Tuesday 16th June 2015 – NOW THAT I’VE FINISHED …

beichstuhl composting toilet les guis virlet puy de dome france… working on the corner where the beichstuhl is, I can post a couple of photos of it so that you can see what I’ve been doing.

That’s the worktop that I’ve been building just there. The container for the composting toilet is where you might expect it to be, and at the side is the container where the sawdust and wood-ash is kept. There’s a ladle in there for dispensing the sawdust and wood-ash.

The three contents combined (sawdust, wood-ash and the contents of a composting toilet used by someone with a vegan diet) contain all of the elements for making a first-class compost if it’s left to stand for a year or so. That’s why I have two compost bins down at the bottom of the garden. One is “working” and the other one is “standing”.

As for the container, it’s one of these huge stainless steel jam-boilers, about 25 litres of it, and complete with stainless steel lid. It’s lined with a bio-degradable dustbin liner and then a thick layer of shredded paper (I use old telephone directories as the paper is super-absorbent) to soak up any liquids.

les guis virlet puy de dome franceAs for the upper part, you can see the two shelves that I have fitted in place. One shelf is for what I call the “bathroom books” and the upper shelf is for the supplies of toilet paper and the like.

Storage space is quite important around here, seeing as how there is so much stuff that I seem to have accumulated. I can never have too much of that.

I have to fit the suspended ceiling (which won’t be for quite a while yet) and then it will be ready for tiling.

So having done that, I toot out the worktop for the sink. That had been propped into position merely to give me a kind-of workbench. Once I had done that, I had to reposition the mounting rails.

You may remember that I was planning an inset sink, but the old worktop wouldn’t support the weight of the sink once I had cut the hole in it. Hence I’m going for the type of sink that sits on top of the worktop, and this means that the height of the worktop needs to be lowered by 150mm so that the sink is at the same height.

I’ve also been drilling out the rails in the stud wall between the shower and the sink worktop so that the water pipes will pass down there out of the way.

I would have done much more too, except that I had to spend an hour or so in the barn looking for wood to make the new rails. I need to spend some time tidying up in there, although I’m not sure whenever that might happen.

And what else?

We had another bad weather day today. A hanging cloud everywhere this morning, and this in mid-June too. All miserable, wet and depressing.

I’ve been working on the laptop too, and found another technical forum that looks quite helpful, so I’ve posted on there to ask whether anyone has any ideas about whether it might be possible to extract the data from this failed hard drive.

I doubt it, but it costs nothing to try.

Thursday 16th April 2015 – WE HAVE HAD A CALAMITY.

Yes, and you have no idea just how miserable and fed up I am.

worktop fitted in shower roomles guis virlet puy de dome franceMind you, at about 11:00 things were going pretty well, as you can see.

Here is the worktop in the bathroom. It’s been cut to size and shaped to fit. And now I’ve put it into position just to make sure that it’s fine.

It is in fact milimetre-perfect, except that it’s going under the rails, not over them. But that’s not a problem

star pattern for cutting out inset for sink shower room les guis virlet puy de dome franceNext plan is to cut out the inset for the sink.

It’s not as complicated as you might think. First, you draw around the perimeter of the sink, to give you a maximum area. Then using a straight edge and a pencil, you draw straight lines from the perimeter – these correspond with the outline of the inset that you need so that you can drop the sink into the hole that you’ll be cutting.

Then you remove the sink, and continue the lines into the inside of the perimeter and they will all join up and you’ll have an internal perimeter. If you enlarge the photo, you’ll see exactly what I mean.

And then you cut away the internal perimeter. Drilling out the corners with a 10mm drill, you can use a jigsaw then to cut out along the lines.

sink set in worktop fixed into position shower room les guis virlet puy de dome franceAnd here we have the sink, inset into the worktop, and the worktop screwed in place.

Well, in fact the sink is just set into the hole. What you need to do of course is to smear mastic everywhere and then drop the sink in, and that will make a permanent fixture.

So it’s looking good, isn’t it?

worktop collapsed shower room les guis virlet puy de dome franceWell, actually, no it isn’t.

If you look at my thunb, you’ll see that the worktop has collapsed – and collapsed under its own weight too (I put the sink in afterwards for a demonstation).

That’s right – more rubbish from Brico Depot. Cheap, nasty worktops that aren’t fit to be used as firelighters. This went into the bin. And there will be another pile of Brico Depot stuff following it too.

I’ve been complaining for ages about the quality of Brico Depot stuff being worse and worse, and it’s hit rock bottom today. I’ve wasted 5 hours on this piece of Brico Depot garbage

Anyway, I went and had a coffee and called it a morning. I also had a listen to Neil Young singing about Brico Depot products

And if that’s not bad enough, then this afternoon I made a start on another job that I had intended to do now that I’ve dismantled the shower room. And that was to rebuild one of the stud walls, only with the shelf rails in the correct place.

dry rot demi chevrons les guis virlet puy de dome franceI sorted out he two demi-chevrons left over from when I bought a pile of stuff years ago to repair the downhill lean-to that had collapsed, and then marked them off and started to cut the lets.

That was when I noticed that both the demi-chevrons had somehow acquired a dose of dry-rot. Consequently, they’ve followed the shower room worktop into the pile of firewood.

Believe me – I’m totally p155ed off by all of this. On Monday, after the radio, I’m going to go and have a look at the real worktops in IKEA and I don’t care how much I have to pay. I’m totally fed up with this Brico Depot rubbish.

The good news is that we had a storm tonight and 8mm of rain fell in 90 minutes. That’s filled the water butts back up and no mistake. If the good weather comes back, I can carry on with the washing.

And I was on my travels last night – around the pubs in the East End of London. and I had to go and change my clothes and disguise myself, and the best place to do this is in the toilet of course. So there I was in the ladies’, of all places, in a cubicle with a woman banging on the door. But I was too busy checking through the stuff in there to make sure that some stuff that I had left a previous time was still there. And when I came out, the woman had gone and the toilet was empty. From here I went on the Holmes Chapel and Shearings depot, wandering around carrying a huge pile of plates. People were telling me that there was a load of new faces for the new season that was starting, but of course that was nothing new as coach-tour driving is something of an itinerant job. Still, there I was, wandering around all of the rooms, and it suddenly occurred to me – why don’t I put the plates down? Why do I need to carry them about?

Wednesday 15th April 2015 – I HAD AN UNEXPECTED …

rabbit les guis virlet puy de dome france… visitor at the front door this morning.

I’ve no idea what Bugs was doing there but he looked as if he was at home there all the same. Anyway he soon cleared off when I came to the front door and I was lucky to be able to squeeze off a slightly out-of-focus shpt as he scurried back up the drive.

So having been at one with the local wildlife, I carried on with work today.

First thing was to deal with the issue of the solar water heater. The temperature was 59°C in there this morning and at an average of 8°C per hour in the kind of weather that we have been having just now, then once the batteries are fully-charged, the water will boil up before the sun goes down tonight.

So what I did, and for the first time ever, was to drain 20 litres of water off it. Two buckets full, and I simply left it in the buckets to cool down. When the water started to heat up this afternoon, I simply tipped the buckets of lukewarm water into it. As a result, the water didn’t rise past 65°C, and that was fine.

philips les guis virlet puy de dome franceAnother thing that helped keep the water temperature down was to run the coffee machine for the first time this year.

850 watts at half an hour produced a nice pot of coffee as well as swallowing up some of the surplus energy, and I’ll have to do this more often. In any case, it saves on the gas here.

batten for fitting shelf for top of composting toilet les guis virlet puy de dome franceAs for the work, I carried on in the shower room today.

First thing, I fitted the second batten for the shelf that will form the top of the composting toilet. You can see it here, at right angles to the shelf that I fitted yesterday.

There’s a third shelf too, but that’s in the false wall that I’ve temporarily dismantled while I’m working. The fourth shelf will be the top of the front panel, but you’ll see this in due course as the work progresses.

batten for fitting worktop in shower room les guis virlet puy de dome franceI’ve also finished the rest of the battens in the bathroom (for now at least).

You’ll see on the left just underneath the window the batten which will support the worktop into which I’ll be fitting the sink. This is something that I’ll be tackling sooner than you might think.

As for the battens, I’ve finally found my mitre gauge and with setting it up to 13mm (the battens are 26mm) I can mark off the mitres with some kind of accuracy. And even with my slightly-bent mitre saw with a couple of teeth missing, and my 100 year-old wood chisel, the level of accuracy that I’ve been managing has certainly astounded me.

So I’m having a well-earned rest and I might even have an early night too.