will only switch on when there is surplus energy which isn’t too bad in winter. When there isn’t enough sun to run the fridge it will be cold enough to do without it anyway

It’s only 75 watts instead of 500 that the water heater gave out but nevertheless it’s better than nothing and it’s something useful to do with the surplus current.

What I also intend to do in the long run for the coming winter is when I wire in the big Studer inverter that I have, I’ll use the 600-watt one wired into the dump load circuit and couple up a small 400-watt oil heater that I have. I’ll put that in my room up here and it’ll take the chill off the place in the winter whenever we have plenty of sun.

This furniture removal this afternoon – well, I won’t say too much about it except that I was there at 14:00 as planned and Caliburn was all loaded before 14:30. For the 90km drive, we finally arrived at the house at … errr … 17:40 and it wasn’t until 18:10 that we got back under way.

So never mind the plans that I had about doing the washing and so on – we were lucky to make the Anglo-French meeting tonight in time. Still, what can you do in circumstances like this?

And so tomorrow I’m hoping to be back up the wall again. It might be finished this week – you never know.

Sunday 16th October 2011 – IT’S A MYSTERY TO ME …

FCPSH FC PIONSAT ST HILAIRE nord combraille football puy de dome france… how it is that Pionsat can play so dismally against mid-table opposition in their own division in the league and yet totally demolish a team two divisions higher up when they play in the cup.

Today it was the turn of Nord Combraille to come to Pionsat for a cup match and with the Miners being two divisions higher up, we were expecting something of a struggle.

But not so. Pionsat were all over a poor Nord Combraille side and demolished them completely, winning 3-1 at something of a canter.

fcpsh fc pionsat st hilaire nord combraille puy de dome franceYou can read the match report here if you like.

The thing that is probably even more bizarre is that once again in a cup match, Thomas takes the opposition by the scruff of the neck and while his display isn’t quite as scintillating as two weeks ago (but then not by all that much either), it was streets ahead of his performance for the 2nd XI (4 divisions below Nord Combraille) last week when it took me almost an hour to realise that he was on the pitch.

And we had a gorgeous day for it as well. Here I was complaining the other day about the weather and yet for the last two days we’ve had proper summer days, the kind that you would be pleased to see in August. This weather is certainly bizarre.

Tomorrow I’m furniture removing and then going to the Anglo-French group. But I can’t wait to carry on with the house here. I’m getting all keen and enthusiastic and that’s not like me at all these days, is it?

Saturday 15th October 2011 – WE SAW …

… the geese yesterday but this morning there was a horde of some other kind of bird assembling ready to fly off for the winter, and this is sad. In fact it’s more than sad – it’s depressing. Autumn is coming to a close already.

No idea what kind of bird they might have been. I know that I’m a keen birdwatcher, but that’s not concerned with any kind of bird that you might see flying about in the air over my property.

And so this morning after my 4 hours sleep (I was still up at 05:39) I was up and breakfasted and then I attacked Canada 2011.

lean to repairing stone wall les guis virlet puy de dome franceBut not before I had taken a shot of the work that I’ve been doing. You’ll see how much I’ve built up over the last couple of days, and you’ll also notice that the beam is in position where it should be.

When I restart work next week I’ll be building up the stonework so that it meets and infills the woodwork. And tipping cement and lightweight concrete into all of the gaps, that will hold everything nicely into position.

It’s all good stuff, make no mistake about this, and it’s coming along nicely.

In St Eloy les Mines I bumped into Bill and we went for a coffee and a chat to put the world to rights.

But in LIDL I also encountered a woman who was discussing things with her 4 year-old son “Do try to control yourself, Jasper”
Help! We are being invaded by Hooray Henries.

Back here my return was serenaded by the sounds of flute being played in welcome. Yes, it IS that time of the year and Lieneke and the others have turned up. And how well Lieneke looks. She’s dropped about 20 kilos over the last year and it really suits her. She’s probably losing years as the rest of us are adding them on. 

And no footy again tonight either. whatever am I going to do until tomorrow?

Friday 14th October 2011 – WINTER IS ON ITS WAY

geese fly south for winter les guis virlet puy de dome franceThis is just a small part of the huge flock of geese that assembled over my place this afternoon. They had been honking for about an hour and eventually they all put in an appearance right over me, coming in from every direction possible.

They circled around for a while, formed up in a huge echelon, and then departed hence. It wasn’t half impressive watching them do all of this and the noise was astonishing. But it is a fact that when they leave they take the sun with them, so I’ll be battening down the hatches and sorting out the firewood

And as as aside – why do birds fly south in winter?

Answer – “it takes too long to walk”.

And while we are on the subject of the weather, on the TV Monday night the weather forecaster promised us sun from Wednesday until next Monday. But I don’t know where it’s all gone too because we haven’t had it yet and the temperature has now plummeted.

fitting beam collapsed lean to repairing stone wall les guis virlet puy de dome franceToday was a momentous occasion outside on the wall of the lean-to because the beam is now in place where it ought to be. But it’s a bit of a disappointment because it’s about 0.5 inch too high in the vertical plane but about 0.5 inch too low under the chevrons. That means that the central beam is about 0.75 inch too high and the end where I’m working.

Ahh well.

Still, it’s progress I suppose. and from here on, the back-filling is pretty straightforward. It’s not going to take too long to finish off now and then I can plan my next step – always assuming that it doesn’t finish me off first.

But one thing is for sure – it won’t happen on Monday as I have a furniture removal to do – to Issoire.

Thursday 13th October – Just for a change …

… nothing happened today that was any different than the last few days.

I managed an early start for once and spent the morning on the computer. I have all of the Canada photos properly labelled and in some sort of order and so I’ve been sorting out my notes and putting the correct notes with the correct photos.

And that’s not as easy as you might think either. I’m … errr… somewhat disorganised. Anyway I’ve managed over half of that and if things go according to plan I can finish that tomorrow morning.

rebuilding stone wall collapsed lean to les guis virlet puy de dome franceThis afternoon I was back up the wall again and much of the time spent there was sorting stones so that I can find the best ones to use in the corner. That’s not easy either.

But anyway,I’ve now put the stones in right up to where the beam is going to go,and now I just need to find two stones for the side of the pillar. Once that is done and they are in place I can infill with stones and concrete and then drop the beam in place.

And when the beam is in place I can fill in the back wall behind it. That’s tomorrow’s work anyway.

And you can tell how carried away I was – it was well after 19:00 when I knocked off and that’s not like me at all, is it?

I’ve also finished the last of Tuesday’s courgette and lentil curry. That was a shame as I had been quite enjoying that. It’s fun to think of 1001 ways to use up a Combraiiles Courgette.

Wednesday 12th October 2011 – I DIDN’T ….

… didn’t do so well this morning.

Put that down to a 05:00 bedtime and you will understand. I’m having major sleep issues right now.

And so with what was left of the morning I spell-checked all of my Canada notes (and that wasn’t a 5-minute job either) and then started on the web pages. There are only about 800 photographs – something of a change from the 2500 of last year. I clearly wasn’t working hard enough

repairing collapsed stone wall les guis virlet puy de dome franceThis afternoon I carried on with the wall.

I put another two rows on that corner and infilled with stones and concrete. That should do the trick. Really, the stones are only the cladding and it’s the concrete that will be taking all of the weight of the beam and the roof.

Another two rows on there tomorrow and I’ll be able to put the beam in position. That should be fun on my own seeing as how heavy it weighs. But once it’s there I can build up the rest of the side wall.

I must admit that I’m looking forward to doing that and getting it finished. But I don’t think that that’s going to be any time soon

Tuesday 11th October 2011 – AND JUST FOR A CHANGE …

… I was up with the cock this morning.

But that’s enough about my disgusting personal habits, an early start meant a good morning on the computer and what with the glorious day that we had (summer is back) I put on line the Radio Anglais
website and also the updated footy website with the matches from the weekend. That’s a huge job finished, and finished quite early too.

I’ve even made a start on the Canada 2011 web pages, and that’s enthusiasm, isn’t it?

rebuilding lean to les guis virlet puy de dome france>This afternoon I went and attacked the wall. The breeze block that I had put in the other day had set nicely so I scavenged around for some decent square-faced stones from where the wall collapsed in 2002. It took ages but I found some really good ones and I slowly started to rebuild the corner. It’s a case of cementing two large stones carefully in place at the corner, and

then infilling behind them with several layers of stones and liquid lime mortar – building up little by little. Once the infill reaches the height of the corner stones, I can put another layer of corner stones in place and then infill behind them.
rebuilding lean to les guis virlet puy de dome franceWhile it’s all setting and I’m waiting for it to be dry enough I did some more pointing of the wall.

Anyway, I’ve now two rows of corner stones in place above the breeze block and if you think that this is slow progress, then you are right but it needs to be slow and precise.

The large cross beam that you can see will be sitting on that corner and will be taking the weight of the roof, and also the two sides that meet there will be passing their weight onto it as well. There’s not much room for error

Monday 10th October 2011 – AFTER ANOTHER …

… late night last night I wasn’t in too much hurry to raise myself this morning, even though for once I heard all of the various alarms.

Mind you, I wish I had hauled myself out earlier because summer has come back, and with a vengeance too. Nice, bright and blue even though the sun is rather watery.

And we are promised this weather until at least Sunday, although I’ve heard all of that before.

I spent the morning working on the football match reports from the weekend. I’ve done the 3rd XI and the 2nd XI reports, and I’m halfway through the 1st XI report. I’m hoping that I can finish that tomorrow and then turn my attention to the Radio Anglais site and bring that up to date.

After lunch, I made a start on pointing the outside wall of the lean-to at the corner where it’s pretty unstable. And I’m not sure that I like what I see there. It’s been pointed once but with cement. The cement has not adhered to the stones but to the old mortar in between. And as the water has infiltrated behind it, due to the absence of roof, the cement has worked loose and fallen out, taking the mortar with it.

And that’s the root of the problem here. What I’ve been having to do is to gently pry out the cement, rake out the loose mortar, fill the gaps with stones and then use lime mortar to point between the gaps.

repointing lean to wall les guis virlet puy de dome franceI now have it stable – well, after a fashion.

What I have done is to put a breeze block in at the upper corner and then I infilled behind it. That will give me something solid and level to start with, which is the most important thing to do.

I can build up from there tomorrow and see how far I can get. But it’s all a mess and the only real solution is to knock it all down and start again, and I’m not doing that.

At the Anglo-French group tonight, Christiane came along – the first time for ages that we have seen her and that was quite nice. Things are picking up.