Tuesday 7th July 2015 – THIS IDEA …

flying shelf shower room les guis virlet puy de dome france… about a flying shelf in the bathroom seems to work okay.

You can see how it’s going to work. There’s a bracket in the false ceiling (the false ceiling will eventually go over it) and from there are two lengths of threaded rod hanging down. At the moment the threaded rod is passing right through the shelves and held up with nuts, but there will be some captive nuts fitted into the shelves and the threaded rod will be cut to size.

The threaded rod will be covered by some nice stainless steel tubing and it will all look quite nice.

This morning we braved the heat and made it to Marcillat to record the radio programmes. Things went according to plan, except that Violette fell asleep and one of our 15-minute shows ran on for almost 19 minutes. She’ll have fun editing that down.

We went for a coffee and a good chat afterwards, and then I came home. I installed myself in the bedroom as 34°C in the attic was rather too much, but that didn’t work as I crashed out for a good hour – and I mean “crashed out”. And seeing as how I was in bed last night for 22:30, that was rather astonishing.

fitting bolt shower room door les guis virlet puy de dome franceAfter lunch I’ve fitted the bolt on the bathroom door (not that we need it but still, you never know) and then I attacked the shelving. That’s all cut to shape and drilled out where necessary (it’s having a cable run through it to power things like shavers and hair clippers) and now varnished, as is the shelf that I made the other day.

And surprise surprise, I was actually working at 22:30 this evening. I put the first coat on before knocking off at 19:30, but when I went out to take the stats, the first coat was dry so I put a second coat on.

Tomorrow, I’ll finish the shelving (I hope), plasterboard everything in, and then carry on with the ceiling.

Give me your opinion of this post
  • Excellent 
  • Useful 
  • Interesting 
  • Weird 
  • Surprising 
  • Boring