So Terry’s Transit and the Jeep have now been for their controle techniques. Both of them have failed but only on minor points, nothing that will prevent them from being driven on the road. There’s a 8-week period for correcting the faults.
Most surprisingly, the brakes on both vehicles passed with flying colours. After all of the work that I put in on them, especially with the handbrake on the Jeep, I was quite impressed and I breathed a sigh of relief. I didn’t want to have to do that again.
Terry was of course preoccupied with the controle techniques today and so I was on my own here.
This new submersible pump that I bought the other day, that really did the business. I’ve 400 litres of water now in a pile of dustbins ready to use or cement, and the rest was pumped out and down the lane. It was all over in minutes and made a change from spending hours baling out with a can and bucket.
Caliburn is also emptied of his concrete pillar blocks and they are stacked. I’m leaving the cement in there for now though – the best place to keep it dry and out of the way.
Once I’d done all of that, I did some weeding in the garden for a change. The onion and potato beds are now clear of thistles.
This afternoon, I did what I should have done at the weekend and completed the Radio Anglais texts for the next recording session. I wish that I had done that on Saturday.
So now I’m off to bed. I have to be up at 07:00 as Terry and I are going to Riom to register the Jeep now that it has passed the controle technique. I’m glad about that – that’s one care less.