Tag Archives: demi chevrons

Thursday 11th July 2013 – WELL, THE ANGLE GRINDER …

… idea worked just fine.

Mind you, I had to strip it down, remove the safety guard and the side handle, and fit a worn-down diamond disc. Then I could just about get the thing in the hole that I made.

Although it took ages to work out the best way to use it and how to control it, I managed to carve a deep groove into the head of this stubborn lump of ironstone.

The SDS drill, in the stationary position and with a chisel attachment, fitted some way into the hole (after I’d stripped all kinds of surplus stuff off the drill) and after several good poundings I knocked a lump off the rock.

And that was how I proceeded – cut a groove in a lump of rock with the angle grinder, pound away with the SDS chisel, and then use the core drill until it grounded out again.

hole in wall shower room les guis virlet puy de dome franceIt took ages too and then of course eventually the angle grinder and the chisel bottomed out and that was that.

But I did find a 500mm 22mm SDS drill and so I used that to punch a whole row of holes, rather like perforations, around the groove made by the core drill. And at about 16:30 this afternoon I broke through and that was that;

Now the pipe is in place, cemented in from the outside and with the filter fitted. It’s mostly filled from the inside but of course the air vent and fan won’t be fitted until the tiling is done.

While I was waiting for all the cement to dry, I had a little (yes, just a little) tidy up in what will be the bedroom and I found loads of stuff that I had been looking for. But now I’m whacked, and that is that.

But back to this morning.

Cécile and I were up early and loaded her car with all of the stuff she’s taking to her mother’s, which was uite a considerable amount.

I then ran her into St Gervais d’Auvergne to post a letter at the Post Office, where we ran into the guy who runs the sawmill. It’s always closed in July and August while he does the harvest, but he did mention that he had a workman down at the mill just then.

Upon hearing that news, I took full advantage and came back with a load of demi-chevrons.

A really good investment, Caliburn’s roofrack.

So now Cécile has left the area, probably for good, and I’m back here making rapid progress now in the shower room.

What’s going to happen next to jam a spanner in the works?

Tuesday 2nd July 2013 – *@ç#%§µ ¤£&€ù+§ cheap flaming useless tools!!!

damaged arbour sds dtill les guis virlet puy de dome franceThat’s the arbour off the core drill kit that I bought (and spent a lot of money on) 18 months or so ago. The drill end is totally burnt out.

What’s been happening here is that the arbour has not been a precise fit in the chuck of the SDS drill. With the 4 hours of constant pounding that it received yesterday, the percussion effect of the play slowly but surely enlarged the groove in the arbour until it burnt through.

Mind you, as I said yesterday, the impressive thing about this is that everything else – the inverter, the batteries, the wiring, even the LIDL drill, stood up to everything that I could throw at it.

I expected loads of other things to burn out before the arbour would give way.

And it took me hours to dismantle the SDS drill too before I could extract the arbour, and I can tell you absolutely everything about how an SDS drill works now because I’ve seen it first-hand.

Anyway, once I’d freed the arbour I cleaned and greased everything and then reassembled it.

I’m not sure how the automotive circlip will stand up to the pounding but then that would be hammered to death in the con-rods and pistons anyway with much more force than an SDS drill so it should be okay.

rail cascading off verandah roof les guis virlet puy de dome franceTook hours, as I said, and it didn’t make any difference to my work programme because I couldn’t have drilled anything anyway.

Look at the rain cascading off the verandah roof. We had the most amazing tropical thunderstorm, as you can see.

It’s been a long time since I’ve seen rain like we had this afternoon although believe me, we have had some here for sure in the past as you know.

Not much good for working in but impressive all the same. And for a while there was no solar energy getting through at all. No chance of doing any drilling today of course, but there is still plenty of work to be going in with.

Later on in the afternoon I did manage to get into the shower room. I started cutting and shaping the horizontal supports for the stud wall between the shower room and the bedroom.

I cut and shaped four of them before I ran out of demi-chevron (and I wasn’t going outside for another one in that weather) and I managed to screw one of them in place before the batteries in the Ryobi Plus One drill and screwdriver went flat.

It just wasnt my day at all.

Mind you, it was 19:40 when I finished off so I suppose it was time enough. But I need to get cracking tomorrow.

I’m wasting far too much time and I don’t have too much to spare.

Saturday 16th June 2012 – I HAD A DAY OUT TODAY.

In fact I went to Montlucon.

And even though I had a late-ish start I was still out and round and back earlier than usual.

The impetus was that you my remember me receiving a text to say that my new front door needs picking up, and if I didn’t get a wiggle on I would lose it. So offI went to pick it up.

It’s not very substantial at all, being just a sheet of double-glazing with a wooden frame around it, and it’s not going to be used for ages yet. But the reason why I chose it when I did, for those of you with short memories, is that it’s the same style as the windows that I bought for the house and the range was discontinued at the end of March.

The fact that it was the cheapest double-glazed door has nothing whatever to do with the argument, of course.

My luck was in too. At the Amaranthe health food shop there was some soya cream that had gone past the sell-by date and so they were giving a carton away to each customer. That will do very nicely for a mushroom and onion fried rice later in the week.

At at the rubbish shop (NOZ, for the benefit of the foreigners) they were selling a load of flavoured rice milk at just €0:75 a litre. There’s a nice long sell-by date on those and so of course there are now none left in the shop.

Almond-flavoured rice milk on my breakfast muesli – that has to be the way to go.

dammi multi vitamin fruit drink noz montlucon allier franceAnd Dammi if I didn’t find some of this on sale at NOZ as well.

It’s a multi-vitamin, multi fruit drink. And I had a good look at the list of ingredients and, sure enough, it contains vitamin B12. being a vegan as you know,
I have lots of issues about my vitamin B12 intake so I’m always on the lookout for different food items that might contain it.

And with a name like this, it ought to be good too!

It was piping hot too – hottest day of the year for me and so I really fancied a swim, but I had left my swimming trunks back at home. Never mind – Auchan was having a sale and so for €5:00 I treated myself to a pair of new ones.

I took the plunge and went to the Centre Aqualudique at the back of Montlucon. I’d heard a couple of good reports about it.

And it was certainly a far cry from Neris-les-Bains – tidal pools, a fast-flowing current, bubble-massage seats in the pool. And many more people there than at Neris so there was much more to see.

Ohhhh yes – I still chase after the women. The problem is though that at my age I can’t remember why.

€5:00 admission though – and that’s quite a difference from €3:20, and nothing like as intimate. I’ll just have to save the Centre Aqualudique for special occasions such as midwinter when it’s far too cold to be at Neris-les-Bains.

At the Brico Depot I bought 4 demi-chevrons and 3 sacks of sand. And you might be wondering why. The demi chevrons because I want to put shelves up in this cupboard downstairs and I want to do it the next time the weather is bad, without having to wait for a trip to the sawmill for the wood.

And the bags of sand?

There’s some sealing joints that need to be made on the roof of the lean-to that I fitted earlier this year. I’ve no sand here and so I need to dig out the Sankey trailer, change the wheels, trundle down to the quarry, load the trailer, bring it back here and bag up the sand.

With having the sand here I can have the job finished before I’ve even changed the wheels on the Sankey.

But I hate the people at Brico Depot. I loaded up Caliburn and then went off to pay for it “you need to bring your vehicle here” said the girl in the office. Walking 20 metres was clearly too much for her.

And so I brought the vehicle to the door and she came out – and then started chatting to a fork-lift truck driver.
“When you can spare me the time, if it’s not too much trouble for you” I said, and so she shrugged her shoulders to the driver and slumped over to me to check my load.
Yes, the staff at Brico Depot needs a collective smack in the mouth. It’s just like being back in Belgium and how I hate that country.

Back here I sat down to watch a film and the next thing that I remember was that it was 20:00. A long time since I’ve crashed out like that too.

And for the football we watched a team of bouncing Czechs pole-axe their opposition to advance to the next stage of the UEFA Nations Cup.

Friday 2nd December 2011 – IT’S FRIDAY …

… but it’s not Five o’clock, and it’s not Crackerjack either. But it is the last Friday that I’ll be spending here for a week or two. I’m hoping to go to the UK at the end of next week.

And despite having gone to bed quite late last night, that didn’t stop me being wide awake at about 07:00 this morning. This sleep thing is becoming ridiculous.

Liz and I arrived at Radio Arverne’s place in Gerzat at about 10:40 for our 11:00 appointment and eventually it was about 11:47 before we started recording.

We did the four Radio Anglais programmes for December and then Bernard sprung it on me. Would I write another Christmas Special for an hour, to be broadcast in … errrr …. 2 weeks time?

I shall have to get my finger out, won’t I?

We got back to Sauret-Beserve 20 minutes late after all of that and I shot off to Montel-de-Gelat and the sawmill to pick up a load of timber.

I had to wait around there for ages as well as they didn’t (despite what they said on the ‘phone) have any treated wood so they treated it while I waited, and that took ages too.

And while I was there I was chatting with the staff and it turns out that the office girl is the wife of the Montel goalkeeper whose photo that I took was published in the paper the other week, and the office manager plays for Pontaumur and one of my photos of him scoring against Pionsat was published a few weeks before that.

There were two clients there from Pionsat too. One of them had an old Transit pick-up that was clearly custom-made. A PTAC of 3.3 tons for a start – that’s impressive. And he had so much wood dropped in it that it was sagging right down at the back end and he crawled all the way back to Pionsat at 40kph. 

And when I returned home and unloaded my wood I realised that I had forgotten the demi-chevrons that I need to finish off the greenhouse.

D’ohhhh.

And so I went upstairs and crashed out for a while instead.

Tuesday 4th October 2011 – I’VE BEEN DOING …

… real work today.

repairing lean to wall les guis virlet puy de dome franceI’ve been working on the back wall – the one adjacent to the farmer’s field – of the downhill-side lean-to this afternoon.

As you know, some of it fell down ages ago and last summer when Terry and I were doing the work at Lieneke’s, I used the leftover cement and concrete in the cement mixer to start to build it up again.

Today though, I built up the remainder of the rear half of the wall and now that’s more-or-less finished.

repairing lean to wall les guis virlet puy de dome franceNot without some issues though – not the least of which was trying to find the outer demi-chevron, that had fallen off the wall sometime while I was in Canada. That eventually came to light in a pile of brambles in the farmer’s field.

I’ve even pointed part of the inner side of the wall to use up all of the mortar that was left. That means that tomorrow afternoon I can make a start on the front half of the wall and that’s not going to be easy because there is quite a bit of that missing. That’s going to need quite a bit of work to put that right.

This morning,I was up at some kind of respectable hour which was just as well as Liz and I were a-radioing at Marcillat for Radio Tartasse. We’re still doing “autoentrepreneurs” with them but we shall be moving on shortly to talk about other things.

I’ve also almost-finished my match report for the footy on Sunday and I hope that I’ll have that on-line tomorrow.

As an aside, we had storm clouds gathering today over here – first clouds I’ve seen for ages. It almost rained as well and that would have been a surprise – I can’t remember the last time it rained here. What an Indian summer!

Monday 23rd August 2010 – It seems that …

… my inolvement in Lieneke’s roof has come to an end.

All that remains to be done is the plasterboarding, followed by the pointing up of the end wall, and then the tidying up. No labouring of any description is required and so after opening up the house for Terry and Simon I was paid off (well, not actually paid off because I’m not actually being paid). And I am not displeased by this either, as you can imagine.

First thing that I did was to stack all of the wood. There are tonnes of new wood lying around here that I haven’t managed to put away over the last few months and all of that is now neatly stacked and I know how much of it that I have. That took all of the morning.

After lunch I was in the barn, finishing the tidying up of the workbench, fitted the new vice that I bought in July last year, and did some more sorting-out of stuff. I can actually move around now inside the barn and that is progress. And the stuff that I have rediscovered ….

Tomorrow I’m going to make a start on the composting toilet and get that fitted. That involves making a box to put the bin in, and building a couple of walls. So all of these demi-chevrons and cheap tongue-and-grooving will start to disappear.

High time I organised the hygene around here.

Wednesday 4th August 2010 – We’ve finished this roof!

roofing guus lieneke les guis virlet puy de dome franceIt looks quite impressive from down here, and so indeed it ought to because although we started at about 09:00 this morning it was 19:00 when we finished!

The first bits were easy. Fitting the broken tiles to the edge of the roof and then trimming down with the angle grinder, and then fitting the demi-chevron that will support the edge tiles. No problem there.

The ridge tiles were another matter. We only had three and we needed six. There were two extra but one had a large lump missing and the other one had a hole in the top.

So we did the tour of builders’ merchants and considering that this is the most common tile in the whole area and almost every house has them, not a single builders’ merchant had any, or could tell us where to go for them.

But that gave me an idea and so I said to Terry “to the woods!”. Not too far away from where I live is a ruined building that had fallen down years ago and was totally abandoned. And taking our lives into our hands amongst decaying walls and fallen trees we managed to rescue three ridge tiles. I’ve seen better ridge tiles, I have to say, but what can you do?

Nailing them in was an issue as the central beam is … errr … rather thin but the other neighbour managed to find a 10-inch nail and we made do with a couple of transverse battens and some very long screws for the rest.

The pointing was uncomfortable but we managed it, but the real fun was reserved for the crown piece and the first of the edging pieces. I shudder to think how long we were messing around trying to get them to fit and I reckon that of the game of “twister” – the one where there is a couple of you on a mat trying to move your hands and feet into different positions – ever became an Olympic sport then Terry and I would win the gold medal judging by some of the contortions that we were doing. At one stage there were both of us lying on the roof nowhere near the ladders with Terry holding the crown piece in position with a screw in the screw hole and me swinging a hammer blind over my head and his head to hit that screw somewhere down the side of the roof where neither of us could see it.

But when that was done the rest was fairly easy. We reckoned that at about 17:00 we could knock off but seeing as how we weren’t far away then we may as well stay and cement everything in and have a day off tomorrow.

Yes, a day off tomorrow, and I’m having a lie-in. So you just watch some b@$t@rd spoil it by ringing me at 08:00!

Tuesday 3rd August 2010 – We cracked on with this roof …

fitting slates guus lieneke roof les guis virlet puy de dome france… today.

First thing that we did was to fit all of the laths, and it was far easier doing that this morning that it was trying to do it last night when all of the cement was still wet.

Once the laths were on we had to fit the voltige in between them. This is very thin wood and it is designed to stop snow and the like penetrating underneath the slates. Snow of course is a real issue round here in winter. Personally, I wouldn’t have gone for the voltige. Under my slates, as keen readers of my outpourings will know, I have sheets of waterproof plywood and you simply nail the laths on top. It’s much easier but then again this isn’t my roof. And of course we did my roof from scratch – here  we are trying to match it to whatever is there already – and has been there for probably 100 years – but that’s not an easy job.

Once the laths were on we refitted the tiles. And as we have extended the roof we didn’t have enough of course and this led to Yours Truly grubbing around in the undergrowth unearthing another 20 or so.

Tomorrow we need to fit the half-tiles to the edge and trim where necessary with the angle grinder, then a demi-chevron to support the edging tiles, then fix the edging tiles, then cement them in place, then fix the ridge tiles and finally fix the crown. Once all of that is done the rest of the chimney needs re-pointing and that will be that. It will then be time for phase two.

roof collapsed lean to les guis virlet puy de dome franceAfter Terry had gone home I carried on with the flooring in my lean-to. There was a strip of about 140mm that needed doing and luckily I had some lengths of 70mm left over from a previous project and so I used them.

You can see fairly well the hole in the floor. There will be a hatch there that will open upwards, with a set of stairs going downstairs. That’s much more civilised than having to shin up the fence and climb in via the window. It’ll look pretty good in here once I can sort out a tarpaulin to go over it where there is no roof as yet.

But if we finish the roof on Lieneke’s house pretty quickly and Simon comes to give us a hand with phase II then it won’t be much longer until I can crack on in here on a permanent basis.