Tag Archives: speeding up acer aspire

Sunday 21st June 2015 – HAPPY SOLSTICE

Yes, the longest day of the year today. It’s all downhill from here. Where did the first 6 months of the year go?

And so I celebrated the Solstice by having a lie-in, seeing as it was Sunday today. And in view of the late night that I had had (02:30 when I finally crawled in), it was a good 10:15 when I eventually crawled out and gone 11:00 by the time that I had finished breakfast.

As for the laptop, it had indeed run out of battery so while I was breakfasting, I put it on charge in the barn using the 12-volt power lead that I have.

After breakfast, I spend a pleasant couple of hours going through the hard drive on the 1st Aspire, deleting loads of things that I no longer needed, deleting all kinds of programs and editing the start-up memory. Now, it fires up in seconds rather than the 10 minutes that it used to take and all in all, it’s now quite a stable platform.

But here’s a thing. I remember when I bought it that it had just 2GB of RAM on board, and that’s what it says on the sticker. But when I checked the system, it clearly shows that there is 4GB there. I don’t remember upgrading it, but I suppose that I must have done at some point when I was in the UK. And that might account for how much better it performs when compared to any of its later brothers. Upgrading this one to 8GB might just work because if i can make this perform as well as the 1st Aspire, then I’ll be reasonably satisfied.

This afternoon, I’ve been tidying up in here and for a change just recently, it’s now fit to receive visitors. I’ve even scrubbed the oilcloth that I use as a tablecloth on the table which I use for preparing the food.

I did set out to have a shower too, but the weather was deceiving. Although it looked quite a nice day outside, it wasn’t that warm – and the water in the solar shower was a mere 30°C. The water in the home-made 12-volt immersion heater that I use as a dump load was only 54°C so I couldn’t put enough of that into the solar shower to raise the temperature sufficiently.

Mind you, that was my own fault. Feeling like having a coffee this afternoon, I had the electric coffee percolator going for half an hour. Coffee made in there tastes so much better than instant coffee, but it isn’t half energy-consuming.

So back to work tomorrow – fitting the worktop in the shower room and then starting on the door frame. I really will have a shower tomorrow if it’s warm, and if I can’t have it in the solar shower, I’ll use the corner of the verandah and a bucket of hot water from the home-made 12-volt immersion heater.

Monday 8th June 2015 – I THINK …

sawn through top of black and decker workmate les guis virlet puy de dome france… that I am going to have to find a new top for my old Black and Decker workmate. I thought that the circular saw was making hard work of that final cut on the top of the beichstuhl this evening.

It’s a fine old workmate too – getting on for 30 years old. Nerina bought it for me in the days when Black and Decker stuff was good, when I was planning on making some fitted wardrobes at Gainsborough Road. She reckoned that it might motivate me to do them, and I did too!

It’s been around Europe with me on all kinds of construction sites and it’s outlived a couple of more modern reincarnations which have failed to last the pace.

Yes, I’ve been working again. Cutting out and smoothing out the lunette in the top of the beichstuhl, and then cutting out the lid for the sawdust container.

It”s all been sanded down and fitted with reinforcing struts – not that it needs them but I’d look pretty silly if it were to. I can finish it off tomorrow and give it the first coat of wood treatment

Apart from that, I spent the morning on the laptop talking to Acer. seeing as I’ve been having some success about various matters on various forums, I attacked Acer today about my new laptop which is painfully slow with Windows 8.1.

The official helpdesk guy was no help at all but the self-help forum came up trumps. I was given a whole list of things to switch off and to delete, and told where and how I can reduce screen graphics to a minimum. That has certainly bumped up the speed and it’s roaring along now like it ought to do.

Even more interestingly, upgrading the RAM from 2GB to 8GB is staightforward. It’s standard DRAM 3 stocked everywhere and someone is going to find a plan of how to fit it. This one is not like the other ACER Aspire laptops with the service hatch underneath – you need to take the case right apart to get into it.

Rosemary rang up for a chat, and I had an interesting chat with a cold caller. He didn’t understand my lifestyle at all – it made no sense to him whatsoever

So tomorrow I’ll continue in the shower room? We’re are advancing quite slowly, but advancing all the same.

And with today’s water temperature in the solar shower at 33°C and the water in the home-made 12-volt immersion heater where all of the excess solar energy goes being over 70°C when I knocked off, 5 litres out of the latter into the former gave me a glorious solar shower to finish off the day.