Monday 22nd June 2015 – BACK TO WORK …

… although I didn’t feel much like it. I didn’t have anything like a late night, but it was still difficult to crawl out of bed.

After breakfast, I did a pile of work on the computer again and that took me though to midday. And then I attacked the shower room.

worktop sink tap shower room les guis virlet puy de dome france The worktop is now in position, and all of the plasterboard has been fitted around it (except on the stud wall where the pipes will be running).

And I remembered why I hadn’t fitted the mounting rail on one side too. That was because there isn’t enough room to manoeuvre the worktop into position with both mounting rails in place. I had to take it out, fit the worktop and then refit the rail

But tiling the walls is going to be interesting. According to the plasterboard that I have fitted, the walls are out of plumb bu 25mm over a distance of a metre. So with 18m² of wall to tile, you can imagine what that is going to look like when it’s finished.

There were some bits of blank wall that needed plasterboarding too, and I had forgotten about these. I’ve made a start on them – one part has been done and I’m fitting the studding for the second. The third doesn’t need studding but just a bit of “dot and dab” – I’m sure that I have some stuff for that somewhere, and I’ll look tomorrow.

Water in the home-made immersion heater was really hot – off the scale in fact – and the water in the solar shower was at 32.5°C. 8 litres of water out of the immersion heater into the solar tank took that up to a glorious 38.5°C and I had the best shower that I have had for ages. But the wiring on the immersion heater is heating up again. I’m really going to have to have a good look at this next time we have a grey day.

Later, I made a mega-red pepper and lentil curry, enough for four days. Three says’ worth has gone into the fridge in the vacuum jars and that will keep me going quite happily for the next few days.

But I might not be working here tomorrow. Rob rang up and there’s the possibility of some folding stuff for the next few days.