Category Archives: Les Guis

Saturday 28th January 2012 – IT JUST GOES TO SHOW …

HEAVY SNOW FALL 2012 les guis virlet puy de dome france… that those people in football clamouring for a winter break mid-season quite simply don’t have a clue about whatever it is that they are trying to say.

Here we are in the Puy-de-Dôme, having had our 6-week winter break in the mildest winter in the area since records began, and the football season restarts this evening.

And today we have had the heaviest snowfall of the winter and so all the matches are postponed.

So much for the winter break

But not that I am complaining too much. I spent the morning and some of the afternoon working on my presentation of The Trans-Labrador Highway for the local village social evening in a month’s time. and I’ve managed to reach the outskirts of Goose Bay – i.e. well over halfway.

It’s an ill wind that doesn’t blow anyone any good.

But at about 13:30 the snow stopped and we had a little thaw. That was the cue for me to race off to St Eloy and so some shopping.

And I was back by 15:00 with the usual stuff, but also two Harry Potter films, the director’s cut versions, for €9:99 the pair. I’ll have to see what Herry Potter is up to – so far I’ve managed to avoid those films (except for one that I caught a glimpse of – in French – with Marianne over Christmas).

This afternoon I’ve turned my room around again. I’ve done a lot more sorting out, repositioned the furniture and by the time you read this I will have the bed back where it used to be. Only this time, with a proper array of chests of drawers behind it for the clothes.

What inspired this was the fact that the new large set that I bought in IKEA in the spring, and the medium sized set that I acquired at a brocante 18 months ago fit together nicely and are exactly the right size to fill one of the alcoves.

But I’m surprised at all of the bedding and stuff that I seem to have acquired since I emptied out Expo. I can see me having a really good sorting out one of these days.

I’ve left Caliburn on the road at the top of the lane in case the weather continues to turn nasty. From there I can drive him out.

Because tomorrow afternoon, Terjat, who I saw last Sunday in a basement Allier 3rd Division clash, are at home again. If I can move around, I’ll go for a nosey to see if they really are as bad as they looked last week.

Friday 27th January 2012 – I CAN ALWAYS TELL …

… when I’m enjoying myself when i’m working. It’s when I suddenly notice that the light has gone and it’s 18:15 and I’m still out there happily working away.

And so it was today

I did the customary pile of woodcutting and now the woodshed is looking quite impressive. There’s probably now enough cut to last me for next winter as well and there’s still a load to do out by the barn.
And then there’s all the wood from last winter, that’s still down the fields.
And then there are all the chevrons off the house roof and the barn roof.
Wood isn’t something that I’m going to be short of for a while

air 403 wind turbine replacement metal blades les guis virlet puy de dome franceOnce I had done the wood, I made a start on the wind turbine, and that is now in position.

Doesn’t it look smart with its new stylish aerodynamic blades. But I shall have to stop mounting all of these wind turbines. I’ll end up being arrested.

It wasn’t as easy as you might think, organising this wind turbine. But then again, nothing ever is when I’m involved, is it?

It all started to go wrong when I tried to mount the hub onto the spindle. And immediately the bolts holding the blades to the hub fouled the casing.

So I turned the bolts round so that the threads were exposed – hardly aerodynamic but it all fitted.

Then, tightening up the hub, the hub ground out against the casing and locked up the blades. That meant using a couple of packing washers underneath the hub.

One I had, the correct size of diameter, I had to file out the hole to 19mm. The second one, I had the correct sized hole but the diameter was wrong so I had to grind the excess off with the angle grinder and the bench grinder.

So instead of an interference fit, I now have three extra faces and so under a great deal of wind pressure, I can see the faces sliding instead of the blades turning.

Won’t that be fun?

Much to my surprise, the wiring was pretty straightforward and didn’t call for any major revision. But putting it into position was something else. I didn’t have a scaffolding pole long enough and so I had to join two together and that’s no fun trying to do that on a ladder with that kind of weight at that height pressing down on your shoulders.

It’s for that reason that, after much cursing, I invented the wind turbine pole lifting handle, and I was astonished at how easy it was once I had a lifting handle in place.

I had to lower the anenometer though – the wind turbine was fouling it

12 volt external electrical wiring air 403 wind turbine les guis virlet puy de dome franceWind turbines need a load in order to work, and so I’ve wired it directly to an external weatherproof 12-volt socket, and to the socket I’ve wired a 12-volt 100-watt halogen light.

The faster the wind turbine turns, the brighter the light will become.

It reminds me of Doctor RV Jones and his experiments into the cathode ray tube. In his book Most Secret War, one of the best books I have ever read, he describes that they tentatively connected two lorry headlights to the tube, hoping for a faint glimmer of light. Instead, they managed to illuminate the whole building before the headlights blew out with the intensity of current.

Wouldn’t I like to have something like that with this wind turbine?

Thursday 26th January 2012 – I DON’T SEEM …

… to have done very much today.

Mind you, that’s not very much of a surprise considering that I managed to sleep through all of the alarms in here this morning and was … errr … somewhat late in raising myself from the dead.

In fact, much of the morning was spent sorting out the wood that is leaning against the end wall of the barn, and then sawing up a dozen or so lengths.

two storey wood shed les guis virlet puy de dome franceThe strange thing is that while the woodpile is slowly increasing, the number of lengths of uncut wood standing up against the wall doesn’t seem to have decreased.

Perhaps I have hit upon the secret of the self-reproducing wood supply – something that reminded me of the story of the Irishman, granted two wishes by his fairy godmother, asked for a bottle of Guinness that refilled itself every time he poured some out of it.
“And your second wish?” enquired the fairy godmother.
“I’ll have another one of those bottles”.

LED light 12 volt domestic circuit electric wiring les guis virlet puy de dome franceThis afternoon I carried on with the wiring in the upstairs of the lean-to.

Most of that time was spent looking for equipment of course, but I now have two lights and two pairs of 12-volt power sockets. They are all wired up, but they aren’t wired into the circuit of course – I need to drill a 40mm hole right through the stone wall into the house to do that, and that’s something that is going to have to wait for a bit.

I’ve a drill that will do it – a 1050-watt SDS drill, but with the current that it draws, you need a brilliantly sunny day. And while a strange golden thing did pop out from behind a cloud for 5 minutes, it’s been about 9 days since we have seen the sun.

It shows just how lucky I was with that little dry spell earlier in the month that enabled me to do the roof of the lean-to.

Regular readers of this rubbish in one of its several predecessor forms will recall that I bought 2 x 400-watt wind turbines from the manufacturers in Flagstaff, Arizona, in 2002. One of them flies proudly above the barn but the other one is in the back of the barn because the blades on these turbines are rather brittle and I’ve ended up having to make up one set out of the two that I had originally. And the manufacturers never ever replied to any of my mails asking about buying s new set of replacement blades.

So a couple of weeks ago I bit the bullet and contacted a company in the USA that makes parts for home-build wind turbines, and I’ve bought a set of blades from them, complete with hub, to fit on the other wind turbine.

In what was left of my working day, I’ve assembled the blades onto the hub unit and what I intend to do tomorrow is to resurrect the abandoned wind turbine and stick the blade and hub assembly onto it, and then shove it onto a pole somewhere where it will catch the wind.

These blades have the lowest drag co-efficient of any after-market wind turbine blades and so I’ll be interested to see just how they perform.

Wednesday 25th January 2012 – HAVING RUN …

two storey woodshed les guis virlet puy de dome france… out of room to store firewood once it’s been cut, I’ve now invented the two-storey woodshed – and I bet there’s certainly something narsty in that!

It’s become something of a necessity to find a space to store the wood these days with all of the wood that I’ve been cutting up just recently and having acquired a cement mixer and needing a place to store it out of the weather.

The logical thing to do is to build a lean-to shed, out of old scrap beams off the house roof and the corrugated iron sheets that I took off the lean-to roof, probably on the car park up against the end wall of the barn.

But for this I need to move all of the wood that is leaning up against that wall, and the easiest way to move it is to cut it up into firewood-sized lengths and stack it somewhere.

Hence the two-storey woodshed.

Of course this isn’t going to be its permanent home, but it will give some kind of shelter to the wood for now.

And so this morning, as well as building the woodshed, I cut up a yet another load of wood. Some of it was quite thick and it showed the benefit of buying a decent saw.

And it also showed the benefit of buying a wood grenade – something similar to a large chisel but with a point, not a blade, and four serrated sides. Stuck into a log of wood and wallopped with a sledgehammer, it splits the log cleanly and effectively into a more-manageable size.

This afternoon I noticed, to my surprise, that the batteries on bank 2 of the barn were fully-charged. And that was a surprise in this weather, I can say. Yes, miserable, wet and depresssing – but that’s enough about me.

So with the batteries fully charged, I decided on a change. I disconnected them and connected up a couple of others, to let them charge up for a few days to see what they might do.

Following that, I sorted out the extension leads and put them upstairs in the lean-to. I may as well use it now I’ve built it.

And that led on to another idea, and I’ve started to install lights up there. Not that there’s much need because I noticed that at 18:00 when I knocked off work, the evening was still light. Yes, the nights are getting shorter again.

Tuesday 24th January 2012 – WE WERE RECORDING …

… again this morning. This time in Marcillat for Radio Tartasse.

We finished the “winter driving” features and started on a new topic, which is the “talking rubbish” bit – may as well try to keep the programmes in sync.

But in a startling piece of news, I’ve been asked by Radio Tartasse if I would present a Sunday-night rock music show. Now, that’s something interesting and I’ll have a go at working something out for this. It’s always been an ambition of mine to do something like this.

Back here I decided in view of the miserable and depressing weather that I would stay in and make headway on my Trans-Labrador Highway presentation.

But first I repaired the doorway into the attic room. The top hinge has pulled out of the door frame (which isn’t all that surprising because it’s only a 10mm piece of hardboard) and the door has been falling off.

But while I’ve been tidying up in the barn I found some 400mm strap hinges and so I screwed one of those to the top of the door – having first wedged it into position. Now it opens and closes perfectly.

Second task was when I went to clean the glass door to the stove, I noticed that part of the sealing gasket had fallen out. No wonder it’s not drawing properly and the room is filling slowly with smoke.

Luckily I have some fireproof mastic and so I sealed it with that, and it worked so much better after that.

I didn’t get much done at my presentation though, as I crashed out for a few hours. I’m getting over-tired again.

I did manage to wake up in time to cook tea, and I made myself a spicy aubergine and kidney bean casserole that will keep me going for three days. And it’s the best I’ve ever made, it really is.

But I’m off to have an early night. If anything, crashing out has made me even more tired.

Monday 23rd January 2012 – I’VE BEEN SPENDING …

… my money again today.

Yes, doing my “Imelda babe – going shopping, shopping for shoes” bit (and quite funnily, I was listening to Golden Heart, the album from which the above-names track is taken, on the way to Liz’s this morning).

The boots that I bought in a Hudson’s Bay trading post in Canada 15 months ago died a death over Christmas (the sole split) and the canvas shoes that I use for wandering around here aren’t really suitable for much.

And a chance glance across a busy road from the Auchan on the outskirts of Clermont-Ferrand revealed a sale on at a shoe shop

So I’ve now acquired a pair of black leather boots, not exactly what I wanted but they look fairly solid and 50% off the retail price of €59 made it look like something respectable, and they will keep my feet warm and dry for the foreseeable future.

But that wasn’t all.

They had some boots that are a kind-of cross between wellingtons and après-ski boots, with thick soles and fur lining and looking pretty solid, and all for €22 as well.

Having frozen my feet off at the football over the weekend and being up to my neck in mud around here as well, I decided that a pair of those wouldn’t go amiss either – for going to to footy and for working outside in the bad weather.

Two pairs of footwear – you really WILL be calling me “Imelda” now.

So what was I doing in Clermont-Ferrand this afternoon?

Well, we’d been to Gerzat this morning to record the radio programmes for Radio Arverne – spending a lot of the time talking rubbish as I predicted.

But I’m running low on soya milk and not having been to Montluçon and the Auchan there for a while, we decided to multi-task and visit the Auchan on the outskirts of Clermont-Ferrand, which is only a cockstride away from the road that takes us home.

And the rest is history.

Back at Liz and Terry’s, I had a really nice surprise.

You may remember that when we were doing the house roof back in 2009, we had Terry’s little cement mixer running here. It’s only small but it runs on just 375 watts and it ticked over all day comfortably on my electrical set-up here.

But it’s really too small for Terry now that he’s in business and so he’s acquired a big professional mixer that needed repair, and he’s now repaired it. The upshot of this is that “would I like a more-or-less permanent loan of the small mixer?”

Well, do bears have picnics in the woods?

A little mixer like that quietly ticking away all day while I do some important building work won’t half make my life easier and I have plenty of work for it in the summer, that’s for sure.

Aren’t I grateful?

This evening, I had the wood stove running hot, and garlic bread, pizza and rice pudding for tea were all cooked in the oven.

All in all it’s been quite a good day today. Hasn’t it just?

Sunday 22nd January 2012 – I’VE ALWAYS WANTED …

… to watch a 3rd Division football match in the Allier, as regular readers of this rubbish will recall.

This is the lowest tier in football in the Allier (the Puy-de-Dôme has four) but having seen matches higher up the pyramid and not been impressed at all, I wondered how bad an Allier 3rd Division match would be.

As luck would have it, with the Puy-de-Dome still being on the trève, or “winter break”, this afternoon Terjat (about 8 miles from here) were entertaining (if that is the right word to use) their near-neighbours Sainte Thérence in a cut-throat local derby down in the basement of the 3rd Division.

Obviously, with nothing better to do (there was no paint drying and no grass growing anywhere in the vicinity) a visit to Terjat was called for.

And I wasn’t disappointed either, for it was predictably awful.

There was only one player on the field who looked reasonably competent (I’m excluding the Sainte Thérence goalkeeper – what on earth was someone like him doing playing in a team as awful as his?) and that was the Terjat centre-half.

It was clear after the first five minutes that nothing was ever going to get past him as long as he was on the pitch, and it didn’t either.

The trainer of Sainte Thérence clearly had the same opinion as me, and the talk that he gave to his team at half-time was just so predictable.

30 seconds after the restart, with the Terjat centre-half taking off after a loose ball down the right flank, two Ste Thérence players came after him and put him firmly, fairly (well, the referee thought that it was fair – others might not) and squarely into the advertising hoardings with a thump that was heard all over the Allier.

That was his match over.

And so was AS Terjat’s, because the result was predictable after that.

Next stop was to Liz and Terry’s to rehearse our radio programmes for the next month and Liz very kindly cooked tea and made cake, some of which found its way in a doggy-bag back to my house, for which I am extremely grateful

So we are recording tomorrow morning, and then I have to crack on with the next outstanding task – my presentation on the Trans-Labrador Highway for the village discussion group.

It’s all go here.

Saturday 21st January 2012 – AND A QUIET …

… day today.

Which, after the hectic weekend I had last weekend, is no surprise.

For most of the day I was writing the scripts for the next few months-worth of radio programmes.And Liz and I will be spending most of our time talking rubbish.

I know that that’s what we usually do, but this time we mean it.

I was at a loss as to what subject to choose, but then on Tuesday I received my Puy-de-Dôme en Mouvement magazine in which one of the topics was the Departement’s plan to reduce the amount of waste going to landfill.

Then on Thursday I received my monthly magazine from the Bank, in which one of the topics was donating unwanted goods to charities and good homes. A subject therefore immediately suggested itself

What with my thesis for my Open University Diploma in Pollution Control where I wrote about waste and landfills, I’m perfectly qualified to talk rubbish and many people have suggested that I’ve had plenty of practice over the years, so that was that.

I had an interruption at midday on Saturday for a shopping expedition to St Eloy-les-Mines where I spent nothing exceptional and bought nothing exciting, but that was that.

Saturday night was football.

Not at Pionsat as the Puy-de-Dôme football leagues are on a winter break – and doesn’t this weather make a mockery of the idea of a winter break? Six weeks with no footy in the Puy-de-Dôme with some of the mildest weather I have ever had in winter, and when the season restarts next weekend – just you watch _ we’ll be snowed in for a month!

Instead, I was at Marcillat just across the border in the Allier where their 1st XI took on Chantelle. This was a match that is nominally in a division one step higher than FC Pionsat St Hilaire’s 1st XI but the standard of football in the Allier is total rubbish and it was an appalling match.

I’m not sure why I bothered.

Friday 20th January 2012 – I CAN’T SEE …

… a thing right now in my room.

There’s a gusting wind blowing up outside and it’s in just the right direction to blow right down my chimney so every couple of minutes a load of smoke is blown back down the fire and out of the air vent into the room.

I’m being done up like a kipper just now.

But I was right about the weather – it’s rained for most of the day. And it is indeed nice to see the rail cascading off the new roof on the lean-to onto the ground, well away from the wall, and everything inside the lean-to being bone-dry for a change.

I can’t believe my luck with the weather for that 10-day spell when I decided to go for broke and do the lean-to roof. It’s not like me at all.

So I did some sawing of the wood this morning, but a downside of this now is that I’m cutting it faster than I’m burning it and I’m now running out of room to store it. I suppose that I shall have to make a larger woodpile, or a taller one or something.

I could, I suppose, even dig the trench that I need to dig at the side of the house by the “other” lean-to, drop the drainage pipe in there that needs to go in there and connect it into the drainage system, fill the trench with gravel, cover it over with a weed blanket and then build the real woodshed where it is supposed to go, but that’s not the work of half an hour.

After the woodcutting (which I managed to do without any interruption for a change) I did some more tidying up, starting in the lean-to.

First job was to rescue the remaining Hawker deep-discharge batteries and charge them up.

And here I’ve hit a problem, in that the battery box I made for the previous batteries is too small – the Hawkers are taller. But anyway once they were out of the way I tidied up in the lean-to, collected all of the stray solar panels and stacked them in a corner, and then hung up the smaller gardening tools so that I’m not tripping over them.

Having moved a couple of solar panels out of the barn I could then get in there and make some space to put the old Rutland wind turbine tidily out of the way.

This led to the discovery of a circular saw, not the 600-watt one that I can’t find anywhere at all, but the old 1050-watt one that was all rusted solid having been left in a container that filled with water through a leak in the barn roof when I was ill and which had subsequently been partly-dismantled for spares.

Of course, now that I have a 1200-watt inverter all things are possible, so I gave the saw a good spray with WD40 and reassembled it with some other bits and pieces. And much to my surprise it fired up!

Even more surprising was that the inverter didn’t even bat an eyelid.

The saw needs some “attention to detail” before I can use it to cut wood, but this is definitely progress.

This afternoon, with the weather deteriorating, I restarted work in the bedroom – the first time for God knows how long. I’ve fitted the false beam at the side wall – the beam that hides all of the electrical cable – and I’ve also packed out one of the plasterboard panels that didn’t quite mate with the others.

It was then that I lost the light and so I spent the last hour tidying up in the barn again.

And despite all of this time that I’ve spent tidying up, a I really can’t see any difference at all.

This evening by way of an experiment, I brought a kettle of water up here and put it on top of the woodstove. And after about 2.5 hours it was gloriously warm and I had a lovely hot wash and shave in front of the fire.

Definitely the highlight of the week, that, and I can’t think why I hadn’t done that before.

Next step is the coffee pot on the stove, and put the produce in a thermos ready for the following morning.

I ought to be much-better organised than I am.

Thursday 19th January 2012 – THE WEATHER …

… changed during the night, just as I suspected that it might when I saw the clouds gathering yesterday afternoon.

I woke up this morning to a grey and miserable overcast day, and that’s how it remained all day.

The third of these cold-calling solar panel salesmen came to see me at about 11:00 and he was gone by 11:05, interrupting my woodcutting.

I need to do as much as I can of that because I want the space at the back of the barn, where I’m storing the tree trunks, for other things. Getting it out of the way by cutting it up seems like a good idea to me and I’m planning to do half an hour each day. Warm me up for other things.

Once my time was up I went to look for something in the barn and I can’t remember what it was now, but I didn’t find it, as you might expect in my barn.

I ended up doing some kind of tidying up (after a fashion) and repairing the lights up there so that I can see what I’m doing, and I found the 400-watt halogen heater that I brought back from Brussels.

The oil heater isn’t heating as much as I had hoped and it’s not keeping its heat as long as it ought to either, and so I’ve decided to go with the halogen one for now.

100 watts less, but of course halogen is much more efficient than most other forms of electric heating and I recall getting quite warm with that in the old days. I’ll be intrigued to see what it can do in a glorious alpine day.

I also found a pair of steel toecapped work shoes that I had forgotten all about. They’ve been rescued and put to good use. It’s nice to have decent footwear.

This afternoon I went about and inspected the trees overhanging the next stage of the garden development – the space to where I’ll be moving the compost bins. There were a couple of them that looked rather dodgy and so they came down.

I also cut up the tree that had fallen down in the gale last summer and flattened my spuds and onions, and moved it out of the way.

I DO like this new saw.

To finish off, I started to weed one of the raised beds where I grow my vegetables and I’m making quite a pile of stuff for burning, right where the greenhouse is going to be.

And four reasons too.

  1. it’s a nice big clear space there
  2. it’ll get rid of all the rubbish that’s accumulating
  3. it’ll burn the weeds that are growing there
  4. the ashes will fertilise the soil

But I won’t be burning anything tomorrow, and I won’t be working in the garden either. We’re having a torrential rainstorm right now outside and I’ll be intrigued to see how the new roof is coping with it all.

Wednesday 18th January 2012 – WELL, THAT GOT RID OF THEM!

Yes, I had two visits from solar panel installation sales companies, and neither stayed for very long.

And serve them right too. I hate these cold-calling canvassing companies.

And there’s another one coming tomorrow as well. I can’t believe that I’m being snowed under with these blighters. They clearly don’t have anything better to do.

But this morning started with me being up and about before the alarm, and that doesn’t happen very often.

And after breakfast I had a mega-woodcutting session, so now the woodpile is looking quite impressive again, as it ought to be. I’ve heard it on the grapevine that winter is just lurking around the corner

But in the bright sunlight of the early afternoon I fired up the huge SDS drill and carried on drilling the core hole through the stone wall into the lean-to, but I wasn’t there for long because as I went out, the sun went in and the clouds came out.

That drill is 1200 watts, remember, and it needs plenty of sunlight for it to run continuously.

export order to canada les guis virlet puy de dome franceThis afternoon I prepared an order of product to be exported to Canada

When I was there in September, you might recall that I had computer issues, and I met a guy who helped me repair it. He was telling me that he can’t easily find 230-volt electrical components in North America, but of course I can over here in Europe and so I’ve started a new role as supplier of his 230-volt products.

That involved, this afternoon, screwing 108 transformers to 2 pieces of plywood (left over from my roof), making a sandwich of the lot and wrapping them in a cardboard box ready for shipping.

Yes, this new little venture can be quite exciting if it comes off.

Tuesday 17th January 2012 – YOU MAY REMEMBER …

victron energy 1200 watt inverter les guis virlet puy de dome france… the other day that I mentioned that there was a new digital 1200-watt inverter in the post on its way here. Well, it turned up a couple of days ago but I never had time to install it.

Anyway, that all changed this morning and after cutting another huge pile of wood I set about fitting it in the system.

It’s quite a monster and quite heavy too, and the cable is 25mm welding cable. And to fit it on my panel board it involved moving a few things around in order to make the space.

But it’s certainly impressive and if it works as well as it’s supposed to, it will be a big improvement on the current (well, we are talking electricity here) analogue 600-watt inverter, which creaks and groans under the load that it sometimes has to bear but which has kept going for almost three years, day-in and day-out, nevertheless.

600 watt inverter portable power board les guis virlet puy de dome franceThe aforementioned has now been relegated onto the portable power panel that I made the other week which I drag around the outside from place to place when I need power.

As for the 150-watt inverter that was on there that has creaked and groaned day-in and day-out for even longer, that has now been relegated into Caliburn where it will just be used for charging up the laptop and the occasional power tool once in a while, replacing the unsatisfactory 150-watt pulse inverter that only seems to want to pulse when it wants to, which is never when I want it to.

This afternoon I did something that is so unusual as to merit recording here on the blog. And that is something called “tidying up”.

That’s a phrase that is contained in the vocabulary of many people but is somehow missing from mine.

You can’t see much of a difference because I seem to be the only person in the world whose tidying up makes more of a mess that it was before I started, but I’ve recovered 7 square metres of roofing tiles left over from the roofing of the house and the two lean-tos.

I’ll put them on one side for now and think of a way of using them.

I also went into the field next door hunting for the nails that made a bid for freedom. I don’t want the farmer’s cattle to find them first. I recovered a dozen or so but that’s just a tiny fraction of the number that got away. I’ll go for another look tomorrow

But the purpose of tidying up was to clear all of the wood off the floor of the first floor of the lean-to. Where the tarpaulin had been blown away, that area of the floor was soaking wet and the wood that was piled on it, much of it new stuff, was also soaking wet and it was all stopping the floor from drying.

So all of that wood has been arranged tidily where it will receive a nice current of air, and the floor is clear so that it might dry out. You might remember that it was only 18 months ago that I laid the floor and I don’t want it rotting away quite yet.

In other news, I have two companies sending representatives around tomorrow to sell me these roof-top solar panel systems.

I hate these cold-calling canvassers who ring up at 19:15 and 19:45 when I’m trying to drink a coffee and watch a film. Worse than spam e-mails they are – at least you can delete those – and so I’m fighting back.

I can waste more of their time than they can of mine.

And in other other news, the water in the new immersion heater reached 28.5°C this afternoon. Not a lot you might think, but that was 25°C over the ambient temperature downstairs, and that’s well-worth having.

It’s not hot enough to use the washing machine or to have a shower, but we are moving in the right direction.

Monday 16th January 2012 – THE FIRST THING …

… that I did today was to empty the composting toilet.

I’ve been neglecting it for a few days, what with one thing or another.

And of course, once you get started you’ll be surprised at how many other things there are too. But the composting toilet did need to be emptied, such is the exciting life that I lead these days.

Second job was to cut a mound of wood.

I’ve been running the pile down this last week or two while I’ve been waming myself and cooking with the new woodstove and so I set about sawing up a big load of wood which should keep me going for the next few weeks.

All done by hand with this new saw, and I’m almost as impressed with that as I am with my galvanised steel dustbin, which hasn’t featured anything as much as it deserves in these pages of late.

anemometer ls guis virlet puy de dome franceThird job was to rescue the old anemometer that was formerly mounted on the side of the house and which I had taken down when I had put the wind turbine up there.

This was sitting in the lean-to not doing very much at all but it’s now screwed to the fence by the front door.

The main reason why I put it back up is that its temperature gauge is much more accurate than the one that I’m currently using to measure the air temperature.

This afternoon, with the sun blazing down and the heater upstairs working flat-out, I reckoned that this is a bit silly. There is so much more that I ought to be doing with the surplus electricity that I have.

And so remembering the heady days of spring and summer 2011 with the 12-volt immersion heater that I had made out of an old xylophene drum and a 12-volt heater element and which corroded through while I was in Canada just now, I set to and dismantled it.

I gave the important bits – like the heater element – the once-over to make sure that they still worked (and you would be amazed at how quickly it boils 1.5 litres of water) and then built another heater using a 4-gallon plastic water header tank.

I’m not sure how long the plastic will remain viable, but it should be good for a while anyway. It will hopefully give me hot water in weather like this and I can do my washing.

But all of this got me thinking – and that kind of thing is dangerous.

When I was setting out on the road of doing all of this, I remembered mentioning to someone who I thought was a friend of mine my plans for maybe having a microwave oven here.

A short while later I stumbled across a thread in a newsgroup somewhere where this “friend” and his mates were openly ridiculing my thoughts about this. Of course, such a friendship had to peter out after that.

Nevertheless, I do wonder what this guy and his mates would be saying now when here, in the middle of winter, for the last three days I’ve been running an electric heater up in the attic.

Serve them right. 

And what happened to this day off that I was going to have?

Sunday 15th January 2012 – AND IF YOU THOUGHT …

… that yesterday featured a spectacular change of habits for me, you ain’t seen nuffink yet because today was absolutely dramatic.

Because it’s a Sunday, and believe it or not, I have been working.

And you can count on the fingers of one hand the times that that has happened.

I was up and about reasonably early for a Sunday and once more I was presented with a glorious blue sky and loads of sunshine. Far too nice to waste, I reckoned, with winter about to breathe heavily down my neck.

And the benefits of having cracked on yesterday were apparent because this morning was about a foot of frost everywhere which would have slowed up any normal progress, but With having done so much yesterday, there were only three rows left to do and I could afford to wait until the frost had melted before setting out to work.

I mentioned ages ago, and doubtless you will remember, that these slates don’t ‘arf warm up quickly and retain their heat once the sun gets on them. And so it was today.

aspire recycled plastic stlates lean to les guis virlet puy de dome franceBy about 12:40 all of the frost had gone and so by 12:45 I was on the roof.

And by 15:30 it was all over.

The slates are on and hopefully it’s all now weatherproof. It certainly looks like it might be, and I am so grateful for the weather having held off while I did it.

Although why I wasn’t struck down by a thunderbolt for working on the Sabbath is something that I don’t understand.

Of course, it’s all far from finished.

I need to cement the join between the roof and the wall, cover one or two exposed nail heads with bitumen, make good the rendering, add a fascia board, paint all the woodwork, cover up the exposed demi-chevrons and fit the guttering. But none of that can be done until the warmer weather of the spring.

A major mistake that I have made though (but it isn’t really a mistake, although I could kick myself from here to Montlucon and back) is that I have forgotten to fit the roof-light.

I salvaged an old cast-iron-framed roof-light that I was going to fit in the roof here, but I forgot all about it in my haste, and it’s too late now to do anything about it. That’ll teach me to rush.

Ahh well.

After all of that, I came in here and relaxed in the warmth. And I DO mean warmth because we had so much solar energy today that I ran the oil heater for three hours and the temperature rose to as much as 17°C in the attic.

But as it cooled down later on I ran the fire and had a gorgeous tea of garlic bread, pizza and rice pudding, all made in the oven of this magnificent fire that I bought a short while ago.

So now I’m off to bed, a good half-hour before midnight and that’s something else that is astonishing. But I’m exhausted, and I don’t mind being exhausted through good honest hard work.

Tomorrow I’m not going to be in a rush to start work and I might just have an easy day, having missed my weekend.

But I’m not complaining. I’m just so pleased that for once the weather has been on my side and I’ve finished slating the roof before the real winter arrives.

I might have hoped, but I certainly didn’t expect this.

Saturday 14th January 2012 – SATURDAY IS SHOPPING DAY.

And so it was today.

But in a dramatic change to my usual habits, shopping day was a quick one-hour thrash down to St Eloy les Mines late in the afternoon just as it was starting to go dark.

Yes, I woke up this morning (-ish) to a beautiful bright blue clear sky and that meant “sod everything else – up on the roof!”.

I wasn’t intending to miss this unexpected stroke of fortune, even if it was freezing cold and everywhere was covered in ice that started to melt and soaked me to the skin again.

aspire recycled plastic roofing sheets lean to les guis virlet puy de dome franceIn not all that much time, comparatively speaking, I had another 6 rows of tiles on the roof. They aren’t particularly pretty but they are on, and that’s the bit that’s important. The weather was far too good to miss.

But do you like the IKEA bags? Very useful they are, for all kinds of purposes. And I have one fastened to the top of each ladder and they are used for holding the slates and nails so that I don’t have to keep on going down to the scaffolding.

And two ladders? The scaffolding is in two bays and each ladder is tied to the handrail of each bay. The difference with the metal planks that I have bought compared to the wooden planks of the other scaffolding is that the ladders don’t dig in – they slide across the metal.

So you need to tie them onto the scaffolding to stop them sliding off and of course if they are tied, then they can’t be moved from one bay to the next.

The other ladder hanging off the scaffolding is part of the side of the decorator’s platform that I have in the house. That came in useful when I was working lower down the roof – I could hook it over the uprights and work off the top but now I’m out of reach of it.

On the way to the shops I realised what a good buy this LIDL quilted overall was. In order to leave here I had to switch on the wipers on Caliburn in order to to clear the screen because they were frozen on to it – that was how cold it had been during rhe day, but I hadn’t noticed because I was curled up as snug as a bug in a rug in the quilted overall.

I’m well-impressed with that as well – almost impressed as I am with my galvanised steel dustbin in fact

But by the time that I was finished I was absolutely whacked and aching everywhere.

To such an extent that on the way back, when I noticed way across the valley that the floodlights were switched on at AS Marcillat’s football ground indicating that there was a match on tonight and that would ordinarily have been the signal for me to go over and watch, seeing as there was nothing on at FC Pionsat St Hilaire tonight, I was aching far too much to even consider it.

Instead, I just came in here and crashed out.

That’s a rare event too.

But then again, I said that I would pay for the effort that I’m putting in on this roof, so it’s not unexpected.

But now there are just three or so rows left to do, and they’ll be for the morning of the next working day.