Tag Archives: plywood

Wednesday 11th January 2012 – GOSH, IT WAS HARD THIS MORNING …

… just as I predicted.

but that’s enough about my personal life. Let’s talk about me trying to get out of bed.

And that was hard too.

And I now know what it means in these old novels when they say that “so-and-so walked gingerly to the door” because that’s just how I was moving this morning.

waterproof plywood damp membrane lean to les guis virlet puy de dome franceSo to change the subject, here’s another photo of the lean-to and its roof.

What you can’t see in this photo are any slates. And that’s a shame – I’ll have to buy an infra-red lens for that because by the time that I had knocked off work (18:10 if you are wondering) the first row was already in place.

And in the dark too, so I shudder to think what it might look like in the cold light of day, but I was determined to put the first row on, no matter what.

What else you can’t see are the three cut pieces of plywood to make the final length, and the screws that are holding down the roof sheets onto the chevrons, because it’s all now covered by a plastic membrane – the type that stops water passing through but allows water vapour to escape.

Yes, it’s all looking good on the lean-to roof and it can chuck it down now for all I care because at least it’s all weathertight.

It’ll be even better when all of the slates are on, whenever that might be. I can’t count on the weather holding off indefinitely – it did well to hold off for these last three days while I managed to do this much. Not like the Auvergne at all, is it?

I’m impressed by the way with the Ryobi one-plus drill that I’ve been using to screw the roof sheets on. Twice now it’s fallen off the roof all the way to the ground and when I’ve picked it up each time, it’s worked fine and carried on fixing the screws.

I reckon that if I had fallen off the roof twice, all the way to the ground, I wouldn’t be able to carry on screwing, that’s for sure.

TEST NOTE: If you see this, the snippet is working.

Tuesday 10th January 2012 – I THOUGHT THAT …

chevrons water resistant lean to roof les guis virlet plywood puy de dome france.. I would start today by showing you where I got up to last night.

Three sheets of plywood in position and tacked down ready to be properly fastened. to the chevrons

So first job this morning was to remove the rest of the temporary roofing, put two more chevrons on the roof and fit another sheet of plywood. Then I had to fit two chevrons at the near end either side of the wall, and fill in between them with concrete.

“Concrete in early January in the Auvergne?” I hear you say.

Yes indeed – you can see what the weather was like, and I was sweating while I was doing it too.

While the concrete was setting, I cut down the chevrons to 3650mm with my new saw which is ever so impressive – almost as impressive in fact as my galvanised steel dustbin.

I’m fed up of having nothing but rubbish around here so in the UK the other week I bought an expensive thick-bladed rough-cut saw and it went through those chevrons like a knife through butter. Should have bought one like this ages ago.

And why 3650mm of chevrons?

Well, the width of the lean-to on the slant is 3400, the sheets are 2440 by 1220 and so one sheet lengthways and one sheet sideways makes 3660 – enough to cover the lean-to with sufficient overhang without having to cut anything (and wielding a circular saw up a ladder is not an ideal solution for anything).

There’s sufficient room to put a barge board and fascia panel and to fit some guttering.

A good overhang is important too because they don’t do damp course around here. if the base of the wall is too exposed, the rain that falls at its foot will soak up in the stone and mortar. Apart from the issues of damp, there will be cracking the former and dislodging the latter from its position in winter by the “freeze-thaw” process. When water freezes, its volume is greater so water soaked up into the pores of stone or cement expands in the cold and cracks the stone or forces the cement. the force is so powerful that it was recognised as an established stone-breaking process thousands of years ago

Anyway, when the chevrons had been cut I mauled up another sheet (and they aren’t half heavy doing it like that) and manoeuvred it into position sideways across the ends of the far two sheets that are on there lengthwise, and then screwed it down.

After lunch I had to move the old scaffolding that was there (the one that I’d liberated from a skip in the dechetterie at Commentry in 2000), and seeing as how it had been there since 2001 that wasn’t easy either. It involved cutting down a few trees that had grown into the way (so there’s the firewood for next winter and isn’t this new saw really good?), clearing the ground away and removing all kinds of bits and pieces.

waterproof plywood lean to les guis virlet puy de dome franceOnce I’d done that, I then had to erect the new kwikstage scaffolding that I had brought back from the UK the other week.

That took ages, and I don’t know why, and then I just about had enough time to lift up another sheet of plywood and screw it across the bottom of the other two sheets before it went dark.

And you can see where my concreting from this morning went.

18:10 when I finished and I was shattered. But it wasn’t being shattered that stopped me – it was the losss of light. I’d still be there now if there was light enough to work.

But I have a feeling that I’m going to pay for all of this tomorrow. I’m not as young as I was.

And so tomorrow I need to cut three pieces to make the covering for the final part of the roof, climb all over the roof screwing all the sheets down properly, and then cover it with a layer or two that breathable plastic membrane to keep out the damp (a good buy, that industrial hammer-stapler).

If I can get that done tomorrow that will be where I want to be. And then I can start nailing down the plastic slates.

TEST NOTE: If you see this, the snippet is working.

Monday 9th January 2012 – THERE’S NO POINT …

… in having an early night and going to bed early (well, 00:15 is early for me anyway) if you wake up again at 4:45 and can’t go back to sleep.

Mind you as day started to dawn and I knew that it was soon time to get up, I managed to fall asleep again, and it was 10:15 when I finally woke up. So much for my good resolutions for New Year.

First thing that I did after breakfast was to sort out a design fault on the electric board that I had made the other day. The wires to the inverter were bent at an unnatural angle and the live was touching the earth tag. I had to tape over the ends to insulate them and then drill a hole in the board to run the wires round to the back so that they are lying straight and parallel.

wall anchor hook and eye wind turbine guy wire les guis virlet puy de dome franceOnce I’d organised that I stripped off some of the temporary roof on the lean-to, put some scaffolding up there and put a ladder up from there to the top of the wind turbine mast.

There I turned round the bracket that we had turned when we raised the mast last month and straightened out all of the guys.

I drilled into the wall, fitted a wall anchor with an eye, attached a turnbuckle and then fastened a guy to it all and wound it up to take the tension so that the last is held firm in that direction. That’s one out of the four guy wires sorted out.

After lunch I made a major advance – I started to put the plywood on the roof of the lean-to. It was flaming difficult too – it’s not easy pulling those sheets up on my own, I’ll tell you that, but I have three now fastened into position.

I’m being careful with the supporting chevrons, having learned my lesson from elsewhere where I’ve been working. I’m putting the sheets into position and then fitting the chevrons underneath them so that the sheets are supported in the middle and that the edges of each adjacent sheet meet up over a chevron.

I recall all kinds of bouncing sheets when I was nailing the tiles on when I did it in other places. I don’t want to do that here.

But starting to put the roof on the lean-to. Isn’t this progress?

TEST NOTE: If you see this, the snippet is working.

Thursday 1st December 2011 – GOING TO BED EARLY …

… does you no good at all if you roll over onto your staples at 04:00. It’s flaming painful and you can’t go back to sleep again.

And so I was up early again and breakfasted, and then I went out to cut more wood. That’s a couple more of the old chevrons and the tree trunks from 2 years ago all ready to burn in my nice new wood stove, with which I am almost as impressed as I am with my galvanised steel dustbin.

But then I had another idea and I cleared a space near the big front gates and laid out a couple of pallets. And then I moved one of the wood piles – the one that was at the side of the lean-to. That’s now on the pallets right at the front of the house and will be easy to get to in the winter, whenever that might be.

That pile of wood was formerly at the side of the lean-to on a concrete pad that was formerly the base of a chicken coop. This concrete hardstanding is now covered with plastic roof tiles – I did a safari around the garden and hunted down all that I can find ready for doing that roof, whenever that might be.

I also took out the plywood from the back of Caliburn and I’ve stood that upon the concrete pad. Even though it’s for exterior use, I’ve covered it up with a tarpaulin to protect it for a while from the weather.

All that’s left in Caliburn is the window and that’s rather heavy. But I have a cunning plan for that, more of which anon.

When it went dark I fetched a shelving unit that I had forgotten and I have put it in what will be the bathroom. I’ve started making a tour of the upper floors rescuing tools and so on, so that I know where everything might be.

But that’s not so easy as there’s just so much stuff. I really ought to have a good tidy up sometime.

TEST NOTE: If you see this, the snippet is working.

Tuesday 29th November 2011 – I’VE BEEN SPENDING …

… my money again.

And if I keep on spending it like this I won’t have any left.

First thing was to go to Marcillat in order to record the Radio Anglais programmes for Radio Tartasse with Liz.

And from there it was to Montlucon.

At LIDL I bought nothing out of the ordinary but at Auchan I bought as well as the usual stuff a little present for Rob and Nicolette for having looked after me, and also a battery pack seeing as all mine are duff. There it was on sale and I said that at €29 it would be a good deal. But with an air compressor included and selling at €22.95 it was an even better deal.

At Brico Depot they had the plywood that I wanted. And 2mm thicker, it cost €9 less than at the other place. And so I now have all that I need. I’m not sure why though because I don’t have the scaffolding to fit it now, as I said yesterday.

What I can be doing instead though is to build the greenhouse but would you believe I forgot to buy the perspex for the roof.

D’ohhh! That was no good.

There’s an issue over my tubing as well. I can buy it from the steel mill at Montlucon but would you believe that a huge place like that (so huge it has its own railway network and locomotive – which you have seen before) they don’t have a bender.They’ve given me an idea where to go and so I’ll follow that up.

And I have my window! Hooray!!!! That’s safely in the van now.

But here’s a thing.

You’ll have noticed without doubt that I have been strangely quiet just recently on the subject of the front door that I would be fitting to the house. But there’s a reason for that. Brain of Britain has done it again and bought a door that opens the wrong way. Mind you, it was at a give-away price in a sale so there’s no harm done there.

But a casual chat with the sales people at Lapeyre revealed that the “exotic wood” selection – the selection from which I have chosen all of my windows – is being discontinued in February. And as a result, they’ve started a clearance sale. The door that matches my windows – a big one with double glazing all the way down the front, is just €374.

That’s too good a deal to miss and so I have bitten the bullet. Now I shall have to get working.

At Rob and Nicolette’s I gave them their prezzy and thanked them for their help the other day. I was grateful for the effort that they took.

But with me forgetting all sorts of things today, this bang on the head doesn’t seem to have helped me any.   

TEST NOTE: If you see this, the snippet is working.

Saturday 12th November 2011 – I’M GOING …

… to bed in a second.

Yes, I’m thoroughly exhausted and I don’t know why. Probably the early start this morning had something to do with it.

Up with the alarm waiting for a phone call for this photo safari thing, and it turns out that I had not been patched in to an earlier e-mail circular and so I’d missed the point of this trip out. But anyway it didn’t take us long to do what it was that we had to do.

motorised hang glider commentry allier franceThis afternoon, seeing as how the weather was so beautiful I went to Commentry to do my shopping there.

And while I was in the car park of the Les Bonnes Affaires I was buzzed by one of these motorised hang-glider things passing low over the town. I was trying to think where he might have come from because there’s no suitable cliff in the vicinity off which to leap into the ether – unless he can run with his feet fast enough to make a clean take-off.

And I wonder what the rules might be about low-flying over a built-up area like this

badly sited solar panels commentry allier franceWhile I had the camera out, I noticed another example of poorly-sighted solar panels – over there on the roof of that bungalow. Facing full west they are, so they don’t receive a glimmer of sunlight until early afternoon.

These “become a producer of solar energy and sell to the electricity board” high-pressure salesmen have struck again. It’s hardly surprising that the industry has such a bad name when they do things like this.

I did make a couple of interesting discoveries though. And they were both at Bricomarche.

  1. they have a huge pile of water-resistant 8mm plywood at €39 a sheet of 2.5×1.25 metres. It’s expensive all right but it’s what I need for the roof of the lean-to and they do have it in stock.
  2. they also have the stove that I want for downstairs. A woodstove with an oven and with a central heating boiler built in – for €1499 too. That’s exactly what I want, because the sun will heat the water in the summer and I need something for heating it in the winter. If this does everything, it will be perfect. I can even do cooking with it as well.

But the real reason for going to Commentry was that with the weather being so nice I could nip down the road to Neris-les-Bains for a swim. It was glorious in there – the water just right and the pool quite warm as well. Shame it can’t be like that all the time.   

fcpsh fc pionsat st hilaire football club de foot us menetrol puy de dome franceAt the footy tonight the 3rd XI match was cancelled as the opposition couldn’t raise a team, and the first XI went down 2-1 to a team that they had played off the park, something of which they seem to be in a habit of doing

I’d tell you much more about the game but enough of this for now. I’ve fallen asleep twice already while typing as far as this, and if I don’t get a move on I’ll be ……..THUD THUD

…….ZZZZZZZZZZZZZZ

TEST NOTE: If you see this, the snippet is working.

Friday 14th August 2009 – WE HAD A GOOD DAY TODAY.

kwikstage scaffolding damp proof membrane plywood les guis virlet puy de dome france Firstly we dismantled the scaffolding that was in the roof space.
Secondly we fitted the rafters.
Thirdly we took one of the rafters out and replaced it with another new one that we xylophened and painted
Fourthly we cemented the rafters in position
Fifthly we fitted some of the hardboard on the roof
Sixthly we went to Montlucon to get some more hardboard, the guttering (and why have they run out of guttering joints AGAIN? Tons of everything else but no blasted joints for the second time) and a few other bits and pieces
Seventhly we fitted the rest of the hardboard
Eighthly we fitted the damp-proof membrane (white this time as we’ve run out of black)

Terry piddled off after that (who can blame him? He’s worked hard) and I measured up, cut, xlophened and put the first coat of paint on the fascia boards.

Tomorrow I’ll be fitting the fascia boards, loosely attaching the guttering (in the absence of joints) and then starting the tiling. And in between all that I need to go to St Eloy for shopping.

And talking of Terry, I want you all to know how well I treat my workforce. Hottest day of the year so far (38.6 degrees and almost 84 amp-hours from the solar panels on the roof of the house). And so I treated him to a bottle of ice-cold coke. Yes, none of your 22 cents on a bottle of water – a whole 1 Euro 50 cents I spent today.

My generosity knows no bounds.

TEST NOTE: If you see this, the snippet is working.

Thursday 23rd July 2009 – THERE’S NO PICTURE TODAY, FOLKS.

We woke up at about 08.30 today to torrential (and I DO mean torrential) rain and thunderstorms. You should have seen the water cascading down the road – it was impressive.

well, not so impressive for working on a roof so we had something of a leisurely morning.

And just as we were settling down for the day the weather dramatically cleared so we went chaud-pied round to my place and the roof.

Chez moi, the weather wasn’t so nice – grey and windy. But that’s the beauty of living round here. The Combrailles is the junction of three different climatic zones (the Mediterranean, The Atlantic and the Continental European). Followers of my outpourings in all its previous guises will recall my discussions about the constantly-changing (and sometimes dramatically so) weather as the fronts collide above my head.

Added to that, the area is an old rocky plateau that is riven by deep valleys and gorges so that each valley has its own little micro-climate and that can often be confusing.

But anyway ….. we trimmed the plywood on the roof and then put on the covering sheet of damp-proof membrane. And that was no fun either, fitting a 10-metre square sheet on a roof in a howling gale.

After lunch I dangled over the roof fitting the tiles with the aid of Terry’s home-made tile hod. I built up the right-hand corner all the way to the top (this is the bit that takes the time – the rest is just quick nailing-on) but then we were driven off the roof and into Caliburn by a torrential downpour (hence the lack of photos).

Back here, it was bright sunshine and totally dry, which just proves my point about the different climates.

We had another marvellous lunch though thanks to Liz. And in the middle Terry announced
“Forget eBay – forget the lottery. If I could clone Liz I would be a millionaire”
“Yes, I would have a Liz clone” I offered
“Forget it, Eric. You’d be trampled to death in the stampede”

TEST NOTE: If you see this, the snippet is working.

Wednesday 22nd July 2009 – DESPITE THE RAGING HEAT THIS MORNING …

plywood damp proof membrane aspire recycled plastic slates space blanket insulation les guis virlet puy de dome france… we’ve covered all of the back of the roof now.

All of the insulation is on and you can see that the waterproof plywood is on there covering it up. Most of the waterproof membrane is on too, and half of the slating is done.

It was hard work mauling everything over the top of the roof and with the weather the way it was, it called for frequent pauses that at one stage had us both dozing off.

Terry, having worked on the insulation which reflected brightly with the sun, developed a bit of a headache and asked if I could produce any tablets. Nothing like that round at my place so I wandered off to the Dutch neighbours’

Not a big choice in the medicine cupboard but some unidentified pills looked hopeful.
“They look like Tera’s “Morning After” pills” suggested Tijas, casting aspertions on his sister’s character.
“Actually, I think they might be stuff that Tera keeps for her horses”added Guus.
“Take them anyway” suggested Lieneke. “They might work”

But judging by the way that Terry was running up and down the ladder and swinging from the rafters in the afternoon, I’m sorely tempted to go round tomorrow to see if Guus and Lieneke have any more.