Friday 8th August 2014 – WOW!

What a storm!

It was totally stonishing. About 8mm of rain fell in about 30 minutes round about 22:30. It’s a long time since I’ve seen anything quite like it. I even had to close the roof windows as it was pouring in on me where I was sitting, and that’s not supposed to happen.

Mind you, it had been brewing all day. When the boulangère came by this morning, she mentioned that there might be a storm a little later. And it wasn’t long after that that we had the fist lightning flashes. They kept it up from about 12:00 until about 15:30 so I was pretty reluctant to go up on the scaffolding during that period, otherwise it would have been me frying tonight. That’s the one disadvantage of having metal planks.

When i considered it safe to do so, I went up there. Well, not quite – I had to round up all of the tools and fittings that I needed for the job. And that took several attempts to make sure that i had everything up there that I wanted. I drilled the hole, a 16mm hole, with the Hitachi battery-powered SDS drill and that went into the stone like a knife through butter. It’s a shame that the batteries are becoming tired in it now, because it really is one of the most useful tools that I have around here. I must sort out some new batteries for it.

Fitting my home-made eye wall anchor was straightforward – with a little persuasion from a hammer it went into the hole that I had drilled, but tightening it up was something else. With a little too much force, I reckon, I sheared off the wedge that splits the interior of the anchor. Then of course I couldn’t extract the broken one, and so I had to drill another hole and start again. This time I didn’t use quite so much force when tightening it, so I managed not to break it.

Fitting the turnbuckle was straightforward, but then actually fastening the guy wire was almost impossible as the length of the turnbuckle put it too far away from the scaffolding for me to reach it properly. I was lucky that the wire was quite long, as I was able to put a loop in the far end, pass the wire around the hook on the turnbuckle and then around a pivot (the framework upon which the wind turbine is mounted) and with a rope in the loop that I made, pull it back towards me again.

With it securely tied around the scaffolding, I could perform a major feat of gymnastics, balanced right on the edge of the scaffolding on the toes of one foot, and reach right out to the wire to fasten the wire rope ties (three of them) to hold the wire together.

Then dismantling the temporary fittings that I had made, I could tighten up the turnbuckle. And to my surprise, it pulled the wind turbine perfectly vertical instead of leaning over about 5° to the north.

All of this took me until about 18:20 and so for the remaining 40 minutes I did some (but not much) weeding in the vegetable plots. And as I knocked off, it started to rain. “Perfect timing!” I said to myself. And then we got the lot a few hours later.

i’m glad that I’ve fastened the wind turbine with a second guy wire. With just one, it was pulling it out of the vertical and of course, one isn’t very secure. Ideally it needs four and while I can think of a way to do the third one (and i might even do it some day) the fourth will be difficult. Nevertheless, progress has been made.

On Monday, I’ll start to attack all of the rest of the jobs that need to be done while I’m up there. Let’s see how long it takes me to finish them.

Wednesday 6th August 2014 – I’VE SPENT ALL …

… afternoon looking for my special wall anchors. I’ve no idea where they might be and I’ve run out of places to look.

These are special wall anchors because they don’t have a standard bolt or a piece of threaded rod in them, but a bolt with an eye on the end and they are designed for fastening ropes and that kind of thing.

I’m not even sure that I have any, but I did at one time have one because it’s in the wall with one of the guy wires for the wind turbine fastened to it. However, I can’t possible believe that I only ever bought one of them. I must have at least another four lurking around somewhere. And I need one to use for the second guy wire of the wind turbine – one of the reasons why I’ve put up the scaffolding.

Mind you, in my quest for the wall anchors with eyes, I’ve found tons of stuff that I had lost (like a load of red wire terminals), stuff that I’ve spent ages looking for in the recent past (like one of the missing black jump leads), and stuff that I had forgotten that I had, like a toolbox full of the tools out of the Passat. And many more besides.

I’ve been tidying up too, and how, and repaired some shelves that I had built years and were about to collapse (it’s amazing how much my technique has improved). I’ve also ended u tidying all of the keeklamp fittings and sorted them out into sizes. I’ve also sorted out all of the ancillary fittings inclusing the turnbuckles and while most of them were size M12, I found an old one that was an M10.

And that gave me an idea.

I found a M10 wall anchor and took out the threaded rod, leving me with just the shaft. Then I dismantled the M10 turnbuckle and tried to fit the end with the right-hand thread into the empty shaft of the wall anchor. And much to my surprise, not only is it the same thread, it actually is just about long enough to reach down for the splitter.

home made wall anchor hook les guis virlet puy de dome franceSo now, about 15 minutes to knocking-off, I have my special Wall anchor. It’s not an eye but a hook which is not as good as an eye, but it’s the best that I can do and it might even work. I can fit that tomorrow and that will be the first job done, I hope.

Mind you, I’m impressed about all of the tidying up. I’ve not seen that part of the barn looking quite like this before.

Monday 9th January 2012 – THERE’S NO POINT …

… in having an early night and going to bed early (well, 00:15 is early for me anyway) if you wake up again at 4:45 and can’t go back to sleep.

Mind you as day started to dawn and I knew that it was soon time to get up, I managed to fall asleep again, and it was 10:15 when I finally woke up. So much for my good resolutions for New Year.

First thing that I did after breakfast was to sort out a design fault on the electric board that I had made the other day. The wires to the inverter were bent at an unnatural angle and the live was touching the earth tag. I had to tape over the ends to insulate them and then drill a hole in the board to run the wires round to the back so that they are lying straight and parallel.

wall anchor hook and eye wind turbine guy wire les guis virlet puy de dome franceOnce I’d organised that I stripped off some of the temporary roof on the lean-to, put some scaffolding up there and put a ladder up from there to the top of the wind turbine mast.

There I turned round the bracket that we had turned when we raised the mast last month and straightened out all of the guys.

I drilled into the wall, fitted a wall anchor with an eye, attached a turnbuckle and then fastened a guy to it all and wound it up to take the tension so that the last is held firm in that direction. That’s one out of the four guy wires sorted out.

After lunch I made a major advance – I started to put the plywood on the roof of the lean-to. It was flaming difficult too – it’s not easy pulling those sheets up on my own, I’ll tell you that, but I have three now fastened into position.

I’m being careful with the supporting chevrons, having learned my lesson from elsewhere where I’ve been working. I’m putting the sheets into position and then fitting the chevrons underneath them so that the sheets are supported in the middle and that the edges of each adjacent sheet meet up over a chevron.

I recall all kinds of bouncing sheets when I was nailing the tiles on when I did it in other places. I don’t want to do that here.

But starting to put the roof on the lean-to. Isn’t this progress?