Tag Archives: threaded rod

Friday 29th April 2011 – I finally got onto the greenhouse today.

Just for a change, the weather this afternoon was quite reasonable (well, mostly), and so after the customary couple of hours on the Newfoundland website I went and hunted down some wood.

building greenhouse chevrons les guis virlet puy de dome franceThe big thing though is that I don’t have enough. I’m building the front and back out of chevrons, and the two sides out of demi-chevrons. I need about 10 of each but I only have 6 chevrons and 4 demi-chevrons so I’ll have to go to the sawmill next week.

But with 5 of the chevrons I made the back of the greenhouse. It’s going to consist of two uprights 2m40 high and 3 cross-pieces 3m20 long. The cross-pieces will be let into the uprights at ground level and at 1m95- That makes about 1m88 for the windows, which are 1m875 tall.

The third cross-piece will be let in at the top and this leaves a run of about 38cms the whole length. I’ll be dividing that into 4 pieces (72×38) and buying some cheap glass to fit into there.

But making it out of chevrons is going to make it heavy so I’m going to have to take the pieces down to the greenhouse base and assemble it in situ. I don’t fancy my chances of assembling it and then having to carry it down there.

But learning from when I made the verandah, I need to prepare the uprights and then pre-drill them before I assemble the thing. Trying to manoeuvre it all into position and then drill it will be almost impossible. It was bad enough with the verandah and that was smaller as well as being made with just demi-chevrons. I’ll be joining the front, the sides and the back all together with stud iron (or threaded rod as they call it these days) as I doubt that there will be coach bolts long enough.

And tomorrow it’s shopping.

Wednesday 11th August 2010 – We’ve been at this roof all day.

We started off by hanging a chevron (or rather two chevrons fastened together to make one long one) off the side wall of the house to attach the roof beams to. And that would have been so much easier if the holes for the anchor bolts hadn’t been drilled so deep that I needed to hunt down my lengths of threaded rod. And it would also have been easier if we hadn’t have got the SDS drill bit stuck in the wall!

kwikstage scaffolding roofing sloping wall roof lieneke les guis virlet puy de dome franceBut once we had organised that we finished building up the wall we started yesterday and then made a start on the two others. We need to keep these two level with each other so that we can cover them up with the roofing sheets at night.

Terry was doing the bricklaying, Simon was cutting and I was labouring. And it’s hard work mixing load after load after load of lime cement and then in my spare time bagging sand (we had to go down to the quarry with the Sankey trailer to buy another load).

.

roofing sheets sloping wall roof lieneke les guis virlet puy de dome franceBut we weren’t out there for all of the afternoon – we called it a day after a while because it’s absolutely p155ing down outside. You can’t work outside in this kind of weather.

We heaved the two left-over sheets from my barn roof onto the area where we were working to keep the rain off our working space and Lieneke’s bathroom and then we all went home. I for one don’t fancy the idea of mixing cement with an electric cement mixer in the pouring rain.

Shocking, what?

But all of this work is wearing me out – so much so that when I got back here I crashed out for a bit. I need to keep my energy for tomorrow